• Title/Summary/Keyword: Resource cost

Search Result 1,424, Processing Time 0.022 seconds

Strong NP-completeness of Single Machine Scheduling with Resource Dependent Release Times and Processing Times (Release와 Processing time이 투입자원에 종속적인 단일설비 일정계획문제의 Strong NP-completeness 분석)

  • Lee, Ik Sun
    • Korean Management Science Review
    • /
    • v.31 no.2
    • /
    • pp.65-70
    • /
    • 2014
  • This paper considers a single machine scheduling problem to determine release and processing times where both the release times and processing times are linearly decreasing functions of resources. The objective is to minimize the sum of the associated resource consumption cost and scheduling cost including makespan, sum of completion times, maximum lateness, or sum of lateness. This paper proves that the scheduling problem is NP-hard in the strong sense even if the release times are constant.

Economic valuation for Recreation Roles of Tourist Farms (관광농원의 레크리에이션 기능에 대한 경제가치 평가)

  • Shin, Yong-Kwang;Rhee, Sang-Young;Cho, Soon-Jae;Kang, Kyeong-Ha
    • Journal of Korean Society of Rural Planning
    • /
    • v.10 no.1 s.22
    • /
    • pp.35-40
    • /
    • 2004
  • The expansion of demand associated with leisure, which has resulted from the elevated standard of living, has made the domestic tourist demand diversified. Recently, people, especially urban population, show the higher interest and need for environmentally friendly rural tourism. This study aims to grasp the utilization of recreation roles of tourist farms and then to evaluate the economic value for recreation roles of tourist farm using Traveling Cost Method. Data were collected from a survey in 2003. The results show that its value is 62,037 won per head annually and so the tourist farms play their role of connecting the urban population with rural amenity.

Human Resource Management and Intra-Industry Trade

  • Lee, Yang-Seung
    • Journal of Korea Trade
    • /
    • v.23 no.8
    • /
    • pp.27-44
    • /
    • 2019
  • Purpose - The purpose of this paper is to develop a tractable general-equilibrium model of examining the impact of human resource management on intra-industry trade. Commonly, managers of Korean firms are promoted internally. It necessitates a study of human resource management and its impact on an industrial equilibrium. Design/methodology - This paper relies on theoretical analysis. We build a model in firms are hierarchical; an entrepreneur, managers, and workers. All individuals have heterogeneous managerial talents, which are the main source of managerial quality. Firms search talents for prospect managers, and eventually delegate them to supervise workers. The searching incurs a sunk cost. Findings - Our finding is as follows. Country 1, relatively abundant of managerial talents, can gain more from trade than Country 2, relatively scarce of managerial talents. This is because the higher searching cost leads to the lower survival rate of firms in Country 2. Implicatively, good jobs are destroyed, and aggregate income falls in Country 2. Originality/value - According to our study, relative abundance of managerial talents affects distribution of firm size and determines trade gain. This study can contribute to the literature of organization management and trade.

Methods and Applications to estimate the Conversion Factor of Resource-based Relative Value Scale for Nurse-Midwife's Delivery Service in the National Health Insurance (조산원(助産院)의 분만간호서비스에 대한 건강보험수가 산출방법과 적용방안)

  • Kim, Jin-Hyun;Jung, Yoo-Mi
    • Journal of Korean Academy of Nursing
    • /
    • v.39 no.4
    • /
    • pp.574-583
    • /
    • 2009
  • Purpose: This paper analyzed alternative methods of calculating the conversion factor for nurse-midwife's delivery services in the national health insurance and estimated the optimal reimbursement level for the services. Methods: A cost accounting model and Sustainable Growth Rate (SGR) model were developed to estimate the conversion factor of Resource-Based Relative Value Scale (RBRVS) for nurse-midwife's services, depending on the scope of revenue considered in financial analysis. The data and sources from the government and the financial statements from nurse-midwife clinics were used in analysis. Results: The cost accounting model and SGR model showed a 17.6-37.9% increase and 19.0-23.6% increase, respectively, in nurse-midwife fee for delivery services in the national health insurance. The SGR model measured an overall trend of medical expenditures rather than an individual financial status of nurse-midwife clinics, and the cost analysis properly estimated the level of reimbursement for nurse-midwife's services. Conclusion: Normal vaginal delivery in nurse-midwife clinics is considered cost-effective in terms of insurance financing. Upon a declining share of health expenditures on midwife clinics, designing a reimbursement strategy for midwife's services could be an opportunity as well as a challenge when it comes to efficient resource allocation.

Nursing cost in Operating Room applying the Resource-Based Relative Value Scale(RBRVS) (수술간호행위별 상대가치(Resource-Based Relative Value)의 측정 및 간호수가 산정)

  • Kim, Myung-Soo;Kim, Young-Hae;Kim, Jung-Soon;Lee, Hae-Jung
    • Journal of Korean Academy of Nursing Administration
    • /
    • v.8 no.2
    • /
    • pp.283-293
    • /
    • 2002
  • Purpose: The purpose of this study was to define cost-countable perioperative nursing activities and to analyze the cost of each nursing activities based on the Resource-Based Relative Value Scale (RBRVS). Method: Researcher and 3 research assistants observed and documented the 83 operating patients in order to measure nursing time for each of the perioperative nursing activities. And then, 35 operating room nurses with at least one year of perioperative nursing experience were observed for the RBRVS of perioperative nursing activities. Finally, the direct and indirect nursing costs were estimated. Result: Nursing costs of 25 nursing activities were estimated using the RBRVS. Most expensive nursing activities were delivery of the instrument and implement for OP team (9,780 won per hour) and behavior of wash, pack, disinfect the instrument (6,770). Conclusion: Based on the relative values of each perioperative nursing activities estimated in this study, proper medical reimbursement system should be established in a near future.

  • PDF

Analysis of Excavation Speed and Direct Construction Cost Based on the Operating Productivities of TBM Method Site - Diameter 5.0m Target (수로터널공사의 효율성 분석을 통한 굴진속도 및 직접공사비 분석 - 구경 5.0m 중심으로)

  • Park, Hong Tae;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.8 no.4
    • /
    • pp.328-335
    • /
    • 2012
  • The resource-based estimating based on standard unit price of construction work was estimated by multiplying the price per standard unit of work on the amount of labor, material, equipment use time. However, limitation of the resource-based estimating way does not adequately reflect the actual transactions prices. On the subject of water tunnel excavation as a new attempt to overcome these limitations, this study analyzed productivity by work type into cutter inspection/ exchange, TBM maintenance, TBM inspection/refueling, subsequent installations, tramcar, operating change, a cave-underground reinforcement / rock reinforcement, safety / meetings and analyzed actual cost estimating and the net advance rate based on this analysis result. Actual cost estimating calculation approach presented in this study can be utilized as a useful tool to predict the actual cost estimating in the TBM water tunnels field.

Development of a Descriptive Cost Effectiveness Model for a Subcontractor with Limited Resources

  • Kim, Dae Young
    • Journal of KIBIM
    • /
    • v.7 no.3
    • /
    • pp.40-48
    • /
    • 2017
  • It only takes one failed project to wipe out an entire year's profit, when the projects are not managed efficiently. Additionally, escalating costs of materials and a competitive local construction market make subcontractors a challenge. Subcontractors have finite resources that should be allocated simultaneously across many projects in a dynamic manner. Significant scheduling problems are posed by concurrent multi-projects with limited resources. The objective of this thesis is to identify the effect of productivity changes on the total cost resulting from shifting crews across projects using a descriptive model. To effectively achieve the objective, this study has developed a descriptive cost model for a subcontractor with multi-resources and multi-projects. The model was designed for a subcontractor to use as a decision-making tool for resources allocation and scheduling. The model identified several factors affecting productivity. Moreover, when the model was tested using hypothetical data, it produced some effective combinations of resource allocation with associated total costs. Furthermore, a subcontractor minimizes total costs by balancing overtime costs, tardiness penalties, and incentive bonus, while satisfying available processing time constraints.

Economic value evaluation of operating reserve based on opportunity cost (기회비용에 의한 운전예비력의 경제적 가치 평가)

  • Yoon, Yong-Beum;Lee, Jae-Gul;Ahn, Nam-Sung
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.751-753
    • /
    • 2005
  • In this raper, Economic value of reserve margin i.i presented by opportunity cost for Korean power system, and the level of compensation for spinning reserve that is necessary to operate power system stably is proposed. The generator that is giving up for opportunity to participate in energy market must take opportunity cost. it is relative to not only whole demand level but also marginal cost of each resource. In this paper, assume that all resource in Korea is equivalent to six generator for simulation. and we evaluate value of reserve in the time of high demand and low demand. Also we propose the way to improve a evaluation method by examine relationship between capacity payment and value of reserve.

  • PDF

Cost-Aware Dynamic Resource Allocation in Distributed Computing Infrastructures

  • Ricciardi, Gianni M.;Hwang, Soon-Wook
    • International Journal of Contents
    • /
    • v.7 no.2
    • /
    • pp.1-5
    • /
    • 2011
  • Allocation of computing resources is a crucial issue when dealing with a huge number of tasks to be completed according to a given deadline and cost constraints. The task scheduling to several resources (e.g. grid, cloud or a supercomputer) with different characteristics is not trivial, especially if a trade-off in terms of time and cost is considered. We propose an allocation approach able to fulfill the given requirements about time and cost through the use of optimizing techniques and an adaptive behavior. Simulated productions of tasks have been run in order to evaluate the characteristics of the proposed approach.

A Bicriterion Scheduling Problems with Time/Cost Trade-offs (시간/비용의 트레이드-오프를 고려한 2목적 스케쥴링 문제)

  • 정용식;강동진
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.4 no.2
    • /
    • pp.81-87
    • /
    • 1999
  • This paper discusses a bicriterion approach to sequencing with time/cost trade-offs. The first problem is to minimize the total flow time and the maximum tardiness. And second is to the maximum tardiness and resource allocation costs. This approach, which produces an efficient flintier of possible schedules, has the advantage that it does not require the sequencing criteria to be measurable in the same units as the m allocation cost. The basic single machine model is used to treat a class of problems in which the sequencing objective is to minimize the maximum completion penalty. It is further assumed that resource allocation costs can be represented by linear time/cost function.

  • PDF