The research and correspondence of schedule risk management at the pre-construction phase of curtain-wall (커튼월 공사의 착공 전 단계에서 공정 리스크 규명 및 대응방안)

  • Jung Tae-Sik;Kim chang-duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.71-79
    • /
    • 2005
  • As construction projects have been extremely enormous, complex and special, risk factors have been increased consistently. Therefore, it is very important to identify and cope with the uncertain risk factors in such building constructions for successful project accomplishment. The purpose of this research is to approach practical affairs directly and show detail alternatives of risk factors by extracting the risk factors throughout construction process of curtain wall that is largely influenced on cost, quality, schedule ,safety and following activity. Also, extracting these risk factors make it possible to analyze quantitative risk and decide the priority raking of risk factors. Especially, this research is aimed to provide efficient management of scheduling risk that can make the risk minimize to practical workers who have different degree of knowledge and experience to the construction cite when the risk brings out suddenly.

A Risk Assessment Counterplan for Reducing the Accident Rates in Medium and Small sized Construction Sites (중·소규모 건설현장의 재해율 감소를 위한 위험성평가 방안)

  • Jang, Yun-Ra;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.90-100
    • /
    • 2018
  • Government needs a risk assessment method that is effective in preventing accidents as a part of the three principal projects of the government for protecting the people's lives for establishing preventative measures to prevent accidents in the construction sites, which accounted for more than half of all accidental mortality accidents, and promote the safety-oriented culture for making fundamental changes. Accidents at the medium and small sized construction sites accounted for 88.9% of the total construction accidents. The data indicates that improper management and lack of advanced safety measures due to the absence of a safety supervisor are the biggest problems. It is believed that active measures to evaluate and prevent risks at construction sites are necessary for preventing accidents in the medium and small sized construction sites. The objectives of this study is to identify the key risk items of common accident causes and propose a practical, preemptive, and improved risk assessment method by evaluating the problems in the safety management of construction sites for reducing the accident rate in the medium and small sized construction sites.

Implementing Software Risk Management Process based on CMMI (CMMI기반의 소프트웨어 리스크 관리 프로세스 구축)

  • Do, Sung-Ryong;Han, Hyuk-Soo
    • Journal of Convergence Society for SMB
    • /
    • v.1 no.1
    • /
    • pp.45-53
    • /
    • 2011
  • There are always many kinds of risks in software development such as frequent changes of requirements. Especially those risks related to the software characteristic of non-visibility can be threat to the project success. That lead us to the need of process implementation to reduce and minimize those risks. Although, most of the organization recognizes the importance of risk management, actual implementation requires professional knowledge in this area. CMMI, the de facto standard in process reference model, also emphasizes on risk management process area but only provides goals and practices to be implemented, not detail procedure and methods. In this paper, we developed Risk management implementation model based on IDEAL, the process improvement model based on CMMI. The proposed model will help the organizations to implement risk management process which is proper to their situation in the factor of organization size and project characteristics.

  • PDF

A study on the mitigation model development for minimizing the incidents of disk unit in information system's operational risks (디스크 장애예방을 위한 피해저감모델 개발에 관한 연구 - 정보시스템 운영리스크의 관점에서 -)

  • Hwang, Myung-Soo;Lee, Young-Jai
    • The KIPS Transactions:PartD
    • /
    • v.14D no.6
    • /
    • pp.689-700
    • /
    • 2007
  • Organizations and customers lose if business activities we discontinued by an incident of information systems under the current business environment because they pursue real time enterprise and on demand enterprise. The loss includes the intangible decline in brand image, customer separation, and the tangible loss such as decrease in business profits. Thus. it is necessary to have preparedness in advance and mitigation for minimization of a loss due to the business discontinuity and information system's operational risks. This paper suggests the mitigation model for minimizing the incidents of disk unit in information system's operational risks. The model will be represented by a network model which is composed of the three items as following: (1) causes, attributes, indicators of an operational risk, (2) a periodic time through an analysis of historical data, (3) an index or a regulation related to the examination of causes of an operational risk.

Development of A Quantitative Risk Assessment Model by BIM-based Risk Factor Extraction - Focusing on Falling Accidents - (BIM 기반 위험요소 도출을 통한 정량적 위험성 평가 모델 개발 - 떨어짐 사고를 중심으로 -)

  • Go, Huijea;Hyun, Jihun;Lee, Juhee;Ahn, Joseph
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.4
    • /
    • pp.15-25
    • /
    • 2022
  • As the incidence and mortality of serious disasters in the construction industry are the highest, various efforts are being made in Korea to reduce them. Among them, risk assessment is used as data for disaster reduction measures and evaluation of risk factors at the construction stage. However, the existing risk assessment involves the subjectivity of the performer and is vulnerable to the domestic construction site. This study established a DB classification system for risk assessment with the aim of early identification and pre-removal of risks by quantitatively deriving risk factors using BIM in the risk assessment field and presents a methodology for risk assessment using BIM. Through this, prior removal of risks increases the safety of construction workers and reduces additional costs in the field of safety management. In addition, since it can be applied to new construction methods, it improves the understanding of project participants and becomes a tool for communication. This study proposes a framework for deriving quantitative risks based on BIM, and will be used as a base technology in the field of risk assessment using BIM in the future.

A Study on the Improvement of Risk Assessment Method in Laboratory (연구실 위험성평가방법 개선에 관한 연구)

  • Kim, Soo-Tae
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.3
    • /
    • pp.444-456
    • /
    • 2022
  • Purpose: Laboratories require Preliminary Risk Analysis of Hazard Factors, but there are many laboratories that do not. For the purpose of securing the safety of the laboratory, it is intended to find improvements so that the Risk Assessment can be easily applied. Method: Research papers and data from the Laboratory Safety Management Survey Report by the Ministry of Science and ICT were used. The study was conducted by comparing Preliminary Risk Analysis of Hazard Factors and Risk Assessment under the Occopational Safety and Health Act. Result: A technique for Risk Assessment of a laboratory was proposed. When Risk Assessment of the laboratory, a method was proposed to estimate the size of the possibility(frequency) and severity(intensity). Conclusion: For easy application in the laboratory, a checklist-type Risk Assessment technique was presented and actual evaluation was conducted. It is expected that the laboratory will improve through Risk Assessment to help prevent safety accidents.

IT Risk Assessment: Case Study on Domestic Construction company (IT 리스크 평가 연구사례: 국내 건설사 적용 사례)

  • Lee, youngjai;Lee, Sungjung;Lee, Seongil
    • Journal of Korean Society of societal Security
    • /
    • v.2 no.1
    • /
    • pp.47-55
    • /
    • 2009
  • Organizations and customers lose if business activities are discontinued by an incident of information systems under the current business environment because they pursue real time enterprise and on demand enterprise. The loss includes the intangible decline in brand image, customer separation, and the tangible loss such as decrease in business profits. Thus, it is necessary to have preparedness in advance and mitigation for minimization of a loss due to the business discontinuity and IT risks. This paper described a IT risk assessment case about domestic construction company.

  • PDF

TBM risk management system considering predicted ground condition ahead of tunnel face: methodology development and application (막장전방 예측기법에 근거한 TBM 터널의 리스크 관리 시스템 개발 및 현장적용)

  • Chung, Heeyoung;Park, Jeongjun;Lee, Kang-Hyun;Park, Jinho;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.1
    • /
    • pp.1-12
    • /
    • 2016
  • When utilizing a Tunnel Boring Machine (TBM) for tunnelling work, unexpected ground conditions can be encountered that are not predicted in the design stage. These include fractured zones or mixed ground conditions that are likely to reduce the stability of TBM excavation, and result in considerable economic losses such as construction delays or increases in costs. Minimizing these potential risks during tunnel construction is therefore a crucial issue in any mechanized tunneling project. This paper proposed the potential risk events that may occur due to risky ground conditions. A resistivity survey is utilized to predict the risky ground conditions ahead of the tunnel face during construction. The potential risk events are then evaluated based on their occurrence probability and impact. A TBM risk management system that can suggest proper solution methods (measures) for potential risk events is also developed. Multi-Criterion Decision Making (MCDM) is utilized to determine the optimal solution method (optimal measure) to handle risk events. Lastly, an actual construction site, at which there was a risk event during Earth Pressure-Balance (EPB) Shield TBM construction, is analyzed to verify the efficacy of the proposed system.

A Study on the Quantitative Risk Level Calculation Model in Cooperation with the Reserve Fund (예비비와 연계한 정량적 리스크 수준 산정 모델에 관한 연구)

  • Kwoak, Song-Hae;Park, Koo-Rack;Kim, Dong-Hyun
    • Journal of Digital Convergence
    • /
    • v.14 no.10
    • /
    • pp.159-166
    • /
    • 2016
  • Recent public information project, which has been organized mainly to large companies is a situation that is being reorganized to small and medium-sized systems integration company. However, many of the small and medium-sized companies lack knowledge of the systematic risk management. Thus, in connection with the revenue, it involves a number of problems. Therefore, in this paper, we present a risk element that occurs mainly in the field of the project, providing a model for measuring the risk element by risk level costs associated with this. Through the convergence, we aim at providing a management system that is able to make the project successfully accomplished, predicting the risk that occurs in advance to pursue the project; Based on the proposed model, it is possible to secure a proper size of reserve fund so it is expected to enable companies to ensure the cost of risk analysis.

An Analysis on the Characteristics of Each Phase's Risk Factors for High-Rise Development Project (초고층 개발사업 추진을 위한 단계별 리스크 요인의 특성 분석)

  • Chun, Young-Jun;Cho, Joo-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.103-115
    • /
    • 2016
  • The 106 buildings of 200 meters' height or greater were completed around the world in 2015 (CTBUH, The Council on Tall Buildings and Urban Habitat). They beat every previous year on record, including the previous record high of 99 completions in 2014. This brings the total number of 200-meter-plus buildings in the world to 1,040, exceeding 1,000 for the first time in history and marking a 392% increase from the year 2000, when only 265 existed. South Korea recorded three completions during 2015 - improving slightly over 2014, in which it had one. This study focused on the fact that high-rise building development project risks have not reduced in Korea in spite of numerous studies and measures. And it attempted to examine whether existing studies and measures have been presented on the basis of the accurate analysis of existing studies and measures and classify and analyze the characteristics of each phase' s risk factors in the hope that its results would be one reference point as to the measure to prevent high-rise building development project risks in the future. A high-rise building development project is the high risk project as compared with the low-rise project. Because a high-rise development project takes long and is very sensitive to the changing environment. Therefore, in order to succeed the project it becomes necessary to effectively manage the risk involved in the process of the high-rise building development project. The result of this study can be used as the guideline to make the risk management system for the high-rise development project.