• Title/Summary/Keyword: River downstream of dam

Search Result 254, Processing Time 0.021 seconds

Assessment of Physical River Disturbances in the Namgang-dam Downstream (남강댐하류의 물리적 하천교란 평가)

  • Kim, Ki-Heung
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.11 no.3
    • /
    • pp.74-86
    • /
    • 2008
  • To assessment the disturbances of the Namgang caused by dam construction, upstream area was selected for the reference reach and downstream area was selected for the comparison reach. And these reaches were surveyed and analyzed according to the assessment criteria of the river disturbances.The artificial factors of river disturbances were classified as river improvement works, dam construction and aggregate dredging. The indexes were physical factors as like epifaunal (bottom), embeddedness, velocity/depth regime, sediment deposition, channel flow status, channel alteration, frequency of riffles, bank stability, vegetative protection, riparian zone etc.The assessment results showed 46% of the assessment criteria which was serious status in dam downstream area and 89.5% of it which was excellent status in dam upstream.Finally, the results showed that physical river environment in downstream area was disturbed by the discharge control and the interception of sediment discharge by dam, consequently this disturbance give rise to impact of ecosystem in river.

Estimation of River Ecological Flow in the Downstream Section of Seomjingang Dam (섬진강 댐 하류 구간에서의 하천 생태유량 산정)

  • Bae, Jeonga;Lee, Chanjoo;Kim, Jin Kwan
    • Journal of The Geomorphological Association of Korea
    • /
    • v.28 no.2
    • /
    • pp.1-13
    • /
    • 2021
  • It is very important to secure sufficient river maintenance flow for the ecosystem, since the ecosystem in the downstream section of the dam is greatly affected by the stream maintenance flow from the dam. However, the amount of discharge from the Seomjingang Dam is decreasing year by year, this study estimated the ecological flow required for the downstream section of the Seomjingang Dam, which is known as the habitat of the endangered Acheilognathus somjinensis, in order to secure the river flow of the Seomjingang Dam. For this purpose, the proper discharge was calculated using the PHABSIM model, which is a hydrological survey and physical habitat simulation method, and the proper discharge of other fish species were also comprehensively reviewed. As a result of this study, the current river maintenance flow at the Seomjingang Dam partially satisfies the ecological maintenance flow including the Acheilognathus somjinensis in the downstream section of the Seomjingang Dam. However, this is recognized as the minimum discharge to maintain the ecology in the downstream section of the Seomjingang Dam, and it would be more desirable to secure larger river maintenance flow than this. This study can contribute the determination of the river maintenance flow of the Seomjingang Dam by proposing the river maintenance flow considering the fish habitat environment in the river.

Zooplankton and Phytoplankton Dynamics with the Construction of River Mouth Dam in Kum River Estuary, Korea

  • Kim, Say-Wa;Han, Myung-Soo;Lee, Kyung;Choi, Young-Kil;Yoo, Kwang-Il
    • Korean Journal of Ecology and Environment
    • /
    • v.35 no.2 s.98
    • /
    • pp.141-144
    • /
    • 2002
  • The construction of river mouth dam has prevented seawater from backwarding to upstream in Kum river estuary since 1990. Field observation on environmental factors, and zooplankton and phytoplankton dynamics have been carried out three times with two month interval in the summer and autumn in 2000 at three selected stations in Kum river estuary. Blockade of seawater flowing backward to upstream caused sharp contrast of zooplankton fauna and phytoplankton flora between upstream and downstream of the river mouth dam. Freshwater cladocerans i.e., Bosmina longisrostris and Daphnia galeata dominated in the upstream, and marine copepods of Acartia omorii and Paracalanus crassirostris occurred abundantly in downstream of the dam. Freshwater diatoms did not distributed in the downstream of the dam except Melosira varians, while marine diatom of Cylidrotheca closterium occurred in benthic waters bath in upstream and downstream of the dam. The construction of the river mouth dam seems to play an ecological role to blockade the input of marine organism into the upstream in Kum river estuary.

Laterally-Averaged Two-Dimensional Hydrodynamic and Turbidity Modeling for the Downstream of Yongdam Dam (용담댐 하류하천의 횡방향 평균 2차원 수리·탁수모델링)

  • Kim, Yu Kyung;Chung, Se Woong
    • Journal of Korean Society on Water Environment
    • /
    • v.27 no.5
    • /
    • pp.710-718
    • /
    • 2011
  • An integrated water quality management of reservoir and river would be required when the quality of downstream river water is affected by the discharge of upstream dam. In particular, for the control of downstream turbidity during flood events, the integrated modeling of reservoir and river is effective approach. This work was aimed to develop a laterally-averaged two-dimensional hydrodynamic and water quality model (CE-QUAL-W2), by which water quality can be predicted in the downstream of Yongdam dam in conjunction with the reservoir model, and to validate the model under two different hydrological conditions; wet year (2005) and drought year (2010). The model results clearly showed that the simulated data regarding water elevation and suspended solid (SS) concentration are well corresponded with the measured data. In addition, the variation of SS concentration as a function of time was effectively simulated along the river stations with the developed model. Consequently, the developed model can be effectively applied for the integrated water quality management of Yongdam dam and downstream river.

The Effect of Flood Discharge due to Dam Breach on Downstream Channel (댐붕괴시 홍수가 하천하류에 미치는 영향)

  • Ahn, Sang-Jin;Lee, Jun-Geun;Yeon, In-Sung;You, Hyung-Gyu
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.1666-1670
    • /
    • 2006
  • The purpose of this study is to analyze how a downstream channel is affected in case of hypothetical dam failure. The object of it is Hwacheon dam basin within the basin of North Han river. This study has analyzed the influence on Pyeonghwa(Peace) dam and Hwacheon dam supposing that the Imnam dam in North Korea on the upper stream of North Han river is failed hypothetically at the MFWL(maximum flood water level) by a deluge of rain. The model applied at the main study is NWS(National Weather Service) FLDWAV(Flood Wave Routing Model). Dam breach characteristics data are analyzed by making nine hypothetical scenarios on the basis of other studies on the shape and size of dam breach, time of failure and so on. Expected peak discharge through the breach is verified to have the propriety in comparison with empirical function which is developed on the basis of the case of dam breach in the foreign countries and it is observed that peak discharge is more increasing, as the time of breach gets shorter and the breach width gets bigger. As a result of main study, even though the Imnam dam is hypothetically failed down, there has no influence on the Hwacheon dam of the downstream as the extended Pyeonghwa dam on the downstream controls the volume of discharge properly.

  • PDF

An Analysis of Streambed Changes Downstream of Daecheong Dam

  • Seo, Hyeong-Deok;Jeong, Sang-Man;Kim, Lee-Hyung;Choi, Kyu-Ho
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.8 no.1
    • /
    • pp.103-108
    • /
    • 2008
  • Riverbed change is greatly influenced by artificial factors such as dam construction, gravel collection, and river improvement. This study simulated a long-term bed change based on the GSTARS3 model using actual data from the area downstream of the Geum River Daecheong Dam and compared the estimation with a section of the actual measurement. As a result, it was found that the section of the actual measurement was far lower than the result of the simulation in terms of long-term bed change. While the area downstream of Daecheong Dam displayed approximately an average of 2.29 m of streambed degradation on average while the upper stream area showed approximately 0.63 m of bed degradation over 24 years. In the simulation of the area downstream of Daecheong Dam based on the GSTARS3 model, similar bed degradation was observed. However, a great difference was detected between the result and the actual measurement. According to the cause analysis, the riverbed in the area downstream of Daecheong Dam has continuously degraded due to the dam construction and mass collection of gravel. The mass collection of gravel was the main cause of riverbed change. It was found that about 76% of all riverbed degradation was caused by the mass collection of gravel.

Basic Investigation about Hydro-Geomorphologic and Vegetation Cover Changes on the Regulated River - A Case of the Downstream River of Andong Dam/Imha Dam on the Nakdong River (조절된 하천의 수문지형학적 변화와 식생 피복의 변화에 관한 기초 조사 - 낙동강 안동댐/임하댐 하류 하천 사례)

  • Woo, Hyo Seop;Rhee, Dong Sup;Ahn, Hong Kyu;Lee, Chang Seok
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2004.05b
    • /
    • pp.1335-1339
    • /
    • 2004
  • A hydro-geomorphologic change in a sand bed channel reach and vegetation expansion by changes in the How regime is analyzed in this study. Field and aerial photo surveys, basic hydrological analysis about flow regime change due to two dams, Andong Dam and Imha Dam, on the upstream river and computer modeling are conducted. Two Dams in the study reach have obviously affected downstream channel in many ways including the bed particle coarsening, vegetation expansion on the sandbars and following river channel braiding. The phenomenon of no vegetation on the large point bar in front of Hahwe Village seems due to disturbance of the sandbar surface probably due to the cross flow in the meander reach during the flood. Another reason for no vegetation is that the sandbar on this reach has lower subsurface water lovels, as compared with the others in the up- and downstream of the reach where vegetation expanded, which would hinder vegetation from germinating and growing on the sandbar.

  • PDF

A Hydroacoustic Survey Analyzing Fish Populations and Their Distribution Upstream and Downstream of Changzhou Dam, China, Based on Spillway Conditions (중국 Changzhou댐의 방수로 운용에 따른 어류밀도와 분포에 관한 음향조사)

  • Tan, Xichang;Kang, Myoung-Hee;Tao, Jiangping;Li, Xinhui;Huang, Daoming
    • Korean Journal of Fisheries and Aquatic Sciences
    • /
    • v.44 no.4
    • /
    • pp.403-412
    • /
    • 2011
  • Hydroacoustic surveys were performed to clarify the density and spatial distribution of fish upstream and downstream of Changzhou Dam in the Pearl River, China, with regard to the condition of the spillways. Fish were densely distributed in the forebay of the upstream dam and the average fish density was 0.22 individuals/$m^3$ under open spillways on 24 June 2010, but when the spillways were closed on 25 June 2010, the fish in the upstream dam dispersed and the average fish density decreased to 0.007 individuals/$m^3$. Meanwhile, the average fish density in the downstream region was 0.28 individuals/$m^3$ before the spillway was opened on 24 May 2010, but it decreased to 0.08 individuals/$m^3$ on 26 June, just after the spillway was closed. The vertical distribution of fish upstream of the dam was not consistent. The target strength (TS) of fish upstream of the dam was larger than that of fish in the downstream region, although the distribution of TS was similar between the upstream and downstream regions. Therefore, we concluded that while numerous fish could swim to the upstream region while the spillways were open, closed spillways obstructed fish migrating upward from the downstream region.

Economic Analysis of Dam Operation Improvement by Dam Downstream River Improvement Works (II)-Economic Benefit and Cost Allocation Analysis (댐하류하천정비사업의 댐 운영개선 효과 경제성 분석 (II) -경제적 편익 및 비용분담률 분석)

  • Yoo, Seung-Hoon;Lee, Gwang-Man;Lee, Eul-Rae
    • Journal of Korea Water Resources Association
    • /
    • v.44 no.9
    • /
    • pp.765-776
    • /
    • 2011
  • Flood discharge capacity in a dam downstream reach has been decreased after dam construction because of the river cross section reduction impacted by farm lands, sand-bars and parking lots, etc. in river flood plains. Those obstacles being in the river inside areas have caused negative influences to the dam operation policy. Therefore, the dam downstream river improvement work associated with the dam operation improvement plan is under construction for removing reduction factors on the dam effective storage, assuring flood safety in the dam downstream river and incrementing dam operation benefits. But the project has issued some problems such as project feasibility, economic evaluation, cost allocation and benefit share, etc. Since a dam enterpriser has not committed such kind of project before, it is necessary to set up an objective analysis process and a quantitative financial valuation. This study examines the measurable economic benefits and the cost allocation of the project for the fairness between benefit owners (central government and water electricity enterprisers). As a result, the total economic benefit from 3 dams (Imha, Daechung and Youngdam Dam) accounts for 14.41 Billion Won/year. The financial valuation of K-water as a project enterpriser is approximately estimated at 40% of the total value and the government is 60%.

Effect of Flow-Regime Change due to Damming on the River Morphology and Vegetation Cover in the Downstream River Reach: A case of Hapchon Dam on the Hwang River (댐 건설에 의한 유황 변화에 따른 하류 하도에서 하천지형학적 변화 및 식생피복의 변화: 황강 합천댐 사례)

  • Choi, Sung-Uk;Yoon, Byung-Man;Woo, Hyo-Seop;Cho, Kang-Hyun
    • Journal of Korea Water Resources Association
    • /
    • v.37 no.1
    • /
    • pp.55-66
    • /
    • 2004
  • The Hapchon Dam, located upstream of the Hwang River, Korea, was constructed in December, 1988. Due to the lack of storage of water, the dam gate has not been operated during last ten years. Thus, a new ecosystem has been established at the downstream part of the dam. This is not a common phenomenon which can be found elsewhere in the country. The present study investigates the effect of flow regime change on the river morphology and vegetation cover in the downstream river reach after the dam construction. The analysis of flow regime is carried out, and the changes in bed elevation and in channel cross sections are examined. Site investigations including tree ring tests are also performed. The increase in the vegetation cover is estimated by comparing aerial photographs taken before and after dam construction.