• Title/Summary/Keyword: Risk Potential

Search Result 2,999, Processing Time 0.029 seconds

Suggestion of Risk Assessment Methodology for Decommissioning of Nuclear Power Plant (원자력발전소 해체 위험도 평가 방법론 개발)

  • Park, ByeongIk;Kim, JuYoul;Kim, Chang-Lak
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.17 no.1
    • /
    • pp.95-106
    • /
    • 2019
  • The decommissioning of nuclear power plants should be prepared by quantitative and qualitative risk assessment. Radiological and non-radiological hazards arising during decommissioning activities must be assessed to ensure the safety of decommissioning workers and the public. Decommissioning experiences by U.S. operators have mainly focused on deterministic risk assessment, which is standardized by the U.S. Nuclear Regulatory commission (NRC) and focuses only on the consequences of risk. However, the International Atomic Energy Agency (IAEA) has suggested an alternative to the deterministic approach, called the risk matrix technique. The risk matrix technique considers both the consequence and likelihood of risk. In this study, decommissioning stages, processes, and activities are organized under a work breakdown structure. Potential accidents in the decommissioning process of NPPs are analyzed using the composite risk matrix to assess both radiological and non-radiological hazards. The levels of risk for all potential accidents considered by U.S. NPP operators who have performed decommissioning were estimated based on their consequences and likelihood of events.

Development of A Computerized Risk Management System for International EPCS Projects

  • Yoo, Wi Sung;Kim, Woo-young;Sung, Yookyung
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.614-615
    • /
    • 2015
  • In these days, global construction market is speedily increasing and domestic construction companies have a chance of new contracts. In the meantime, international projects have been increasingly forced to cope with potential risks, which seriously impacted achieving the targeted time and cost. In this study, we introduce a computerized risk management system for international EPCS projects, which is constructed on the needs of practitioners and decision makers as an aid to proactively control the potential risks and to monitor continuously their status and variation. The system is called the Project Risk Management System (PRiMS) is useful for furnishing project managers with warning signals as a project is progressing and helpful for producing the total risk score and tracking risk variation.

  • PDF

Evaluation on Electric Shock Risk due to the Electric Potential Distribution in Bathtub (욕조에서의 전위분포 해석을 통한 전격재해 위험성 평가)

  • Kim, Chong-Min;Kim, Han-Sang;Kim, Sung-Chul;Kim, Doo-Hyun
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.1 s.79
    • /
    • pp.40-46
    • /
    • 2007
  • It is evaluated that electric shock risk in bath so that we made and designed a bathtub which is the same size in real public bath. And then, we did an experiment, provided of electric leakage in various conditions, so we measured how to form an electric potential and knew the electric potential is formed variously under exposed conductor in bath. Also, we made certain that electric shock risk is down if we insert an insulated pipe in bathtub pipe which is prevent from being formed the electric field sharply. The results show that the increased shock risk and safe distance are estimated by the bathtub of limited width and depth, and the voltage simulated on the basis of Flux 3D concept is compared with the measured value.

Electric Shock Risk Assessment of the Human Body and Potential Distribution Analysis by FLUX3D in a Public Bathtub (공중욕조에서의 FLUX3D에 의한 전위분포 해석 및 인체의 전격위험성 평가)

  • Kim, Doo-Hyun;Kim, Sung-Chul;Lee, Jong-Ho;Kim, Han-Sang;Kim, Chong-Min
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.2 s.80
    • /
    • pp.41-46
    • /
    • 2007
  • This paper considers the electrical shock risk of the human body due to underwater leakage current in such places of public baths. Many submerged electric facilities in a public bath may create a severe electric shock hazard for the human body, since wet body in an accidentally energized bathtub can result in low electrical resistance through the human body for leakage or fault currents. Therefore a major consideration, in the context of electrical safety underwater, is the shock risk to the bather as a result of electric current flowing through the water in bathtub. To assess the electric shock risk and to analyze the potential distribution in a bathtub, 2 different situation cases are set up, then experimental and simulation methods are adopted. The validity of 2 cases of simulation and experiment data in a bathtub for electric distribution underwater are compared and analyzed. Also electric shock risk assessment underwater in a real public bathtub by simulation program package, Flux 3D, was conducted herein, and the results are presented and discussed.

The Analysis of the Internet Use Behavior Among Adolescents (서울시 일부 청소년의 인터넷 중독수준 실태)

  • Jeong, In-Sun;Moon, In-Ok
    • The Journal of Korean Society for School & Community Health Education
    • /
    • v.5
    • /
    • pp.11-23
    • /
    • 2004
  • The purpose of this study was to analyze the internet usage patterns among adolescents and to provide basic data for the development of internet addiction prevention program. The subjects of this study were 1169 students in middle and high school students in Seoul, Korea. Self-administered questionnaires were employed and data were analysed by SPSS 12.0. Major conclusions were as follows: 1. Most of the students were found to be the normal internet users. On the other hand, potential risk group was 8.2% and high risk group was 4.7%. Every students have had an experience of inter use. The 90.6% of the students' households had internet links. The percentage of students who were using internet more than 3 hours a day was 25.7%, and The most popular type of website was entertainment. 2. Male students showed greater percentages of potential risk and high risk group than female students. The students having parents in divorce, remarriage and separation were more likely to be in potential risk group than those having normal parents. The staying alone in home after school and small sleeping time were positively related to high level of internet addiction. 3. The characteristics of the students in potential risk and high risk group were longer duration of the internet use, internet use through the whole week, frequent internet use late at night, frequent use of pornographic site, main purpose of internet use for entertainment and shortage of rest during internet use. This study results had an limitation of generalizing to entire Korean adolescents because the sample of this study was middle and high school students living in Seoul. Future study was needed for the analysis of internet use behavior of the entire Korean adolescents, and for the identification of the accurate predictors for adolescents' internet addiction.

  • PDF

Development of Rock Slope Risk Rating System for the Determination of the Priority of Investment (도로절개면 투자우선순위 결정기법 개발)

  • 구호본;박혁진;민기복;정의진;김춘식;박성욱
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.411-418
    • /
    • 2000
  • With the limited amount of budget and time, it is required to determine the priority of investment when there are a large number of hazardous slopes. In this paper, the Rock Slope Risk Rating System is developed based on the combination of the hazard of failure and the damage potential. By applying the proposed rating system to 253 rock slopes in Korean National Highway, it was possible to determine the priority of investment on road cut slopes.

  • PDF

Risk Assessment for Railway Related Accidents in Korea (한국철도의 위험도 평가방안에 관한 연구)

  • 오주택;최은수
    • Journal of the Korean Society for Railway
    • /
    • v.7 no.2
    • /
    • pp.99-106
    • /
    • 2004
  • This paper presents the procedures and the results conducted by the proposed one for the risk assessment based on the accident statistics in the Korean railway. Approximately 1200 accident data were used for this study, and risk models were developed to describe the potential hazards. A risk assessment was conducted using the potential problem analysis technique qualitatively. Additionally, this study performed a regional risk assessment. The results of this study showed that the risks for collisions between trains and derailment are relatively low. However, grade crossing and public accident and accidents of workers on tracks take high risks. A large number of accidents is concentrated on the three regions such as Suwon, Chunan, and Chungrangri.

Chlid Abuse in High-risk Group (고 위험 집단의 아동학대에 관한 연구 - 생활보호 대상자를 대상으로 -)

  • 안혜영;김신정;고주애
    • Journal of Korean Academy of Nursing
    • /
    • v.32 no.6
    • /
    • pp.775-783
    • /
    • 2002
  • The purpose of this study was to provide basic data on preventive child abuse program development. Method: Data were collected on 105 high-risk families of child abuse intervention was obtained from their main child rearer who raised the child under 18 years, olds during 10 months period from May, 2000 to March 2001. Result: The results were as follows : 1. Child abuse occurred in the subject's home, in the case of mild child abuse, 'throwing an object at the child' had the highest percentage 39.1%, in severe child abuse, 'rod, stick, belt, broom beating or using a variety of objects such as' had the highest percentage 49.5%, and in very severe child abuse, 'hospitalized by belting' had the highest percentage 3.8% 2. The degree of child abuse potential showed high risk child abuse score with a mean of 213.3. The degree of beliefs in corporal punishment showed that subjects perceived corporal punishment of children positively with a mean of 32.2,. 3. With respect to the child abuse potential, there were significant correlations with the subjects' age (r=.294, p=.002), education level (r=-.442, p=.000), and family income (r=-.355, p=.000). Conclusion: From this study not only child abuse occurrence but also child abuse potential were severely increased in poor livelihood families. Therefore to the high risk group, individual preventive approach must be applied.

Public and Experts Perception about Nanotechnology Hazards in Korea (대한민국에서의 나노물질 위해성에 관한 일반인/전문가 인식 설문조사)

  • Lee, Jeong-Jin;Kim, Young-Hun;Bae, Eun-Joo;Lee, Su-Seung;Kwak, Byoung-Kyu;Choi, Kyung-Hee;Yi, Jong-Heop
    • Environmental Analysis Health and Toxicology
    • /
    • v.23 no.4
    • /
    • pp.247-256
    • /
    • 2008
  • Public perceptions of nanotechnology and its potential risk can be an important measure for the sustainable advances of the technology. We conducted a survey for public (N =599) and experts (N = 165). They answered the same questions and results were analyzed. 74% of the public have not heard about the potential risk of nanotechnology and 77% expected that nanotechnology/materials are not harmful to the human and nature. 74% of experts realized the potential hazards by nanomaterials. The results represented that large perception gab between public and experts has existed in Korea. Interestingly, Korean public thought that nanotechnology is more profitable and less risky than that of American. We suggest that 'now is the best time to give appropriate information on the potential risk of nanotechnology to Korean public without preconception or exaggeration.'

Risk analysis of offshore terminals in the Caspian Sea

  • Mokhtari, Kambiz;Amanee, Jamshid
    • Ocean Systems Engineering
    • /
    • v.9 no.3
    • /
    • pp.261-285
    • /
    • 2019
  • Nowadays in offshore industry there are emerging hazards with vague property such as act of terrorism, act of war, unforeseen natural disasters such as tsunami, etc. Therefore industry professionals such as offshore energy insurers, safety engineers and risk managers in order to determine the failure rates and frequencies for the potential hazards where there is no data available, they need to use an appropriate method to overcome this difficulty. Furthermore in conventional risk based analysis models such as when using a fault tree analysis, hazards with vague properties are normally waived and ignored. In other word in previous situations only a traditional probability based fault tree analysis could be implemented. To overcome this shortcoming fuzzy set theory is applied to fault tree analysis to combine the known and unknown data in which the pre-combined result will be determined under a fuzzy environment. This has been fulfilled by integration of a generic bow-tie based risk analysis model into the risk assessment phase of the Risk Management (RM) cycles as a backbone of the phase. For this reason Fault Tree Analysis (FTA) and Event Tree Analysis (ETA) are used to analyse one of the significant risk factors associated in offshore terminals. This process will eventually help the insurers and risk managers in marine and offshore industries to investigate the potential hazards more in detail if there is vagueness. For this purpose a case study of offshore terminal while coinciding with the nature of the Caspian Sea was decided to be examined.