• Title/Summary/Keyword: Road Construction Project

Search Result 271, Processing Time 0.029 seconds

Korean Engineering Firms' Competitiveness Change for the Last Decade

  • Jung, Mincheol;Kim, Handon;Choi, Seeun;Cho, Hyunsang;Oh, Donggeun;Kim, Jimin;Jang, Hyounseung
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.599-607
    • /
    • 2022
  • Recently, there has been a steady decrease in the proportion of the construction sector among Korean engineering firms. Thus it is essential for Korean engineering firms in the construction sector, which lack experience in overseas ventures, to identify and improve their competitiveness for successful overseas expansion. Therefore, in this study, changes in Korean engineering firms' capabilities for the last decade were analyzed to promote entry into overseas road and water resource engineering markets. Competency factors that require urgent improvement were derived based on Importance-Performance Analysis (IPA) as a tool for quantitative measurement. As a result, the factor that shows low performance compared to the importance is an overall understanding of the target country in the road and water resource areas. Knowledge of regulatory issues on design, the ability of time management software, and knowledge of the regulatory problems on construction safety are also insufficient. This study can be used as a research methodology to identify competitiveness that Korean engineering firms have to strengthen when they advance into overseas markets in roads, water resources, and other areas.

  • PDF

A Study on the Factors Affecting the Detailed Design Price of Road Construction Project (국내 도로공사 실시설계 대가영향요인에 관한 연구)

  • Lee, Mi-Young;Seo, Jung-Hoon;Oh, Se-Wook
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.9
    • /
    • pp.44-54
    • /
    • 2018
  • In the construction project, the design field has a crucial effect on the success or failure of the final product, and it is becoming more important as a core area of national industrial development because it creates high value added by technology. In addition, since the design work is carried out based on professional technical personnel, in order to secure the quality and competitiveness of the design, it is necessary to continuously input the excellent manpower and develop the technology, and above all, the appropriate design cost must be ensured. However, as a result of reviewing the current status of the design cost criterion in Korea, problems such as mixed cost calculation method, inaccuracy of construction cost ratio method, and inactivation of cost plus fixed fee method were analyzed. Therefore, it is difficult to calculate the fair value reflecting the characteristics of the project when calculating the construction design price. Therefore, the price criterion should be improved so that the fair value of the design can be determined according to the contents of the project, By analyzing the correlation and multiple regression analysis of the projects and price information of the completed road construction design, the factors influencing the design price and the level of influence were analyzed.

Microsurfacing Successes and Failures (마이크로서페이싱의 성공과 실패 사례)

  • Kim, Hyun Hwan;Benjamin, Broughton;Lee, Moon Sup;Lee, Soon Jae
    • International Journal of Highway Engineering
    • /
    • v.17 no.2
    • /
    • pp.71-78
    • /
    • 2015
  • PURPOSES: This study set out to investigate the current state of microsurfacing in Texas and compared the results with the current state of the practice nationwide. METHODS: For this study, case studies were extracted from the existing literature and compared with the data obtained both from site visits by the research team and data obtained from a survey by Texas Department of Transportation (TxDOT) personnel. The successes and failures of microsurfacing are detailed and explanations of different issues are outlined. Forensic studies from Texas are included in the descriptions of those microsurfacings that failed when configured as part of the cape seals. RESULTS : Microsurfacing has been shown to be an effective pavement preservation technique when applied to an appropriate road, at an appropriate timing, and as a remedy for certain issues. The failures experienced in Texas can mostly be attributed to cape seals and an inability to recognize structurally faulty pavement. CONCLUSIONS : When applied to an appropriate road, at an appropriate timing, and as a remedy for certain issues, microsurfacing has been shown to perform well in numerous case studies. The majority of microsurfacing failures are the result of poor project selection, usually involving the treatment being applied to structurally unsound pavement.

Interoperability Verification using BIM Case Models of Road Project (도로 프로젝트의 BIM 사례모델 구축을 통한 호환성 검증)

  • Moon, Hyoun-Seok;Kim, Chang-Yoon;Cho, Guen-Ha;Moon, Jin-Seok;Ju, Ki-Bum
    • Journal of KIBIM
    • /
    • v.5 no.1
    • /
    • pp.44-53
    • /
    • 2015
  • Recently, BIM has been widely applying in civil engineering projects centering on the private construction industry in order to establish self guidelines for spreading in practice. However, most BIM technologies and software are based on the architectural projects. In these environments, it is not easy to apply the BIM to a infrastructure field. Even BIM standards with IFC (Industry Foundation Classes) are also focusing on architectural projects. Especially, both private and public sectors do not know about how BIM delivery system should be performed, and how such deliverable should be submitted to the government yet. Thus, we need to analyze an application level of BIM S/W (Software) in real projects and verify their interoperability. Besides, since there are not any common standards that can exchange IFC models for civil engineering projects, we have many issues in converting as-built infrastructure models into IFC and delivering their design documents to the government. Accordingly, this study aims to perform a BIM process with commercial software for real road project after a detailed design process is finished and verify interoperability between diverse BIM software for securing BIM data reliability.

Application of Image Processing Techniques in Civil Engineering (건설 분야에 있어서 이미지 프로세싱 기술의 활용)

  • Shon Hong-Gyoo;Park Choung-Hwan;Lee Chul-Hee
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2006.04a
    • /
    • pp.58-62
    • /
    • 2006
  • In construction fields. numerous studies have attempted to find the solution of various emerging problems by the introduction of the high technologies of other areas in recent years. In Korea, based on the best IT infrastructure, much experimental studies which are trying to utilizing Photogrammetry, GSISC(Geo-Spatial Information System, Remote Sensing in construction project has been done. The purpose of this study is to analyze the trend of the technologies in the related-fields and examine the detailed image processing techniques. Moreover this paper provides the preparation to create technology road map for systematic research.

  • PDF

The Analysis of User Cost according to Timing of National Highway Pavement Maintenance-Focusing on the Maesang Bidge Section in Korea

  • Kim, Yunsik;Lee, Minjae
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.606-607
    • /
    • 2015
  • The traffic volume on the road shows various trends reflecting regional characteristics for monthly and hourly, and economic loss affecting users varies according to the selected period for the maintenance of road pavements. Therefore, in this study, the user cost (or delay cost) for monthly and hourly on the work zone near the Maesang Bridge Section on Poseung-Gu, Pyeongtaek-si, Gyeonggi-do was calculated using the time series models and VISSIM, and based on the result, the effect of user cost reduction according to the selection of best maintenance period was examined. The analysis result showed that the month of the lowest user cost occurred due to the maintenance of target section was January (10,293,258 KRW/Day×1km) and the month of the greatest user cost occurred was November (13,337,495 KRW/Day×1km).

  • PDF

Extraction of Road Structure Elements for Developing IFC(Industry Foundation Classes) Model for Road (도로분야 IFC 확장을 위한 도로시설의 구성요소 도출)

  • Moon, Hyoun-Seok;Choi, Won-Sik;Kang, Leen-Seok;Nah, Hei-Sook
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.2
    • /
    • pp.1195-1203
    • /
    • 2014
  • Since IFC (Industry Foundation Classes) 4 is based on the representation of 3D elements for an architecture project, and does not define standardized shapes for civil projects such as roads, bridges, and tunnels etc, it has limitations in securing interoperability for exchanging a shape information model for the civil projects. Besides, since road facilities have a linear reference, which is modeled along the center alignment, it is difficult the designers to create a standardized 3D road model. The aim of this study is to configure structure elements and their attribute for a road in the perspective of 3D design for developing a shape information model for the road. To solve these issues, this study analyzes the design documents, which consist of a road design handbook, guide, specifications and standards, and then extract shape elements and their attributes of road structures. Such shape elements are defined as an entity item and we review a hierarchical structure of a road shape defined by a virtual road model. The detailed elements and their attributes can be utilized as a 3D shape information model for constructing BIM (Building Information Modeling) environment for Infrastructures. Besides, it is expected that the suggested items will be utilized as a base data for extending to IFC for a road subdividing the detailed shapes, types and attributes for road projects.

Development of Standard Work Type to Utilize Drone at Expressway Construction Sites (고속도로 건설현장에서 드론 활용을 위한 표준공종 개발)

  • Lee, Suk Bae;Jeong, Min;Auh, Su Chang;Kim, Jong Jeon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.4
    • /
    • pp.461-468
    • /
    • 2021
  • The role of drones is increasing day by day in smart construction that manages construction sites with 3D data in every life cycles. This is because both the digital surface model (DSM) and the orthoimage obtained for the construction site through the drone are made of point cloud data. This study aims to develop standard work types for drone use in order to systematically utilize drones in expressway construction sites. For the study, two expressway construction sites in Korea were set as test beds, and construction types applicable to drones were derived and verified through a pilot project. As a result of the study, three construction work types were developed for road planning, road design and maintenance, respectively, and in road construction, twenty-one detailed construction types were developed for five construction work types. It is expected that drones can be used more systematically not only at expressway construction sites, but also at other road construction sites by utilizing the "standard work type at expressway construction site for drone use" developed in this study.

A Case Study on Construction of Front-Jacking method in Daejeon E.W. perforate Road Project (대전 동서관통도로 Front-Jacking공법 시공사례)

  • Kim Yong-Il;Hwang Nak-Yeon;Cha Jong-Whi;Jang Sung-Wook;Lee Nai-Yong
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.646-654
    • /
    • 2005
  • The crossing construction under railroad have two methods which are cut and cover and trenchless method. First, cut and cover method is an extremely limited method concerning non-running time. Whereas, trenchless method is free from restriction such as train speed and running time, and has the strong points of safe and rapid construction. Front Jacking method, one of the trenchless methods, is frequently applied recently due to its stability during construction and vantage of assuring schedule reliability. The procedure is that after minimizing interlocking friction with structure and earth pressure due to jacking the small steel tube, pulling the precast box manufactured at the field in the ground using PC strand and hydraulic Jack. This method is able to be applied regardless of section size and length of box and condition of soil. And that is also pro-environmental. This paper presents the case of Daejeon E. W. perforate Road Project applied with the Front Jacking method.

  • PDF

Development of An Information System for SOC Projects (SOC사업의 정보시스템 개발에 관한 연구 -원자력발전소건설 사업을 중심으로)

  • 윤은상;이화기
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.26 no.2
    • /
    • pp.46-54
    • /
    • 2003
  • SOC(Social Overhead Capital) projects such as road, power plant, airport or telecommunication facility construction require a large scale of cost, a long period of time and management of a number of sub-contractors. So systematic and efficient management tool in SOC projects is inevitable. Information system provides a valuable tool which can integrate and manage the large volume of information for SOC projects. This study investigates and analyzes the information system of nuclear power plant construction project. Based on this study, we can suggest the direction for designing information system for SOC projects.