• Title/Summary/Keyword: Risk Identification

Search Result 824, Processing Time 0.024 seconds

A Study on the Health Risk Assessment of Volatile Organic Compounds in a Petrochemical Complex (석유화학단지의 휘발성 유기화합물로 인한 인체 위해도 평가에 관한 연구)

  • 이진홍;김윤신;류영태;유인석
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.13 no.4
    • /
    • pp.257-267
    • /
    • 1997
  • This study focuses on the health risk assessment of airborne volatile organic compounds (VOCs) in a petrochemical complex, with several emphases on a risk assessment method. The first emphasis is on the importance of hazard identification to determine the likely carcinogenic potential of a VOC. Without considering this type of information, a direct comparison of the carcinogenic risks of two pollutants is meaningless. Therefore, wer suggest that this type of information be prepared and be listed with the estimate of cancer risk in parallel. The second emphasis is on the selection of a better dose-response model to estimate unit risk or cancer potency factor of a carcinogenic VOC. Finally, probilistic risk assessment method is discussed and recommended to use within a comparison of conventional point-estimate method. A health risk assessment has also been carried out. For non-carcinogenic risk, even the highest hazard index for carbon tetrachloride is estimated to be less than 1 with the other VOCs less than 0.03. However, the lifetime cancer risk from the inhalation of airborne VOCs is estimated to be about $2.6 \times 10^{-4}$ which is higher than the risk standard of $10^{-6}$ or even $10^{-5}$. Therefore, the investigation into domestic petrochemical complexes should be strengthened to obtain more fine long-term airborne VOC data.

  • PDF

Isolation and Characterization of Bacillus sp. Producing Broad-Spectrum Antibiotics Against Human and Plant Pathogenic Fungi

  • Chen, Na;Jin, Min;Qu, Hong-Mei;Chen, Zhi-Qiang;Chen, Zhao-Li;Qiu, Zhi-Gang;Wang, Xin-Wei;Li, Jun-Wen
    • Journal of Microbiology and Biotechnology
    • /
    • v.22 no.2
    • /
    • pp.256-263
    • /
    • 2012
  • A strain of bacterium producing antifungal antibiotic was isolated and identification of the strain was attempted. We could identify the bacterium as being a Bacillus sp., based on morphological observation, physiological characteristics, and 16S rDNA sequence analysis, thus leading us to designate the strain as Bacillus sp. AH-E-1. The strain showed potent antibiotic activity against phytopathogenic and human pathogenic fungi by inducing mycelial distortion and swelling and inhibiting spore germination. The antibiotic metabolite produced by the strain demonstrated excellent thermal and pH (2-11) stability, but was labile to autoclaving. From these results, we could find a broader antifungal activity of Bacillus genus. Isolation and characterization of the active agent produced by the strain are under progress.

An Effective Project risk Management Based on Systems Engineering (시스템엔지니어링에 기반한 효과적인 리스크 관리)

  • Kang, Top;Kim, Sung-Cheol;Oh, Jung-Taek
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.7 no.1
    • /
    • pp.43-51
    • /
    • 2011
  • SE generally defines approaching ways of conducting identification, verification and integration of an optimized product and process solution to meet customer's needs by leveraging organizational competency in engineering and management. To successfully develop a new product under mass production contract, it is important to efficiently carry out the program by ensuring that three major competencies are secured; core technology, system integration, and program management. For successful implementation of tasks in the three areas, systematic execution is called for, which requires identifying risk factors in advance. In particular, comprehensive risk management role and responsibility is required for program management. Success of a development program is determined by complex elements of human resources, organization culture, and overall competency of an organization in technology and program management, including capability of the program manager. In this paper, a risk management solution is suggested to lead a program to success with a more efficient way through actual risk management by the concept of SE around the above three areas.

Economic FX Rate Exposure Management and Invoicing Currency Determination (경제적(經濟的) 환율노출관리(換率露出管理)와 송장통화결정(送狀通貨決定))

  • Moon, Chang-Kuen;Yim, Chun-Ho
    • International Commerce and Information Review
    • /
    • v.9 no.4
    • /
    • pp.107-125
    • /
    • 2007
  • With the rapidly increasing of Korean enterprises, the importance of foreign exchange(FX) risk management for the future operation generated from FDI contract is becoming the critical problem of international business. This type of FX risk, called as "economic exposure risk", requires us of the unique risk management principles and techniques. In this paper, we identify the properties of economic exchange rate exposure, analyze the identification and measurement processes of risk sources and strength, and perform the estimation of the main determinants and its profile effects of the invoicing currency for the efficient management of economic FX exposure.

  • PDF

Study On the Design of Risk Management Web-Monitoring System using AANN (AANN을 이용한 웹-모니터링 시스템 설계에 관한 연구)

  • 김동회;이영삼;김성호
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.10 no.6
    • /
    • pp.545-550
    • /
    • 2004
  • Recent natural disasters like flooding and slope collapse have shown the need for natural risk management system, as they endanger directly public health and cause severe damages on the national economy. In order to improve the efficiency of risk management systems, this management system based on AANN(Auto-Associative Neural Network)is proposed in this paper. AANN can be effectively used for identification of abnormal data and data compression. The proposed AANN-based risk management system collects and stores measurement data from sensors and transmits them to remote server for web-monitoring. Generally, it is desirable to transmit the compressed data instead of raw data in normal state. However, if dangerous situation happens, rapid tramission of measurement data should be required. These requirements are easily satisfied by using AANN. In order to verify the feasibilities of the proposed system, The AANN-based risk management system is applied to slope collapse monitoring system.

A Study on the Risk Measurement of Construction Method for Fie1d Work (건축공사를 위한 공법별 리스크 측정에 관한 연구)

  • Yoo In-Geun;Choi Sang-Chun;Cho Taek-Hee;Koo Bron-Woo;Yoon Yer-Wan
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.1121-1129
    • /
    • 2005
  • The purpose of this study. was to Identification the Risk of construction method to protect and reduce the risk of construction period. The inspection list usually has the difference of importance because this list is not made by Method which is not focused on Method. We tested Risk occurring frequency and it's strength by checking the level of Risk. To solve and compensate the matter which happened by changing the each Method Check List to each General Inspection List, we added the each Method Check List by checking the importance of check list of each process. By doing this, the Check List for finding Risk level of Method was created by using the check list of each Method.

  • PDF

A Study on Correlation Analysis of Risk Factors for Urban Regeneration Using ISM method (ISM기법을 이용한 도시재생사업 리스크 요인의 상관성 분석에 관한 연구)

  • Park, Beom-Suk;Jin, Run-Zhi;Han, Sangwon;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.192-193
    • /
    • 2013
  • In recent years, risks associated with mixed used development in urban regeneration projects which have actively been implemented have been on the rise due to uncertainties and complexities of those projects. Thus, risk management is needed to effectively manage those risks that may occur during the process of a project. Many studies have contributed to deal with risk management of those projects. These studies, however, have focused main on identification stage and deriving the main risk factors and have limitations on presenting the relationship among those risk factors. Since many risks are interdependent and have multiple effects, the purpose of this study is to present a way(ISM method) to provide a hierarchical structural framework of risks in Urban Regeneration. The structural of risks can helps decision makers to trace the actual source of these risks.

  • PDF

A Case Study on Risk Factors and Risk Management in a Large-scale Project (대규모 프로젝트의 위험요인과 위험관리에 관한 사례연구)

  • Hong, Sa-Neung
    • The Journal of Information Systems
    • /
    • v.19 no.1
    • /
    • pp.97-116
    • /
    • 2010
  • Failures of super large projects like IT Upgrade of Shinhan Financial Group can be a heavy blow not only to the company but even to the national economy. Research on the practices of risk management in those projects will provide invaluable lessons, enhancing capabilities and chances of successfully executing mission critical projects of the companies and the national economy as a whole. This paper analyzes the risk management of the Core Systems Reconstruction which was the most critical component of IT Upgrade. The analysis covers risk management plans, and identification and evolution, and control and monitoring of risk factors. This study confirms the major results of previous research on risk management in Korea. However, the analysis found as well some discrepancies of practices from the previous research results. This research also tracked the trajectories of evolution of risk factors and management. In particular, in depth analysis of control and monitoring is the first research in Korea on the "management" of risks in IT projects. The result of this research is expected to be a useful guide for theory development and practices of risk management in the future.

A Risk Management Framework for New Product Development: A Case Study

  • Kasemset, Chompoonoot;Wannagoat, Jaruwan;Wattanutchariya, Wassanai;Tippayawong, Korrakot Y.
    • Industrial Engineering and Management Systems
    • /
    • v.13 no.2
    • /
    • pp.203-209
    • /
    • 2014
  • This research designed and implemented a supply chain risk management platform and applied it to a case study of reduced-fat Lanna pork sausage as a new product development project. The proposed framework has three stages: risk identification, risk assessment, and risk mitigation. Seventeen risk agents with 17 risk events were identified based on SWOT analysis and the Porter Five Forces concept through the process of planning, sourcing, making and delivering, partially captured from the supply chain operations reference model in the first stage. In the second stage, an house of risk (HOR) framework was applied to present the impacts of each risk agent. In the third stage, eight risk agents with high impact were selected to design 21 preventive actions. Finally, three preventive actions with the highest effectiveness to difficulty ratio scores-'sales evaluation of familiar products', 'increasing distribution channels and promotions to improve sales', and 'work flow improvement for work safety'-were then recommended for this new product development.

A Hazard Identification and Analysis for the Train Control System of Light Rail Transit (경량전철 열차제어시스템의 위험요인 분석)

  • 정의진;김양모
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.53 no.2
    • /
    • pp.99-106
    • /
    • 2004
  • Train control system in LRT (Light Rail Transit) is developed as a part of "Light Rail Transit System Development Project". But there was no specific requirement representing the system safety. Because system safety must be ensured before the customization, we applied the system to a officially recognized specific procedure, such as "A Guideline to Ensure the Safety of Train Control System in Korea" that was officially announced by KNR (Korea National Railroad) in 2001. We should draw system safely requirement to guarantee system safety for the first time. In this paper, the hazard identification and analysis to derive the safety requirement on LRT train control system are carried out following the KNR guideline. To analyze hazard, we have to deduce system functions, identify related hazards, derive the effects of the hazards, analyze current risk, define the target risk of the system, and deduce the alternative plans to reduce the effects of the hazards. After the hazard analysis following the upper procedure, 30 hazards are identified and analysed. Especially detailed analysis on train collision that is a main hazard of the train control of system is specially carried out.