• Title/Summary/Keyword: Risk priorities

Search Result 122, Processing Time 0.023 seconds

The Priority of Environmental Problems in Korea (우리나라의 환경문제 우선순위 도출 - 환경전문가를 중심으로 -)

  • 신동천;임영욱;박종연;장은아;김진용;박성은;조성준
    • Environmental Analysis Health and Toxicology
    • /
    • v.14 no.4
    • /
    • pp.165-174
    • /
    • 1999
  • This study was conducted to analyze the priority of environmental problems in Korea by investigating the environmental professionals' perception. The delphi technique was applied to identify their risk perception towards some specific items related with pollution. A standardized questionnaire on environmental problems and their priorities was used to 74 subjects. In the questionnaire, the environmental problems were divided into the general ones,9 items, and the specific ones,30 items. Also, the perception was associated with two points of view which were the risk on general human health or ecosystem, and on the present situation in Korea. The priority of risk from general environmental problems on human health or ecosystem was analyzed in the order of 'water pollution', 'air pollution', 'soil contamination', 'waste', 'toxic chemical pollutants', 'food contamination', 'ocean contamination', 'odor pollution', and 'noise pollution'. The priority of risk on the present situation in Korea was analyzed in the order of 'water pollution','air pollution','waste','toxic chemical pollutants','food contamination','soil contamination','ocean contamination','odor pollution', and 'noise pollution'. And these priorities were significantly related with the characteristics of respondents such as sex, age, and major concerned area. However, for the first five priorities of risk from the specific environmental problems on human health or ecosystem, the environmental professionals agreed with 'automotive vehicle exhaust', 'domestic and industrial source pollutants to surface water', '$CO_2$nd g1oba1 warming effect','toxic air pollutant' and 'industrial source air pollution'. The priorities of risk on the present situation in Korea were similar to these results.

  • PDF

A case study for determination of seismic risk priorities in Van (Eastern Turkey)

  • Buyuksarac, Aydin;Isik, Ercan;Harirchian, Ehsan
    • Earthquakes and Structures
    • /
    • v.20 no.4
    • /
    • pp.445-455
    • /
    • 2021
  • Lake Van Basin, located in Eastern Turkey, is worth examining in terms of seismicity due to large-scale losses of property and life during the historical and instrumental period. The most important and largest province in this basin is Van. Recent indicators of the high seismicity risk in the province are damage occurring after devastating earthquakes in 2011 (Mw=7.2 and Mw=5.6) and lastly in 2020 Khoy (Mw=5.9). The seismic hazard analysis for Van and its districts in Eastern Turkey was performed in probabilistic manner. Analyses were made for thirteen different districts in Van. In this study, information is given about the tectonic setting and seismicity of Van. The probabilistic seismic hazard curves were obtained for a probability of exceedance of 2%, 10% and 50% in 50-year periods. The PGA values in the Van province vary from 0.24 g - 0.43 g for earthquakes with repetition period of 475 years. Risk priorities were determined for all districts. The highest risk was calculated for Çaldıran and the lowest risk was found for Gürpınar. Risk priorities for buildings in all districts were also determined via rapid seismic assessment for reinforced-concrete and masonry buildings in this study.

Human Health Risk based Priority Ranking for Hazardous Air Pollutants (대기중 유해 화학 물질의 인체 위해도 우선순위 선정 연구)

  • Park Hoa-sung;Kim Ye-shin;Lee Dong-soo;Shin Dong-chun
    • Environmental Analysis Health and Toxicology
    • /
    • v.19 no.1
    • /
    • pp.81-91
    • /
    • 2004
  • Although it is suggested that risk -based management plan is needed to manage air pollution effectively, we have no resources enough to evaluate all aspects of substances and set priorities. So we need to develop a logical and easy risk-based priority setting method. However, it if impossible that only one generic system that is consistent with all the use is developed. In this study, we proposed a human health risk based priority-setting method for hazardous air pollutants, and ranked priorities for this method. First of all, after investigating previous chemical ranking and scoring systems, we chose appropriate indicators and logics to goal of this study and made a chemical priority ranking method using these. As results, final scores in priority ranking method were derived for 25 substances, and ethylene oxide, acrylonitrile and vinyl chloride were included in high ranks. In addition, same substances were highly ranked when using default values like when using no default, but the scores of hydrofluoric acid and ryan and compounds were sensitive to default values. This study could be important that priorities were set including toxicity type and quality and local inherent exposure conditions and we can set area-specific management guidelines and survey plans as a screening tool.

Determination of Corrective Maintenance Priorities Using Joint Reliability Importance (결합 중요도를 이용한 사후보수 우선순위 결정)

  • Koo, Hoon Young;Kim, Young Bok;Hong, Jung Sik;Lie, Chang Hoon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.33 no.1
    • /
    • pp.61-69
    • /
    • 2007
  • In a large complex system, maintenance priorities for the failed components are important to maintain the sys-tern reliability at required level. Commonly used methods of determining maintenance priorities are based onranking the failed components by using reliability importance measures such as Birnbaum reliability importance,risk achievement worth and F-V importance, etc. In the preceding works, maintenance priorities for the failedcomponents are determined by using such existing measures, In this study, a new method of determining main-tenance priorities, which utilizes the joint reliability importance is proposed. By investigating the sign of thejoint reliability importance, maintenance priorities obtained by the existing methods are adjusted to yield new re-vised priorities. The revised maintenance priorities are shown to be more effective than the existing ones fromthe standpoint of the speed of system recovery, Effectiveness of the proposed method is illustrated by numericalexamples.

Determining Nursing Care Priorities among Women in the High Risk of Coronary Heart Disease (일 건강검진센터에 내원한 여성을 대상으로 심혈관질환 위험요인을 활용한 고위험군 간호의 우선순위 설정)

  • Youm, Soon Gyo;Han, Yong Hee
    • Journal of Korean Clinical Nursing Research
    • /
    • v.14 no.1
    • /
    • pp.125-137
    • /
    • 2008
  • Purpose: This study was designed as a epidemiologic study for determining priorities of nursing care in women with high risk groups of coronary heart disease(CHD) using risk factors. Method: Subjects were 1015 women who received health screenings at a hospital in Kyunggi, Korea, over one year period from January to December 2006. Results: The 37.9% of women had multiple risk factors for developing coronary heart disease. The most significant risk factors on CHD were the age older than 70 years (OR=11.45), the age between 60-69 (OR=4.65), the age between 50-59 (OR=3.20), having $HbA_1C$ over 7% (OR=2.38), high risk groups of L/H ratio (OR=1.98), and the waist to stature ratio (WSR) over 0.5 (OR=1.33). Conclusion: The findings suggest that women older than 50 years should be considered as an overt target population for CHD prevention, even in the absence of other risk factors. Also, $HbA_1C$ and WSR can be efficient indicators for CHD screening.

  • PDF

A GIS-Based Spatial Analysis for Enhancing Classification of the Vulnerable Geographical Region of Highly Pathogenic Avian Influenza Outbreak in Korea (GIS 공간분석 기술을 이용한 국내 고병원성 조류인플루엔자 발생 고위험지역 분류)

  • Pak, Son-Il;Jheong, Weon-Hwa;Lee, Kwang-Nyeong
    • Journal of Veterinary Clinics
    • /
    • v.36 no.1
    • /
    • pp.15-22
    • /
    • 2019
  • Highly pathogenic avian influenza (HPAI) is among the top infectious disease priorities in Korea and the leading cause of economic loss in relevant poultry industry. An understanding of the spatial epidemiology of HPAI outbreak is essential in assessing and managing the risk of the infection. Though previous studies have reported the majority of outbreaks occurred clustered in what are preferred to as densely populated poultry regions, especially in southwest coast of Korea, little is known about the spatial distribution of risk areas vulnerable to HPAI occurrence based on geographic information system (GIS). The main aim of the present study was to develop a GIS-based risk index model for defining potential high-risk areas of HPAI outbreaks and to explore spatial distribution in relative risk index for each 252 Si-Gun-Gu (administrative unit) in Korea. The risk index was derived incorporating seven GIS database associated with risk factors of HPAI in a standardized five-score scale. Scale 1 and 5 for each database represent the lowest and the highest risk of HPAI respectively. Our model showed that Jeollabuk-do, Chungcheongnam-do, Jeollanam-do and Chungcheongbuk-do regions will have the highest relative risk from HPAI. Areas with risk index value over 4.0 were Naju, Jeongeup, Anseong, Cheonan, Kochang, Iksan, Kyeongju and Kimje, indicating that Korea is at risk of HPAI introduction. Management and control of HPAI becomes difficult once the virus are established in domestic poultry populations; therefore, early detection and development of nationwide monitoring system through targeted surveillance of high-risk spots are priorities for preventing the future outbreaks.

Priority Analysis of Project Stage-wise Risk Factors : Focusing on New Product Development Projects in ICT Industry (프로젝트 단계별 리스크 요인들의 우선순위 분석 : ICT(정보통신기술)산업 분야의 신제품 개발 프로젝트를 중심으로)

  • Jang, Heeseok;Choi, Sungyong;Lee, Minho
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.3
    • /
    • pp.72-82
    • /
    • 2018
  • In this paper, we identify risk factors that are likely to occur during the lifecycle of a new product development (NPD) project from the literatures, and identify the three objectives or three constraints that will ultimately be achieved for project success in the ICT industry : performance (scope/quality), schedule (time), and cost. Firstly, we interviewed the project experts to classify the risk factors according that the final project objectives are changeable based on scope/quality, time and cost budget constraints. Secondly, the survey for pairwise comparisons between the risk factors was asked to the project managers and members who had ever actually participated in the NPD projects of ICT industry to determine the priority ranks on relative importance using AHP (Analytic Hierarchy Process). The risk factors negatively affecting the goals of projects were analyzed by using the AHP respectively in four project stages during the life cycle of the project. The comparison of risk factors within each stage is a different approach unlike the literatures which have covered project's overall risk assessment. There is an advantage that risk management can be effectively performed with priorities according to each stage from the start to the end of the project. In other words, it is necessary to identify what risk factors will occur in each stage, and to have ideas at each stage with the priorities so that they can be mitigated and eliminated before actual occurrence. As a result, risks on scope & quality changes were found to be the most important considerations for initiative stage of NPD projects in the ICT industry, whereas in the final stage, risks on schedule (time) changes were the most important priorities. Among the ICT industry product categories, 'communication and broadcasting devices' and 'IT and communication based devices' generally have a high priority in terms of risks on scope & quality changes when initiating the project. At the closing stage of the project, however, considering that schedule (time) changeable risk is getting higher, these products tend to target at B2B market rather than B2C because the new products must be delivered and launched in time as customer firm required.

Risk Management for R&D Projects in the Military Aircraft Systems (군용항공기 연구개발 사업의 리스크 관리)

  • Kim, Sung Hun;Lee, Hyun Cheol
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.44 no.4
    • /
    • pp.76-84
    • /
    • 2021
  • Military aircraft R&D projects require large-scale investment in cost and time, and involve a complex coordination process in decision-making. The R&D project manager should determine the development management priorities as accurately as possible and focus on R&D capabilities, thereby reducing the risks of the aircraft R&D project. To this end, this study aims to reduce R&D risk by prioritizing cost, schedule, and performance, which are basic management factors used in R&D project management in defense project management regulations. Analytic Hierarchy Process (AHP) is applied using a questionnaire for managers in charge of aviation R&D under the Defense Acquisition Program Administration. As a primary result, the importance of the factors that the aircraft R&D project manager should consider was derived in the order of performance, cost, and schedule, and the priorities of performance and cost in the lower layer were also identified. In addition, in order to provide practical risk management measures to aircraft R&D project managers, the results of analyzing 28 cases of US National Transportation Safety Board accidents were compared and analyzed with the AHP analysis results, and management measures suitable for the situation were specified.

Risk-based Priority Ranking for Air Pollution Problems in Seoul (서울 지역에서 인체 위해도에 입각한 대기오염물질의 관리 우선 순위 선정에 관한 연구)

  • 김예신;박화성;이용진;임영욱;신동천
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.19 no.2
    • /
    • pp.205-216
    • /
    • 2003
  • We have gathered exposure data on ambient air quality level and investigated dose-response slope factors of air pollutants such as fine particle, HAPs (metals, VOCs, PAHs) and dioxins in Seoul. Theoretical mortality incidences were estimated from exposure to these pollutants. From the results, priorities were ranked in the order fine particle, metals, VOCs, dioxins and PAHs by ordinal scale, and the uncertainties relative to those risk estimates were described.

Risk analysis using PROMETHEE method In Building Construction MANAGEMENT

  • Jang-Young Lee;You-Sang Yoon;Myung-Houn Jang;Sang-Wook Suh
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1364-1369
    • /
    • 2009
  • The building construction projects include a variety of risk factors due to uncertainties. To succeed in the projects, it is important how risks are managed. Risk management is composed of identification, analysis and response. Especially, the risk analysis is important to objectively calculate significance of risk factors. This paper evaluates a method to find priorities of risks using the AHP(Analytic Hierarchy Process). The method has some defects; (1) the consistency becomes weak as the number of pair-wise compared risks is large, and (2) the input and output procedures are complex when risks are added to or removed from a risk database. Thus the paper adopt the PROMETHEE(Preference Ranking Organization METHod Enrichment Evaluations) analysis process which is able to overcome the limitation of the AHP restricted to 9 risk factors. The PROMETHEE method makes the procedure of risk analysis simple, when the risk factors pull out and put in the risk database. The purpose of this study is to prove the possibility of the PROMETHEE analysis process by being compared with AHP.

  • PDF