• 제목/요약/키워드: Risk-Based Inspection (RBI)

검색결과 47건 처리시간 0.022초

API 기준에 근거한 RBI 절차 개발 및 소프트웨어의 구현 (II) -준정량적 접근법- (Development of RBI Procedures and Implementation of a Software Based on API Code (II) - Semi-Quantitative Approach)

  • 송정수;심상훈;권정락;윤기봉
    • 한국안전학회지
    • /
    • 제17권4호
    • /
    • pp.110-118
    • /
    • 2002
  • During the last ten years, the need has been increase for reducing maintenance cost for aged equipments are ensuring safety, efficiency and profitability of petrochemical and refinery plants. American Petroleum institute(API) developed a code, API 581 for proposing standard procedures of risk based inspection. Even though the API 581 code covers general RBI procedures, there must be some limitations. In this study, a semi-quantitative assessment algorithm for RBI based on the API 581 code was reconstructed for developing an RBI software. The user-friendly realRBI software is developed with a module for evaluation semi-quantitative risk category using the potential consequence factor and the likelihood factor. Also, inspection planning module for inspection time and inspection method for equipments are included.

RBI 소프트웨어 개발 및 국내 석유화학 플랜트에의 적용사례 (A Study on Development and Implementation of Risk Based Inspection Software to a Petrochemical Plant)

  • 심상훈;한상인;윤기봉
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2003년도 춘계학술대회
    • /
    • pp.598-603
    • /
    • 2003
  • During the last ten years, the need has been increased for reducing maintenance cost for aged equipments and ensuring safety, efficiency and profitability of petrochemical and refinery plants. RBI (Risk Based Inspection) methodology is one of the most promising technologies satisfying the need in the field of integrity management. In this study, a user-friendly software, realRBI for RBI based on the API 581 code was developed and a quantitative analysis was performed for over 500 equipments in a domestic plant whose operating time reaches about 13 years. Current risks for each equipment parts were evaluated and risk based prioritization were determined as a conclusion.

  • PDF

Corrosion Assessment by Using Risk-Based Inspection Method for Petrochemical Plant - Practical Experience

  • Choi, Song-Chun;Song, Ki-Hun
    • Corrosion Science and Technology
    • /
    • 제8권3호
    • /
    • pp.119-125
    • /
    • 2009
  • Corrosion assessment has a number of uses but the use considered here is as a precursor to Risk-Based Inspection (RBI) planning. Systematic methods consisting of technical modules of RBI program were used to assess the effect of specific corrosion mechanism on the probability of failure in equipments of petrochemical plants. Especially in part of the damage and corrosion assessment, screening step involved evaluating the combinations of process conditions and construction materials for each equipment item in order to determine which damage mechanisms are potentially active. For general internal corrosion, either API 510 or API 570 was applied as the damage rate in the calculation to determine the remaining life and inspection frequency. In some cases, a measured rate of corrosion may not be available. The technical modules of RBI program employ default values for corrosion, typically derived from published data or from experience with similar processes, for use until inspection results are available. This paper describes the case study of corrosion and damage assessment by using RBI methodology in petrochemical plant. Specifically, this paper reports the methodology and the results of its application to the petrochemical units using the $KGS-RBI^{TM}$ program, developed by the Korea Gas Safety Corporation to suit Korean situation in conformity with API 581 Codes.

API RP 581 Code를 기반으로한 LNG 플랜트의 Risk-Based Inspection(RBI) 기술 개발 (Development of Risk-Based Inspection(RBI) Technology for LNG Plant Based on API RP581 Code)

  • 최송천;최재붕;황인주
    • Corrosion Science and Technology
    • /
    • 제11권5호
    • /
    • pp.179-183
    • /
    • 2012
  • As one of promising solutions to overcome high oil price and energy crisis, the construction market of high value-added LNG plants is spotlighted world widely. The purpose of this study is to introduce LNG-RBI system to develop risk assessment technology with RAM(Reliability, Availability, Maintainability) modules against overseas monopolization. After analyzing relevant specific features and their technical levels, risk assessment program, non-destructive reliability evaluation strategy and safety criteria unification class are derived as core technologies. These IT-based convergence technologies can be used for enhancement of LNG plant efficiency, in which the modular parts are related to a system with artificial optimized algorithms as well as diverse databases of facility inspection and diagnosis fields.

한국형 위험기반검사(K-RBI) 프로그램 개발 (Development of Program for K-RBI)

  • 권혁면;임대식
    • 대한기계학회논문집A
    • /
    • 제30권1호
    • /
    • pp.90-96
    • /
    • 2006
  • Since Risk Based Inspection(RBI) was introduced to quality the risks for jet engine and nuclear power, the technique has been expanded to the area of petrochemical plant. Recently among USA and Europe, window-based computer programme for RBI has been rapidly developed. When local companies procure such program to apply to their plants, it is difficult to build up a proper database as well as expect a good result. In this regards, K-RBI programme accustomed to Korean environments was developed. After completion of the programme in 2004, it was tested by 2 local petrochemical plants and was produced fruitful results. By using these programme, we are expecting accident prevention through risk based planning and implementing of equipment inspection, and saving dollars caused by procuring foreign expensive programme.

플랜트의 위험도 관리를 위한 GUI 기반 RBI시스템 개발 (Development of GUI based RBI system for managing the plant risk)

  • 이호준;김유빈;최정우;윤기봉
    • 한국에너지공학회:학술대회논문집
    • /
    • 한국에너지공학회 2010년도 춘계학술 발표회
    • /
    • pp.176-176
    • /
    • 2010
  • 현재 국내 에너지 설비의 안전에 대한 관심이 고조되면서 안전 관련 기술(수명, 정비, 사고 관련 모든 기술)의 개발, 도입이 활발히 이루어지고 있다. 하지만, 많은 경우 기반기술 연구에 집중되어 있어 이를 융/복합하여 현장에 활용할 수 있는 응용기술 개발이 요구되고 있다. 에너지 플랜트 설비(발전, 석유화학 및 정유 플랜트 등)의 최적 안전 관리를 위해서는 설비의 위험도(risk)에 근거한 관리가 가장 이상적이며, 이를 위해서는 기준이 될 수 있는 위험도 기반 검사(risk-based inspection, RBI) 가이드라인과 사용자가 쉽고 효율적으로 위험도를 관리할 수 있는 도구 즉 시스템이 필요하다. 본 연구에서는 위험도 기반 검사 가이드라인과 IT(information technology) 기술을 융/복합하여 사용자가 쉽고 효율적으로 사용할 수 있는 GUI(graphic user interface) 기반의 위험도 기반 설비 관리 시스템을 연구 개발 하였다.

  • PDF

화학설비의 안전성 향상을 위한 위험기반검사의 적용 (Application of Risk Based-Inspection for the Safety Improvement of the Chemical Facilities)

  • 김태옥;이헌창;신평식;최병남;조지훈;정성권;김오환;신동일
    • 한국가스학회지
    • /
    • 제10권3호
    • /
    • pp.13-19
    • /
    • 2006
  • 화학설비의 안전성을 향상시키기 위하여 API-581 절차에 따라 국내실정에 맞도록 개발한 한국형 위험기반검사(K-RBI) 프로그램을 화학설비에 적용하였다. 그 결과, 적용 사업장의 자체 안전관리 수준평가(PSM), 적용 대상공정의 위험도, 고정설비와 배관의 위험도, 그리고 설비의 손상메카니즘을 알 수 있었으며, 공정 위험도와 설비상태로부터 설비의 검사주기를 제시할 수 있었다. 따라서 검사주기 연장 등으로 인한 정비비용의 절감효과와 더불어 생산성 향상, 설비 신뢰도 향상, 설비의 유지 보수 및 이력관리의 전산화 등을 실현할 수 있었다.

  • PDF

CDU 내 탈황공정의 내부부식 된 파이프라인을 대상으로 한 RBI기법을 이용한 위험성 평가 (Risk Assessment Using RBI for Internal Corroded Pipelines in CDU Desulfurization Process)

  • 임동휘;정태준;이인동;정인희;고재욱
    • 한국가스학회지
    • /
    • 제23권3호
    • /
    • pp.33-39
    • /
    • 2019
  • 2010년대에 들어서 노후화된 공정으로 인하여 많은 공장들의 안전이 보장되지 않은 채로 가동되고 있다. 공정 및 설비의 노후화 문제를 근본적으로 해결하기는 어렵지만, 사전에 위험성 평가로 위험을 예방할 수있다. 본 연구는 CDU(Crude Distillation Unit)의 탈황 장비에 있는 배관에서 황으로 인한 부식을 타겟으로 지정하였고, API RP 581를 참고한 RBI(Risk Based Inspection)기법으로 위험성 평가를 실시하였다. RBI 기법은 Frequency와 Consequence의 조합으로 Risk를 표현하고, 이들을 바탕으로 Risk Matrix를 만든다. 본 연구는 배관의 Hole Size를 Small과 Medium으로, Frequency의 감도는 'Low'로 선택하여 진행하였다. 기준을 통해 만들어진 Risk Matrix를 참고하여 배관에서 황으로 인한 부식의 사고 위험성을 평가하고 향후 사고 방지 계획을 세울 수 있다. 또한 이와 비슷한 방법으로 노후화에 대한 예방을 한다면 보이지 않는 크고 작은 사고들도 예방 할 수 있다.

API기준에 근거한 RBI 절차 개발 및 소프트웨어의 구현 (I) 정성적 접근법 (Development of a RBI Procedure and Implementation of a Software Based on API Code (I) - Qualitative Approach)

  • 심상훈;송정수;김지윤;윤기봉
    • 한국안전학회지
    • /
    • 제17권3호
    • /
    • pp.66-72
    • /
    • 2002
  • During the last ten years, effort has been made for reducing maintenance cost for aged equipments and ensuring safety, efficiency and profitability of petrochemical and refinery plants. Hence, it was required to develop advanced methods which meet this need. RBI(Risk Based Inspection) methodology is one of the most promising technology satisfying the requirements in the field of integrity management. In this study, a qualitative assessment algorithm for RBI based on the API 581 code was reconstructed for developing an RBI software. The user-friendly realRBI software is developed with a module for evaluating qualitative risk category using the potential consequence factor and the likelihood factor.

RBI 절차의 석유화학 플랜트 적용에 관한 연구 (A Study on Implementation of Risk Based Inspection Procedures to a Petrochemical Plant)

  • 송정수;심상훈;김지윤;윤기봉
    • 대한기계학회논문집A
    • /
    • 제27권3호
    • /
    • pp.416-423
    • /
    • 2003
  • During the last ten years, the need has been increased for reducing maintenance cost for aged equipments and ensuring safety, efficiency and profitability of petrochemical and refinery plants. RBI (Risk Based Inspection) methodology is one of the most promising technologies satisfying the need in the field of integrity management. In this study, a user-friendly software, realRBl for RBI based on the API 581 code was developed. This software has modules for evaluating qualitative and semi-quantitative risk level, analyzing quantitative risks using the potential consequences of a failure of the pressure boundary, and assessing the likelihood of failure. A quantitative analysis was performed for 16 columns in a domestic NCC (Naphtha Cracking Center) plant whose operating time reaches about 12 years. Each column was considered as two equipment parts by dividing into top and bottom. Generic column failure frequencies were adjusted based on likelihood data. After determining release rate, release duration and release mass for each failure scenario, flammable/explosive and toxic consequences were assessed. Current risks for 32 equipment parts were evaluated and risk based prioritization were determined as a final result.