• 제목/요약/키워드: Risk management structure

검색결과 373건 처리시간 0.025초

모바일 간편 결제 서비스 이용 의도에 관한 연구 : 기술 수용 모델을 중심으로 (A Study on the Intention of the Use of Mobile Payment Services: Application of the Technology Acceptance Model)

  • 이수연;박조원
    • 경영과학
    • /
    • 제33권2호
    • /
    • pp.65-74
    • /
    • 2016
  • The present study applies the TAM (Technology Acceptance Model) to investigate the factors that affect the intention to use the mobile payment services. For this purpose five potential variables (perceived usefulness, perceived convenience, ubiquity, innovativeness, and safety risk) that are expected to affect the intention to use the mobile payment services were selected. An online survey was administered, and 339 questionnaires were analyzed. Structure Equation Model (SEM) Analysis revealed that TAM variables (perceived usefulness and perceived convenience) partially influenced the attitude. The perceived usefulness predicted the attitude while perceived convenience did not predict the attitude toward the mobile payment service. Personal characteristics variable (innovativeness) and mobile nature variables (ubiquity, and security risk) were identified as the predictors of the attitude toward the mobile payment service. While innovativeness and ubiquity affected the attitude positively, security risk affected the attitude negatively. Finally, the analysis substantiated the influence of attitude toward the mobile payment services on the intention to use the services. On the basis of findings, managerial implications and suggestions for further studies were discussed.

우주발사체 시스템 개발에 있어서의 SE관리기법 적용 (Application of SE Management Techniques for space Launch System Development)

  • 조미옥;조병규;오범석;박정주;조광래
    • 시스템엔지니어링워크숍
    • /
    • 통권4호
    • /
    • pp.90-94
    • /
    • 2004
  • System engineering(SE) management techniques applied for space launch system development are introduced to assess the current status and address the effwctiveness of these techniques. Management plans and guides are prepared for the work breakdown structure , data, comfiguration, interface control, Quality assurance, procurement, reliability, risk and verification/validation . Further improvement is required for the system engineering management plan(SEMP) to merge the international cooperation into current engineering managment system.

  • PDF

층고절감형 거더를 이용한 영구 스트러트 공법 (Strut as a Permanent System using Composite Beams)

  • 홍원기;박선치;김진민;이호찬
    • KIEAE Journal
    • /
    • 제8권1호
    • /
    • pp.87-92
    • /
    • 2008
  • Sheathing work used for excavation in a crowded downtown is generally a temporary strut method using H-piles and sheathing wall includes lagging, CIP, SCW or slurry wall. A temporary strut serving the support for sheathing wall acts to resist the earth pressure, but it shall be removed when installing the underground structure members. A traditional temporary strut might cause the stress imbalance of the sheathing wall when it is demolished, resulting in time extension and the risk of collapse. A traditional temporary strut method thus needs to be improved for schedule and cost reduction, risk mitigation and for preparation for potential civic complaint. A permanent strut method doesn't require installing and demolishing the temporary structure that will lead to reducing the time and cost and the structural risk during the demolition process. And given the girder, the part of the underground structure, serves the role of strut, it can secure the wider interval compared to the traditional method, which enables to secure the wider space for the convenience of excavation as well as enhance the constructability and efficient site management. The thesis was intended to study the composite girder designed to use the strut as permanent structure so as to reduce the excavation and floor height.

민관합동형 PF사업의 단계별 리스크 분류 및 위험도분석 (Risk Analysis and Classification of Public-Private Partenership in Project Financing Process)

  • 박혜성;김선국
    • 한국건설관리학회논문집
    • /
    • 제12권5호
    • /
    • pp.117-126
    • /
    • 2011
  • 공공-민간 합동개발 형태의 사업방식으로 시행하는 민관합동형 PF(Project Financing)사업은 2001년 도입이후 급격한 양적 증가를 가져왔으나 2008년 글로벌 금융위기 이후 심각한 침체국면을 맞이하게 되었다. 본 연구에서는 공공시설물 PF 사업의 실 사례를 바탕으로 리스크요인을 도출하고 프로젝트 진행 단계별로 리스크를 분류하여 분석하는 것이며, 단계별 리스크 요인의 위험도 및 중요도를 해당분야 실무자의 설문조사를 토대로 측정하고 리스크인자의 위험도를 산출하였다. 본 연구결과는 사업추진시 각 단계별 리스크인자를 인지하고, 리스크요인의 위험도에 따른 대응전략 수립 및 리스크 관리에 활용 되기를 기대한다.

세계(世界) Critical materials 관리(管理)를 위한 전략(戰略) (Strategy of Critical Materials Management in the World)

  • 김유정
    • 자원리싸이클링
    • /
    • 제22권5호
    • /
    • pp.3-12
    • /
    • 2013
  • 수요확대가 전망되고 공급구조가 경직된 금속자원은 각국의 산업구조 및 자원확보 역량에 따라 리스크 관리가 필요하다. 이를 위해 금속자원의 위기성 평가가 다양화되고 있는데, 주로 희토류 등 희유금속이 위기물질 혹은 중요물질(Critical materials, Critical metal, Critical raw materials)로 선정되고 있다. 본 연구에서는 기술변화 및 수급불균형 등을 고려한 위기물질 선정체제 및 관리현황에 대해 살펴보고자 한다. 유럽, 미국 등은 신재생에너지 보급 확대에 따른 원재료 리스크를 평가하고 있으며, 일본은 자국 내 성장동력산업을 중심으로 핵심 원재료를 파악하고 있다. 영국은 자원채굴에 따른 환경부하를 고려하여 광종별 위기성을 평가하였다. 그리고 이러한 위기물질들의 가격시그널의 미약성, 비탄력적 공급구조, 기술변화에 민감한 수요변동성 등의 특징을 분석하였다.

Cyber risk measurement via loss distribution approach and GARCH model

  • Sanghee Kim;Seongjoo Song
    • Communications for Statistical Applications and Methods
    • /
    • 제30권1호
    • /
    • pp.75-94
    • /
    • 2023
  • The growing trend of cyber risk has put forward the importance of cyber risk management. Cyber risk is defined as an accidental or intentional risk related to information and technology assets. Although cyber risk is a subset of operational risk, it is reported to be handled differently from operational risk due to its different features of the loss distribution. In this study, we aim to detect the characteristics of cyber loss and find a suitable model by measuring value at risk (VaR). We use the loss distribution approach (LDA) and the time series model to describe cyber losses of financial and non-financial business sectors, provided in SAS® OpRisk Global Data. Peaks over threshold (POT) method is also incorporated to improve the risk measurement. For the financial sector, the LDA and GARCH model with POT perform better than those without POT, respectively. The same result is obtained for the non-financial sector, although the differences are not significant. We also build a two-dimensional model reflecting the dependence structure between financial and non-financial sectors through a bivariate copula and check the model adequacy through VaR.

소규모 건축현장 재해감소를 위한 위험성평가 방안 (Risk Assessment for Disaster Reduction in Small-Scale Construction Sites)

  • 최현준
    • 한국재난정보학회 논문집
    • /
    • 제18권2호
    • /
    • pp.395-404
    • /
    • 2022
  • 연구목적:소규모 건축현장은 체계적인 안전관리활동이 미흡하고 건설현장의 특성상 외부환경의 요인으로 생산구조가 복합적이고 건설장비의 위험성 등으로 인해 산업재해의 가능성이 매우 높은 실정이다. 소규모 건설현장의 재해예방을 위한 위험요인을 도출하고 재해를 줄일 수 있는 실무적인 위험성평가의 기법 중 체크리스트 방법을 제안하고자 한다. 연구방법: 문헌조사와 재해사례를 분석하여 위험요인을 도출하여 위험요인 항목을 중심으로 소규모 건설현장에 적합하고 효율적인 위험성평가의 체크리스트를 위한 세부작업을 분류하였다. 연구결과:위험요인을 6개의 대분류로 구분하고 실질적인 작업공종을 중심으로 29개의 세부공종을 분류 하였으며 이에 따른 세부작업을 80개로 구분하였다. 결론:소규모 건축현장에 적합한 위험요인을 분류체계에 따라 정리함으로써 건설현장에 부족한 전문성을 보완할 수 있고 보다 쉽게 위험요인을 도출하여 안전대책수립을 통한 재해감소를 기대할 수 있을 것으로 보인다.

Family Ownership and Dividend Policy: Evidence from India

  • RAJVERMA, Abhinav;MISRA, Arun Kumar;KUMAR, Gaurav
    • The Journal of Asian Finance, Economics and Business
    • /
    • 제9권9호
    • /
    • pp.61-73
    • /
    • 2022
  • The article examines the ownership structure and dividend payout behavior of India-listed firms using a panel regression approach. It focuses on family ownership and examines why dividend payouts of family firms differ from non-family firms. The study finds that family firms dominate and have concentrated ownership using data from the NSE-listed regular dividend-paying firms. Although family ownership concentration is high among Indian firms, these firms are not concerned about distributing cash as dividends. Instead, these firms focus on retaining and passing on control from one generation to the next. The evidence shows that family firms pay low dividends and have higher leverage than non-family counterparts. The results support the entrenchment of minority shareholders and the proposition that a high payout signals a reduction in the information asymmetry and level of risk. The study further illustrates that cash dividends tend to reduce the level of risk perceived; however, (cash dividend) leads to the deterioration firm's liquidity and aid in the shrinking of cash among emerging market firms. The originality of the paper lies in factoring ownership concentration while explaining the dividend behaviour from an emerging markets perspective, characterized by high private benefits and weak protection for external minority shareholders.

호주 Listed Property Trusts의 성과와 자산관리 특성 분석: 우리나라 부동산간접투자에의 시사점 (Performance and Asset Management System of Listed Property Trusts in Australia: Implications for Korean Real Estate Indirect Investment Market)

  • 박원석
    • 한국경제지리학회지
    • /
    • 제10권3호
    • /
    • pp.245-262
    • /
    • 2007
  • 본 연구는 호주의 LPT(Listed Property Trusts)의 성과 분석을 통해 펀드형 부동산 간접투자상품으로서 LPT의 성과와 특성을 분석하고, LPT 성과에 영향을 미치는 LPT의 자산관리 특성을 분석하여, 우리나라 부동산 간접투자제도의 발전을 위한 시사점을 도출하는 것을 목적으로 한다. 연구결과를 요약하면 다음과 같다. LPT는 1971년 최초로 설립된 이후 빠른 성장을 통해 호주의 대표적인 부동산간접투자제도의 지위를 차지하고 있다. LPT 성과 특성을 보면, LPT는 명목수익률 및 위험조정수익률의 관점에서 여타 금융상품에 비해 우월한 성과를 보이고 있으며, LPT를 영입함으로 복합자산 포트폴리오 다변화 효과를 누릴 수 있음을 확인하였다. 또한, LPT는 자산관리 방안으로 결합주식 구조를 활용하고 있는데, 결합주식 구조를 활용하는 LPT가 비결합 LPT보다 우수한 성과를 보이고 있으며, 결합주식 LPT의 포트폴리오 다변화 효과도 더 뛰어나, 결합주식 구조는 LPT가 고도 성장을 하는데 중요한 요인으로 작용하고 있음을 확인하였다. 마지막으로, 이러한 연구결과를 통해 LPT의 결합주식 구조를 우리나라 부동산투자회사 제도에 활용하는 방안, 개발사업의 활성화를 위한 LPT의 사례를 적용하는 방안 등을 모색하였다.

  • PDF

초고층 건설공사 시공단계 리스크 요인 도출 및 분석 (Extraction and Analysis of Construction Phase Risk Factors in High-rise Construction Project)

  • 김수용;김성현;양진국
    • 한국건설관리학회논문집
    • /
    • 제17권2호
    • /
    • pp.90-98
    • /
    • 2016
  • 고층 건설 프로젝트는 다양한 위험 요인이 있다. 주요 위험 요인은 시간 지연과 비용의 증가 등의 부정적인 결과이다. 따라서, 본 연구는 PROMETHEE 기법을 사용하여 초고층 건설공사 시공 단계에서의 위험 요인을 분석하였다. 이를 위해, 본 연구는 전문가 표적집단면접법(FGI)을 통해 위험 인자를 확인 하였다. 그리고 PROMETHEE는 초고층 건설공사 위험 분석을 위한 설정 평가기준으로 사용 하였다. 다음으로, 평가지표 계산의 기준은 PDRI에서 정의 레벨을 사용하여 구성하였다. 선호지수 및 평가 지표는 설문을 통해 규명되었다. 이러한 과정을 통해, PROMETHEE 기법을 이용하여 본 연구는 초고층 건설공사 시공 리스크의 중요도를 산정하였다. 그 결과, 높은 수준의 위험 요인은 다음과 같이 나타났다. 이것은 '재료 리프팅 운영 계획', '아웃리거 벨트 트러스 건설', '고층 건물의 기초 작업 계획'과 '고층 건물의 구조 개념을 고려'이다.