For a given soil-contaminated site, a level of soil contamination is characterized and decisions on risk may be made from the risk assessment. The study evaluated critical design factors for the determination of sample size in the sampling design plan and the assessment of soil contaminant- leaching to groundwater. Two variables, the minimum relative detectable difference (T) and coefficient of variation (CV) were evaluated for the sample size determination. The minimum number of samples can be appropriately determined by CV under a T value greater than or equal to 0.2. Soil-contaminant leaching to groundwater was evaluated by using the Soil Screening Level equation of U.S. Environmental Protection Agency and the Risk Based Screening Level equation of American Society for Testing and Materials, with the same input parameters. The groundwater concentrations estimated from soil contaminant concentrations were significantly affected by the Darcy velocity of groundwater and the organic content of soil.
Kim Jae-Won;Choi Young-Min;Kim Dae-Sung;Kim Kyo-Hun;Park Hyang-Woo
Proceedings of the KSR Conference
/
2005.11a
/
pp.482-487
/
2005
In the most current Turn-key bidding and Alternative design, is going to establish maintenance plan along with a economical assessment (VE/LCC assessment etc). Generally, establishment of maintenance plan is based on past experiences that are decided upon sensor position and amount with analytic or mechanical control section. But, it is more reasonable that maintenance plan based on level of significance for Probabilistic Risk, with presuming damage probability assessment of structural fracture scenarios. Therefore, in this study it is considered about the technique that an improved maintenance plan of railroad structures using PRA (Probabilistic Risk Assessment) on the basis of structural reliability theory. For this, in the paper, Preventive maintenance plan based on PRA is suggested with an application example of Pansong-Line (Line number 3) railway in Pusan works that actually executed Turn-key design.
Proceedings of the Korean Statistical Society Conference
/
2003.10a
/
pp.319-324
/
2003
본 논문에서는 matched-pair design에서의 두 처리간 동등성/ 비열등성 검정에 대해 고려하였다. 기존에 비율차이나 risk ratio관점에서 동등성/비열등성 검정을 시행한 것과는 달리, 본 논문에서는 odds ratio에 기초하여 두 가지 검정통계량을 유도하였다. (1) constrained maximum likelihood estimator(mle)를 이용한 fieller type 통계량 (2) 제약없이 구한 mle를 사용한 wald-type 통계량). 비율 차이나 risk ratio에 기초한 기존의 통계적 방법들(비율차이에 근거한 (3) score-type 통계량과 (4) wald-type 통계량, risk ratio에 기초한 (5) fieller-type 통계량과 (6) wald-type 통계량)과 본 논문에서 제시한 두가지 통계량의 성능을 비교하기 위해 모의실험을 시행하였다. 모의실험 결과, 본 논문에서 제안한 constrained mle를 사용한 fieller type 통계량은 empirical type I error 측면에서 매우 만족스러운 결과를 보이고 있으며, 특히 비대각 셀의 확률이 작아질 경우에도 안정적인 성능을 보여준다.
Park, Yongtae;Lee, Jaeik;Kwon, Donghyun;Lee, Changheon
Special Issue of the Society of Naval Architects of Korea
/
2013.12a
/
pp.90-93
/
2013
RAM study has been used for various range of industry such as chemical, electronics, defense industry. Recently, in the offshore & shipbuilding industry, demand of owners to analysis risk has been increased. RAM study is a quantitative pointer to risk based design and provides effective method for improvements. This article shows the result of RAM study for LNG fuel supply system. The result provides information to improve design. This study shows how result of risk assessment affects the design of LNG fuel supply system.
Proceedings of the Korean Institute of Building Construction Conference
/
2018.05a
/
pp.122-123
/
2018
Recently, CM at Risk delivery system(CM@R) that could solve the problems of Design Bid Build delivery(DBB) system has been emerging. In the CM@R delivery system, the contractor negotiates for a maximum guaranteed price(GMP) with the client at the design stage, and the contractor carries out the construction within the GMP. In CM @ R, the construction company with expertise in construction participates from the design stage to reflects the construction know-how in the design. On the other hand, the modification design frequently occurs due to the change of the construction cost when negotiating the GMP. In addition, uncertainties are inherent in the GMP calculation because the calculation is based on unfinished drawings and documents. This study proposes a probabilistic GMP estimation method applying MCS to the BIM - based cost prediction model, in order to extract the accurate quantity information when estimating the GMP and to cope with the change of the construction cost inherent in uncertainty.
This study examines the impact of perceived risks for smart shoes based on purchase intention by type of smart shoes as well as how they are mediated by fashion innovativeness and technology innovativeness. It also compares the differences between awareness, interest and perceived risk of smart shoes by gender and age. This study was conducted based on men and women in their 20s to 50s who provided 246 samples for data analysis using SPSS 25.0. The results show significant differences in the awareness, interests and perceived economic risk of smart shoes by gender and age. The perceived performance risk had a positive effect on the purchase intention of smart shoes for GPS. Perceived aesthetic-psychological risk had a negative effect on all types of smart shoes. Perceived economic risk had a negative effect on the purchase intention of smart shoes for entertainment; in comparison, perceived social risk had a positive effect on the purchase intention of smart shoes for GPS and entertainment. Fashion innovativeness and technology innovativeness also mediated the relationship between perceived economic risk as well as the purchase intention of smart shoes for healthcare, GPS and entertainment.
Background: This study analyzed the effect of applying the diagnosis-related group (DRG)-based payment system, which was implemented in July 2012 for hospitals and clinics nationwide, on the cesarean section rate. Methods: The subjects of the study were divided into new groups that participated in the payment system after July 2012 and maintenance groups that participated in the payment system before July 2012. As an analysis method, a difference-in-difference analysis, which is a quasi-experimental design, was used. The risk-adjusted cesarean section rate was used as a dependent variable. Results: Seven risk factors (malpresentation of fetus, eclampsia, multiple pregnancies, problems in the placenta, previous Cesarean section, cephalopelvic disproportion, problems in amniotic fluid) were included in the final risk-adjustment model, and found to have a statistically significant relationship with the cesarean section rate. Results showed that the risk-adjusted cesarean section rate increased significantly in new groups after the application of the DRG-based payment system. Conclusion: Study results provided policy implications for the reorganization of the DRG-based system should that reflects the demands of obstetricians, such as organizing a consultative body with obstetricians and establishing a reasonable fee.
National performance-based design methods and prescribed standards for various input data not defined as separated regulation, ASET and RSET fire and evacuation simulations on the data cited by different designers. This is also directly connected reliability problems for the evacuation simulation and performance-based fire. standardizing the various input to performance-based fire and evacuation simulations of a similar risk, regardless of the experience of designer or technical skills. The performance-based targets proper fire-fighting and emergency equipment installed reasonable initial investment cost to done ensure safety.
Korean Journal of Construction Engineering and Management
/
v.12
no.5
/
pp.146-154
/
2011
Korean contractors have been maintained sustainable growth since entering into overseas construction market for the first time in 1960' s. In 2010, Korean contractors ordered 761 billion (USD) from overseas markets. Especially, billion (USD) were earned by Korean contractors in overseas plant construction market which account for more than 80% of the total amount by Korean contractors. Nevertheless, many Korean contractors are suffering from lack of technological competitiveness and construction management skills in the design phase compared with global leading contractors. These conditions have directly effect on the success of projects in terms of cost, duration, and quality. So, this study focused on identifying the risk factors and developing risk priority method for the design phase of LNG plant projects whose market is expanding. Research procedures were conducted by the following three steps. First, total 57 risk factors were identified in design phase through extensive literature reviews and experts survey. Second, the authors developed risk priority method which are more suitable for design phase of LNG plant projects by using three criteria, Probability(P), Impact(I), and Coordination Index(CI). Finally, the suitability of risk priority method and practical applicability were verified through expert survey and interview. Consequently, if korean contractors use the suggested risk factors and priority method based on their own know-how and experiences, then more reasonable and rational risk management will be conducted in the design phase of LNG plant projects.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.64
no.4
/
pp.220-230
/
2015
Rolling stock RAMS is a field of engineering which integrates reliability, availability, maintainability and safety (RAMS) characteristics into an inherent product design property through rolling stock system engineering process. It is implemented to achieve operational objectives successfully, and recently the RAMS has become a rapidly growing engineering discipline because it has a great potential to ensure safety and improve cost effectiveness. However, the Korean rolling stock industry has not yet implemented RAMS management in the rolling stock engineering process, despite the issue having been addressed since the introduction of the KTX. Thus, this paper discusses the processes, methods and techniques for RAMS assessment in three parts. Firstly, it outlines a process of the overall RAMS performance assessment for achieving technical RAMS design criteria. Secondly, it discusses a process for assessing the operational RAM and allocating the RAM. This paper also proposes a model for assessing safety-based risk management, which includes five analytic techniques for identifying the causes and consequences of a system failure. Finally, a case example is provided for the risk assessment of the pneumatic braking device.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.