• 제목/요약/키워드: Risk-based approach

검색결과 920건 처리시간 0.034초

Caries Management by Risk Assessment (CAMBRA) 모형에 따른 임상 예방치과 및 치위생 진료 (Clinical Preventive Dental and Dental Hygiene Practice by Caries Management by Risk Assessment (CAMBRA))

  • 조영식
    • 치위생과학회지
    • /
    • 제12권6호
    • /
    • pp.545-557
    • /
    • 2012
  • Dental caries is biofilm induced disease throughout life and is recognized significant oral health problem. This article reviewed new trends in dental caries management by risk assessment, including history, protocol/guideline, and collaborated model. Dental caries prevention and treatment according to caries management by risk assessment (CAMBRA) model is patient-centered, risk-based, evidence-based practice. Team approach is necessary and clinician need to integrate science, practice and product. Dental hygienist take a important role in implementing CAMBRA. CAMBRA model could be incorporated into clinical dental hygiene education based on dental hygiene process of care as standard of dental hygiene practice and education. Dentist and dental hygienist able to provide scientific and ethical care managing dental caries by risk assessment.

Agent Based Information Security Framework for Hybrid Cloud Computing

  • Tariq, Muhammad Imran
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • 제13권1호
    • /
    • pp.406-434
    • /
    • 2019
  • In general, an information security approach estimates the risk, where the risk is to occur due to an unusual event, and the associated consequences for cloud organization. Information Security and Risk Management (ISRA) practices vary among cloud organizations and disciplines. There are several approaches to compare existing risk management methods for cloud organizations but their scope is limited considering stereo type criteria, rather than developing an agent based task that considers all aspects of the associated risk. It is the lack of considering all existing renowned risk management frameworks, their proper comparison, and agent techniques that motivates this research. This paper proposes Agent Based Information Security Framework for Hybrid Cloud Computing as an all-inclusive method including cloud related methods to review and compare existing different renowned methods for cloud computing risk issues and by adding new tasks from surveyed methods. The concepts of software agent and intelligent agent have been introduced that fetch/collect accurate information used in framework and to develop a decision system that facilitates the organization to take decision against threat agent on the basis of information provided by the security agents. The scope of this research primarily considers risk assessment methods that focus on assets, potential threats, vulnerabilities and their associated measures to calculate consequences. After in-depth comparison of renowned ISRA methods with ABISF, we have found that ISO/IEC 27005:2011 is the most appropriate approach among existing ISRA methods. The proposed framework was implemented using fuzzy inference system based upon fuzzy set theory, and MATLAB(R) fuzzy logic rules were used to test the framework. The fuzzy results confirm that proposed framework could be used for information security in cloud computing environment.

20인승급 소형 위그선의 안전성 평가 (The Safety Assessment of Small WIG Craft in the 20-Passenger Class)

  • 이순섭;이종갑
    • 대한조선학회논문집
    • /
    • 제46권2호
    • /
    • pp.179-188
    • /
    • 2009
  • WIG crafts are a high speed vessel with features of dynamic supported craft. These crafts, which are predominantly of light weight and operate any substantially greater speeds than conventional craft such as bulk carrier, tanker, container ship, etc., could not be accommodated under traditional maritime safety instruments. It means that there is the need for risk and safety levels to be assessed on a holistic basis, recognizing that high levels of operator training, comprehensive and thoroughly implemented procedures, high levels of automation and sophisticated software can all make significant contributions to risk reduction. To response this requirement, the Interim Guideline for WIG craft(MSC/Circ.1054) were developed in the view of the configuration of WIG craft, which fall between the maritime and aviation regulatory regimes. This paper reviews a safety assessment process and methodology to be used in the design phase of a new ship. The process and methodology is based on the risk-based approach and is applied to safety assessment in concept development phase of small WIG craft in the 20-person class.

The Impact of Customer Engagement on Perceived Value in the Context of E-commerce Livestreaming

  • Youcheng WANG
    • 유통과학연구
    • /
    • 제22권2호
    • /
    • pp.51-61
    • /
    • 2024
  • Purpose: This comprehensive study delves into the intricate relationship between customer engagement, perceived risk, and perceived value within China's burgeoning e-commerce livestreaming sector. It focuses on how different customer engagement types in livestreaming influence their perception of value and risk. Research Design, Data, and Methodology: Adopting a convenience sampling approach, this research scrutinizes data collected from 852 consumers actively involved in e-commerce livestreaming shopping. Participants provided their insights through a meticulously designed questionnaire survey. Structural equation modeling helped examine the interplay between customer engagement, perceived risk, and value. Results: Significant impacts of customer engagement on perceived value and risk were found. Observation-based, conversation-based, and action-based engagements enhance perceived risk, while conversation-based and action-based engagement reduce perceived risk. Interestingly, observation-based engagement did not significantly affect perceived risk. The study also uncovered that perceived risk negatively impacts perceived value. Conclusions: The research offers insights into customer behavior and value creation in e-commerce livestreaming. It underscores how different engagement types affect perceived value and risk, aiding e-commerce platforms and businesses in strategy development to improve customer experience and minimize risks, enhancing perceived value in this dynamic sector. Enhances understanding of customer engagement dynamics in China's e-commerce livestreaming, guiding strategic development.

Development of Semantic Risk Breakdown Structure to Support Risk Identification for Bridge Projects

  • Isah, Muritala Adebayo;Jeon, Byung-Ju;Yang, Liu;Kim, Byung-Soo
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.245-252
    • /
    • 2022
  • Risk identification for bridge projects is a knowledge-based and labor-intensive task involving several procedures and stakeholders. Presently, risk information of bridge projects is unstructured and stored in different sources and formats, hindering knowledge sharing, reuse, and automation of the risk identification process. Consequently, there is a need to develop structured and formalized risk information for bridge projects to aid effective risk identification and automation of the risk management processes to ensure project success. This study proposes a semantic risk breakdown structure (SRBS) to support risk identification for bridge projects. SRBS is a searchable hierarchical risk breakdown structure (RBS) developed with python programming language based on a semantic modeling approach. The proposed SRBS for risk identification of bridge projects consists of a 4-level tree structure with 11 categories of risks and 116 potential risks associated with bridge projects. The contributions of this paper are threefold. Firstly, this study fills the gap in knowledge by presenting a formalized risk breakdown structure that could enhance the risk identification of bridge projects. Secondly, the proposed SRBS can assist in the creation of a risk database to support the automation of the risk identification process for bridge projects to reduce manual efforts. Lastly, the proposed SRBS can be used as a risk ontology that could aid the development of an artificial intelligence-based integrated risk management system for construction projects.

  • PDF

철도시스템의 위험도 허용 기준 개발에 관한 연구 (The Study of Risk Acceptance Criteria for Railway System)

  • 김영상;맹희영;왕종배
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.796-805
    • /
    • 2008
  • Safety Management of Korean railway industry has been rapidly changed into a risk-based approach adopted by developed countries since Railway Safety Act 2004, Rolling Stock Risk Assessment Guidance and its following regulations came into force. The fundamental requirements for the risk-based safety management is to carry out a systematic hazard identification and quantified risk analyses including cost-benefit analyses, but there has been rare a serious discussion over risk acceptance criteria and value of life in order to be able to judge the results of risk analyses and carry out cost-benefit analyses. This study presents the results of a review of risk acceptance criteria and value of life which may be adoped to Korean railway industry through the analyses with comparison of risk accepatnce principles and risk accepatnce criteria which have been already applied to other countries or other railway operators.

  • PDF

FMEA에서 시간을 고려한 기대손실모형에 기초한 위험 평가 (Risk Evaluation Based on the Time Dependent Expected Loss Model in FMEA)

  • 권혁무;홍성훈;이민구
    • 한국안전학회지
    • /
    • 제26권6호
    • /
    • pp.104-110
    • /
    • 2011
  • In FMEA, the risk priority number(RPN) is used for risk evaluation on each failure mode. It is obtained by multiplying three components, i.e., severity, occurrence, and detectability of the corresponding failure mode. Each of the three components are usually determined on the basis of the past experience and technical knowledge. But this approach is not strictly objective in evaluating risk of a given failure mode and thus provide somewhat less scientific measure of risk. Assuming a homogeneous Poisson process for occurrence of the failures and causes, we propose a more scientific approach to evaluation of risk in FMEA. To quantify severity of each failure mode, the mission period is taken into consideration for the system. If the system faces no failure during its mission period, there are no losses. If any failure occurs during its mission period, the losses corresponding to the failure mode incurs. A longer remaining mission period is assumed to incur a larger loss. Detectability of each failure mode is then incorporated into the model assuming an exponential probability law for detection time of each failure cause. Based on the proposed model, an illustrative example and numerical analyses are provided.

베이지안넷 기반의 프로젝트 일정리스크 평가 (Project Schedule Risk Assessment Based on Bayesian Nets)

  • 성홍석;박철순
    • 산업경영시스템학회지
    • /
    • 제39권1호
    • /
    • pp.9-16
    • /
    • 2016
  • The project schedule risk in the engineering and facility construction industry is increasingly considered as important management factor because the risks in terms of schedule or deadline may significantly affect the project cost. Especially, the project-based operating companies attempt to find the best estimate of the project completion time for use at their proposals, and therefore, usually have much interest in accurate estimation of the duration of the projects. In general, the management of projects schedule risk is achieved by modeling project schedule with PERT/CPM techniques, and then performing risk assessment with simulation such as Monte-Carlo simulation method. However, since these approaches require the accumulated executional data, which are not usually available in project-based operating company, and, further, they cannot reflect various schedule constraints, which usually are met during the project execution, the project managers have difficulty in preparing for the project risks in advance of their occurrence in the project execution. As these constraints may affect time and cost which role as the crucial evaluation factors to the quality of the project result, they must be identified and described in advance of their occurrence in the project management. This paper proposes a Bayesian Net based methodology for estimating project schedule risk by identifying and enforcing the project risks and its response plan which may occur in storage tank engineering and construction project environment. First, we translated the schedule network with the project risks and its response plan into Bayesian Net. Second, we analyzed the integrated Bayesian Net and suggested an estimate of project schedule risk with simulation approach. Finally, we applied our approach to a storage tank construction project to validate its feasibility.

Bayesian-based seismic margin assessment approach: Application to research reactor

  • Kwag, Shinyoung;Oh, Jinho;Lee, Jong-Min;Ryu, Jeong-Soo
    • Earthquakes and Structures
    • /
    • 제12권6호
    • /
    • pp.653-663
    • /
    • 2017
  • A seismic margin assessment evaluates how much margin exists for the system under beyond design basis earthquake events. Specifically, the seismic margin for the entire system is evaluated by utilizing a systems analysis based on the sub-system and component seismic fragility data. Each seismic fragility curve is obtained by using empirical, experimental, and/or numerical simulation data. The systems analysis is generally performed by employing a fault tree analysis. However, the current practice has clear limitations in that it cannot deal with the uncertainties of basic components and accommodate the newly observed data. Therefore, in this paper, we present a Bayesian-based seismic margin assessment that is conducted using seismic fragility data and fault tree analysis including Bayesian inference. This proposed approach is first applied to the pooltype nuclear research reactor system for the quantitative evaluation of the seismic margin. The results show that the applied approach can allow updating by considering the newly available data/information at any level of the fault tree, and can identify critical scenarios modified due to new information. Also, given the seismic hazard information, this approach is further extended to the real-time risk evaluation. Thus, the proposed approach can finally be expected to solve the fundamental restrictions of the current method.