• 제목/요약/키워드: Risk-Based Inspection (RBI)

검색결과 47건 처리시간 0.02초

개선된 RBI 기법을 이용한 석유화학설비의 위험도평가 (Risk Assessment of Petrochemical Equipments Using Enhanced RBI Technique)

  • 이상민;송기훈;장윤석;최재붕;김영진;한상인;최송천
    • 대한기계학회논문집A
    • /
    • 제29권10호
    • /
    • pp.1392-1398
    • /
    • 2005
  • API 581 guideline provides a methodology for calculating the risks of equipments in refinery or petrochemical plant. However, especially in part of the consequence of failure, there is a major limitation of its application to the petrochemical plant directly since only a representative material is considered in calculating the risk while the equipment is composed of numerous materials. The objectives of this paper are to propose an enhanced risk-based inspection (RBI) technique to resolve shortcomings inclusive of the above issue and to assess the risks of typical petrochemical equipments. In this respect, a program incorporating material database was developed to fully incorporate the characteristics of different materials. The proposed RBI program consists of qualitative, semi-quantitative and quantitative risk evaluation modules in which toxic materials as well as representative materials were selected automatically for comparison to those in the current guideline. It has been applied to assess the risks of equipments in ethylene facilities of petrochemical plants. Thereby, more realistic evaluation results were obtained and applicability of the proposed RBI program was proven.

타워크레인의 정량적 위험성 평가가법에 관한 연구(FMEA 기법 위주) (A Quantitative Risk Analysis of Related to Tower Crane Using the FMEA)

  • 심규형;이동호
    • 한국안전학회지
    • /
    • 제25권6호
    • /
    • pp.34-39
    • /
    • 2010
  • 본 연구는 건설현장에서 사용하고 있는 타워크레인에 대한 검사기관의 검사결과를 토대로 위험성과 중요도를 미리 검토하고 분석하여, 상호간의 검사 기준에 대한 판정기준을 정립하고 검사능력을 UP-Grade 시킬 수 있는 기회로 활용하기 위한 방안으로, 적절한 평가방법을 도입하여 객관적인 평가 모텔을 제시하는데 목적이 있다. 타워크레인은 건축물 또는 구조물 등, 건설현장에 설치되어 짧게는 2~3개월부터 2년 남짓 동안 지상에서 20~150M 이상 높은 곳으로 건설자재와 중량물 등을 실어 나르는 기계장치로, 건설 현장에서는 없어서는 안될 중요한 설비이다. 그러나 설치해서 사용하는 기간이 짧고, 건설 현장의 기술자들이 타워크레인에 대한 전문 기술력이 부족하여 체계적이고 정량적인 안전관리가 이루어지지 않고 있다. 이러한 문제점을 해결하기 위해서 전문가들의 지식과 경험을 바탕을 한 지식기반기법과 타워크레인에 적용 가능한 RBI절차 연구의 일환으로 정량적 위험우선순위를 FMEA기법을 활용하여 RPN을 적용시켜 보았다. 일반적인 RBI 80/20 Rule을 적용시켜 보았을 때, 위험도가 높은 부분은 와이어로프, 권과방지장치 및 브레이크와 권상감속기 등으로 나타났다. 하지만, 아직 타워크레인에 대한 위험분석이 제대로 이루어지지 않아 미흡한 부분이 많지만, 본 연구를 시작으로 좀 더 경험과 지식이 풍부한 전문가들이 나서서 중요 정보를 공유하고 data base화 하여, 타워크레인에 대한 활발한 RBI 기법의 보완과 지속적인 연구개발이 필요하다.

정량적 원인분석이 가능한 위험기반검사(KS-RBI)에 의한 화학설비의 위험도 경감방안 (Reduction Method for the Risk of the Chemical Facilities by KS-RBI Program Supporting the Quantitative Cause Analysis)

  • 김태옥;이헌창;조지훈;김규정;권혁면
    • 한국가스학회지
    • /
    • 제12권2호
    • /
    • pp.110-117
    • /
    • 2008
  • 정량적 원인분석이 가능한 위험기반검사 프로그램(KS-RBI Ver. 3.0)을 사용하여 화학설비의 위험도를 산출하고, 설비의 위험도를 경감할 수 있는 방안을 모색하였다. 그 결과, 손상메커니즘, 검사횟수 및 검사 유효성을 고려하여 사고발생 가능성(LOF)을 줄이고, 검출, 차단 및 완화 시스템의 수준을 변경하여 사고 피해 크기(COF)를 감소시킴으로써 설비의 위험도를 낮출 수 있었다. 특히, 고 위험도를 낮추기 위해서는 LOF와 COF를 동시에 낮출 수 있는 방안을 모색할 필요가 있으며, 설비의 위험도를 경감함으로써 설비의 안전성 향상으로 사고피해 감소는 물론 검사주기 연장으로 검사비용 및 인건비 절감 등을 기대할 수 있다.

  • PDF

확률분포에 따른 불확실한 변수를 고려한 위험도기반의 정성적 평가 (Qualitative RBI Analysis in Considered with Uncertain Variables by Probabilistic Distribution)

  • 허호진;정재욱;김주동;최재붕;최송천;황인주
    • 설비공학논문집
    • /
    • 제25권2호
    • /
    • pp.70-78
    • /
    • 2013
  • Plants which are having conditions of high temperature and pressure always are exposed to danger. In order to prevent unexpected accidents, safety management that can effectively and appropriately examine facilities is required in plant operation. RBI(Risk-Based Inspection) technology in API 581 is one of standard management technique for evaluating risk on petroleum plants. There are qualitative and quantitative assessments in RBI methodology. Quantitative evaluation step is complex and required much information, so high-risk facilities in plant are selected firstly by qualitative method. Qualitative RBI is performed by choosing the answer in prepared questionnaire. However, it is difficult to believe thoroughly results from survey including ambiguous information. In this study, the procedure of qualitative RBI analysis with considering probability distribution concept were proposed by using Monte Carlo simulation method in order to increase reliability in spite of uncertain factors. In addition, qualitative risk of cooling system for LNG plant was evaluated using proposed procedure. Although 20 items of total 39 assessment items are applied to uncertain factors, risk section of high probability(89%) were verified. The detailed results were described in manuscript.

Research on Risk-Based Piping Inspection Guideline System in the Petrochemical Industry

  • Tien, Shiaw-Wen;Hwang, Wen-Tsung;Tsai, Chih-Hung
    • International Journal of Quality Innovation
    • /
    • 제7권2호
    • /
    • pp.97-124
    • /
    • 2006
  • The purpose of this research is to create an expert risk-based piping system inspection model. The proposed system includes a risk-based piping inspection system and a piping inspection guideline system. The research procedure consists of three parts: the risk-based inspection model, the risk-based piping inspection model, and the piping inspection guideline system model. In this research procedure, a field plant visit is conducted to collect the related domestic information (Taiwan) and foreign standards and regulations for creating a strategic risk-based piping inspection and analysis system in accordance with the piping damage characteristics in the petrochemical industry. In accordance with various piping damage models and damage positions, petrochemical plants provide the optimal piping inspection planning tool for efficient piping risk prediction for enhancing plant operation safety.

API-RBI BRD에 따른 RBI 소프트웨어의 개발

  • 송정수;김주호;이승재;최송천;김지윤;윤기봉
    • 한국산업안전학회:학술대회논문집
    • /
    • 한국안전학회 2001년도 공동학술대회
    • /
    • pp.381-386
    • /
    • 2001
  • RBI(Risk-Based Inspection)는 각각의 설비별로 위험등급 또는 위험도를 산정하고 이에 따라 검사의 우선 순위, 방법, 주기 및 일정계획 등을 수립하여 기술적인 근거에 의해 종합적이고 체계적인 검사를 수행하는 것이다. 이와 같이 RBI는 위험도를 정성적/정량적으로 평가하여 위험의 대부분을 내포하고 있는 30% 내외의 소수의 설비를 찾아내어 이에 대해 최적의 방법으로 인적, 물적 자원을 집중적으로 투입함으로써 안전성 확보와 함께 경제성을 추구하는 효율적인 기법이라 할 수 있다.(중략)

  • PDF

화력발전설비 위험도 평가를 통한 기기별 정비주기 예측 (Prediction of Maintenance Period of Equipment Through Risk Assessment of Thermal Power Plants)

  • 송기욱;김범신;최우성;박명수
    • 대한기계학회논문집A
    • /
    • 제37권10호
    • /
    • pp.1291-1296
    • /
    • 2013
  • 위험도 평가 기술은 주로 플랜트의 많은 운영설비 중 대형사고나 피해를 유발할 수 있는 위험설비를 선별하는 목적으로 개발되었다. 설비의 위험도를 평가하여 위험도의 크기에 따라 순위를 정하고 이 순위를 기준으로 정비자원을 투입하는 순서나 정비작업의 시급성을 판단한다. 위험도란 고장이 발생할 확률과 고장이 발생할 경우에 수반되는 파손피해의 곱으로 정의된다. 위험도 평가방법으로는 간단한 손상 및 고장 평가기법을 이용하여 기본적인 고장확률 데이터를 확보하고 정성적인 문진을 통해 이를 보완하는 준 정량적 방법이 많이 사용되고 있다. 본 논문에서는 준 정략적 평가를 이용하여 석탄화력발전소의 보일러설비에 대한 위험도 평가를 수행하고 이를 기반으로 설비 별차기 정비주기를 선정하였다.