• 제목/요약/키워드: Residential Land Development Project

검색결과 46건 처리시간 0.026초

급속한 도시팽창과정에서 도시토지이용변동의 실증적 연구 (An Empirical Study on Urban Land Use Changing Patterns with the Rapid Urban Expansion)

  • 김지열;강병기
    • 지역연구
    • /
    • 제8권1호
    • /
    • pp.31-50
    • /
    • 1992
  • The aim of this paper is to define major factors influencing land development of each of major uses (residential, commercial, industrial) in the process of rapid urban expansion. The main hypothesis of this study is that land use changing patterns are directed by supply side of land managed to public policies rather than demand side. The graphic analysis is applied to relationships between urban growth and land development process of each use and between land development project managed to public policies and land development process. Public and land development projects and zonning protection seem to be major roles of land supply and main determinants of urban spatial structure. Location factors for land development of each uses are selected in 23 variables. Factor analysis is applied to test correlation between variables in 1971 and 1981. Factor structure between two years is similar, but progressive processing of functional separation is derived such as intensive land use is grouped, different location between residential and industrial use is deep. Dependent variables are standardized to logarithm of land development of each use per unit vacant land in two periods, between 1971 and 1980 year and between 1981 year. Correlation analysis between 6 dependent variables and 23 location factors in each years are applied. Major factors of each use are selected in criteria such as high correlation with dependent variables, low correlation between independent variables and common application in two periods. As the result, major factors for residential land development are Land Readjustment Project (LRP), percent of total zoned area in residential zone, residential floor space density per available area, percent of total area in industrial use; for commercial development is distance to CBD, percent of total area in commercial use, residential floor space density per available area in each year, and volumn rate of industrial use; for industrial use is percent of total area of industrial use is percent of total area of industrial use, Industrial Estate Project (IES), LRP, and distance from CBD. Land development pattern of each use between two periods are slightly different. So 6 equation is derived from appling backward method of regession. Adjusted multiple R squares of all is more than 0.5 and those equation is statistically significant and valuable to assist urban land use forecasting.

  • PDF

택지개발사업의 계획특성이 사업지구 지가변동에 미치는 영향 (The Impact of Plan Characteristics of Residential Land Development Project on Inner Land Price Change)

  • 장인수
    • 한국산학기술학회논문지
    • /
    • 제17권8호
    • /
    • pp.698-705
    • /
    • 2016
  • 본 연구의 목적은 택지개발사업의 계획특성이 사업지구의 지가변동에 미치는 영향을 분석하여 택지개발사업의 효율적인 추진을 위한 정책적 시사점을 도출하는 것이다. 이를 위해 우선 청주시 택지개발사업 추진단계별 지가변동 규모와 양상을 분석하였다. 그리고 이론적 고찰 및 선행연구 검토를 통해 지가변동에 영향을 주는 택지개발사업의 계획특성 요소 16개((1)지가변동률, (2)사업구역 면적, (3)주거용지 비율, (4)상업용지 비율, (5)준주거용지 비율, (6)근린생활시설용지 비율, (7)공동주택 비율, (8)도로율, (9)공원 녹지율, (10)학교 비율, (11)$1m^2$당 조성비, (12)일반주거지역 비율, (13)준주거지역 비율, (14)상업지역 비율, (15)준공업지역 비율, (16)자연녹지지역 비율)를 선정하였다. 선정된 계획특성 요소 16개 중 지가변동에 영향을 미치는 요인을 분석하기 위하여 SPSS 20.0 Version을 이용하여 상관관계를 분석하였다. 지가변동의 양상을 분석한 결과, 지구가 지정되기 2년 전부터 지가가 상승되기 시작하였고 준공이후 지가상승이 안정화되는 것으로 분석되었다. 그리고 지가변동에 영향을 주는 계획특성 요소를 분석한 결과 (2)사업구역 면적, (4)상업용지 비율, (6)근린생활시설용지 비율, (8)도로율, (11)$1m^2$당 조성비, (12)일반주거지역 비율이 지가변동에 영향을 미치는 것으로 분석되었다.

택지개발사업의 환경친화적 대안평가모형 구축 (Alternative Evaluation Model in the Development of Environment-friendly Residential Land)

  • 정인수;이찬식
    • 한국건설관리학회논문집
    • /
    • 제10권1호
    • /
    • pp.156-166
    • /
    • 2009
  • 최근 들어 택지개발사업이 크게 증가하는 추세이지만, 무분별한 택지개발은 개발대상 부지의 기존 녹지나 수목을 훼손시키게 되며 지형에도 많은 변화를 가져와 절개지가 발생하게 하는 등 환경을 많이 훼손하고 있다. 택지개발 등 개발사업을 시행할 때 지구지정시 수행하는 사전환경성검토제도와 개발계획의 승인전 협의를 하게 되어 있는 환경영향평가제도가 있다. 사전환경성검토는 택지개발계획 수립 후에 시행하며 환경영향평가는 실시설계 완료 후에 수행하기 때문에 선정된 택지개발지에서 발생할 수 있는 환경문제에 대한 저감방안 강구 등 소극적이고 수동적인 대처에 그치는 경우가 많다. 본 논문의 목적은 초기 입지선정단계에서 택지개발사업을 환경친화적으로 지속가능하게 수행할 수 있도록 대안평가모형을 구축하는 것이다. 이를 위해 선행연구에서 조사된 택지개발사업의 환경평가요인을 바탕으로 퍼지추론과 AHP기법을 이용하여 대안평가 모형을 구축하였다. 의사결정자가 각 대안의 환경훼손도를 10점 척도법에 의해 평가하면 퍼지추론에 의해 환경성능(EP: Environmental Performance)으로 변환하고, AHP기법에 의해 미리 산정된 항목별 가중치를 적용하여 통합환경성능(TEP: Total Environmental Performance)을 산정한다. 통합환경성능이 가장 높은 대안이 최적안으로 선택된다. 이 연구에서 제시한 평가방법을 적용하면 토지이용계획이 확정되지 않은 상태에서 두 가지 이상의 택지개발 예정지역 대안을 정량적으로 평가할 수 있을 것이다. 이로써 택지개발 사업시행으로 발생할 수 있는 환경훼손을 초기 입지단계에서 확인하여 환경오염을 원천적으로 제거해 나갈 수 있을 것이다.

주거환경개선사업이후 주거 환경 변화에 관한 연구 - 대구광역시 주거환경개선사업의 물리적 환경 분석을 중심으로 - (A Study on the Changes in Residential Environments after Residential Environments Improvement Projects)

  • 김영화;이상홍
    • 대한건축학회논문집:계획계
    • /
    • 제34권10호
    • /
    • pp.3-12
    • /
    • 2018
  • This research aims at analyzing the changes in residential environment after a residential environment improvement project focusing on the analysis into the physical environment of a residential environment improvement project, and examining in what direction the changes by residents' own efforts occurred after public support, such as infrastructure. The present residence development method has become different from the previous pulling down method and is focused on regeneration. By examining in what direction the target residence is being changed because of the development by residents' own efforts after the government's public investment at this time, this study also aims at investigating the direction to develop a guideline for residential improvement for later improvement of deteriorated residence. As for the contents of the analysis, changes in public support, such as infrastructure, and other areas after the residential environment improvement project were compared and analyzed from the land use, street system, and condition of buildings before the residential environment improvement project through field survey, geographic information system(GIS), registered land and building data and so on. The biggest change since the support from the government was that at the beginning of the project, the application of special provision of building laws and different financial supports led to lots of newly built buildings. Since then, their number has decreased rapidly, and in most cases, there have been some changes in part, such as changes in the use of land or repair of disposal tanks. Most newly built buildings were multi-household houses, and it has caused road capacity and parking lot capacity, etc., to be exceeded, which has worsened the pleasantness of the living environment. In addition, other problems have also appeared, for example, the lack of residence supporting facilities yet with a higher level of residential density. Regarding the changes in the residential environment after the residential environment improvement project, maintenance of houses were conducted in some degree as diverse alleviation policies to improve poor residence, yet the absence of the guideline for the direction of developing the whole district has made the residence environment more dense and deteriorated. To solve these problems, in advance to a residential improvement project, specific management methods based on short-, mid- and long-term plans for the direction of development by residents' own efforts and a sustainable guideline seem to be necessary.

공동주택단지 건설에 있어서 주거환경과 가구밀도에 관한 연구 -택지개발사업지구를 중심으로- (A Study on the Relationship between Dwelling Environment and Household Density in Multi-Family Housing Development)

  • 한상훈
    • 한국주거학회논문집
    • /
    • 제9권2호
    • /
    • pp.33-41
    • /
    • 1998
  • To accomodate increasing housing shortage in many cities, Korean Government has implemented various residental land development projects to provide more land for new housing construction. Most of the residential areas developed by these projects were used for multi-family housing units. Under this process, the size and location of the neighborhood service facilities in the development area were regulated by uniform standards. For this reason, the neighborhood service facilities were not able to be provided according to the household density but provided in minimum status required by these standards. Based on these considerations, this study aimed to evaluated residential land development project conducted by pubilc authority, one of the residential land development projects in Korea. Results of the case studies confirmed findings from literature review and proposed that existing regulations applied to these projects need to be amended not only to accomodata unique situation of each development area but also to enhance level of the dwelling environment. As ways to resolve these problems, this study suggests followings: (1) more flexible operation of the regulations, (2) inclusion of the socio-economic characteristics of the perspective resident in planning process, and (3) introduction of design techniques in the project. Finally, this study proposed future study directions in relation to this issue.

  • PDF

택지개발에 따른 기반시설 적기공급을 위한 유관기관 협조융자와 민간참여 방안 (Optimal Provision of Service Facilities for Large-scale Land Development Projects: A Loan Scheme and a Consortium Approach)

  • 서승환;김경환
    • 지역연구
    • /
    • 제8권2호
    • /
    • pp.1-9
    • /
    • 1992
  • One of the problems associated with the current system of land development projects implemented by the public sector in Korea is that various service facilities are not ready in time for the occupation of residential dwelling. A major cause of the problem is the lack of financial arrangements which would smooth the cash-flow of the suppliers of the facilities during the project period. In this paper we present two schemes which will contribute to the optimal provision of service facilities by easing the financial constraint facing the land developers and suppliers of the facilities. The first scheme involves channeling a fraction of profits from a land development project and of the proceeds of mandatory sales of Type II National Housing Bonds as a loan to the suppliers of the service facilities. The second scheme considers the participation of the private sector in the project as a member of a consortium comprising the Korea Land development Corporation, the National Housing Fund, and private developers. It is proved that each scheme is superior to the current system. as well as entailing a very small cost.

  • PDF

Changes in Parks and Green Spaces Ratio According to Land Ownership Processing Method in Urban Development

  • Lee, Sang Jo;Huh, Keun Young;Chung, Jae Woo
    • 인간식물환경학회지
    • /
    • 제21권6호
    • /
    • pp.545-555
    • /
    • 2018
  • The purpose of this study was to analyze land use plans of 61 residential complexes and identify the factors that caused the variation of urban parks and green space ratio depending on the land ownership processing method. The ratio of urban parks and green space of expropriation districts was higher than that of replotting districts. Within the same city and country as well as other regions, the parks and green space ratio of land expropriation districts increased higher than 7% compared to that of replotting districts. The variation of urban parks and green space ratio was mainly related to the ratio of road. Small housing complexes such as detached house and quasi-residential sites resulted to expand space for road construction, thus, the areas of urban parks or green space came to reduce. The average urban parks and green space ratio in the urban development by the expropriation method and replotting method are 24.5% and 16.8% respectively. In order to prevent the reduction of urban parks and green space ratio according to the preference of detached house sites or quasi-residential sites in development zones, it is necessary to make systematic adjustment such as adjusting the urban parks and green space ratio securing standard.

Revitalization of Urban Regeneration through the Happiness Housing Project as Public Housing Policy

  • Kim, Ok-Yeon;Lee, Jae-Pyeong
    • 토지주택연구
    • /
    • 제5권3호
    • /
    • pp.151-167
    • /
    • 2014
  • Urban space structure in South Korea when through drastic changes ever since public housing policies began their full-fledge implementation. That is, public housing policies represent the main cause for formation of the current urban space structure, as the public houses are constructed in accordance with changes of demographic/social structure, considering changes of housing demand, in urban spaces demanded by the end users. After rapid industrialization and urbanization in the 1960's, each government in different periods have implemented housing supply policies through massive urban developments, to resolve the issue of housing shortage and residential instability. Phase 1 New Towns were developed in the 1980's resulting in suburbanization of the Seoul Area, followed by urban sprawl due to construction of small-size New Towns after deregulation in the 1990's, and construction of Phase 2 New Towns for resolution of housing shortage in the early 2000's and the resulting urban problems. In the mid-2000's, construction of Bogeumjari houses in GB areas led to insufficient housing supply in downtown areas, and the period after 2010 witnessed continuous deterioration of existing urban areas and acceleration of the rental housing crisis caused by rental housing shortage in downtown areas. Moreover, the residentially vulnerable classes consisting of young, 1~2-member households is expanding, with the real estate market in recess. Therefore, the government is trying to achieve urban regeneration through public housing policies so as to resolve the urban space problem and the housing problem at the same time, and the Happiness Housing Project has been implemented as a policy to achieve that goal. The Happiness Housing Project for young, residentially vulnerable classes in downtown areas, is going through diversification aimed at conjunction with urban regeneration projects in downtown areas, as exemplified by conversion of rental houses in residential environment improvement project districts and redevelopment/reconstruction project districts into happiness housing, and supply of happiness housing in conjunction with small reorganization projects for deteriorated residential areas in such areas as those excluded from New Town designation. Continuous supply of Happiness Housing in conjunction with urban regeneration requires mixed-use residential development which includes convenience facilities and public facilities, along with improvement of rental conditions (rental period/rent) and diversification of project methods, considering that the project is implemented in downtown areas.

환경영향평가 대상사업에 적용가능한 생태면적률 지표 평가체계 개선 (Improvement of Biotope-Area-Ratio-Indicator and Appraisal System Applicable to Environmental Impact Assessment Projects)

  • 이관규;이상혁;김경호;이정환
    • 한국환경복원기술학회지
    • /
    • 제14권5호
    • /
    • pp.113-125
    • /
    • 2011
  • Since the government of Korea (Ministry of Environment, MOE) introduced the policy applying 'Biotope-Area-Ratio-Indicator (BARI)' to huge residential land developments which Environmental Impact Assessment (EIA) should be performed, MOE has come to have the necessity to apply the indicator concretely at the stage of Prior Environment Review System (PERS) and EIA in various types of large scale land development projects. This study was conducted with the aim of supporting the application of BARI and related decision making in various other types of EIA projects as well as residential development projects through remodeling the system to apply the indicator of the past. Through the analysis of the problems in applying the past BARI and experimental appraisals to 11 types of EIA projects, the results and implications as follows were drawn. First, it's possible to extend the range of applications of BARI, which has been applied to only residential land development project, to all kinds of projects with area-typed land use pattern out of environmental impact assessment target projects. Second, it's also possible to set a target value into which regional characteristics and differences among locational properties are reflected. In addition, it's come to be able to differentially apply the target value of BARI according to the condition of the existing site. Third, it's improved to be able to suggest a macroscopic target value at the stage of PERS and to set detailed target values in each detailed land use at the stage of EIA. The key point underlies inducing methodology to determine target values to secure more permeable land coverage ratio for detailed land use patterns at the stage of EIA by making it possible to calculate BARI of the present land cover condition of the EIA target projects.

거점확산형 주거환경개선 시범사업 실태조사 및 개선방향 연구 (Site Analysis and Improvements on Pilot Project of Core-Based Residential Environment Improvement)

  • 백혜선;이영환;김재승
    • 한국주거학회논문집
    • /
    • 제27권4호
    • /
    • pp.1-11
    • /
    • 2016
  • This study aims to find out the cause of delay by analyzing the process of 12 Core-based Improvement pilot projects, especially focused on lands, buildings, population status. For this purpose, it performed a literature research on maintenance plan reports, various statistics of building and population status analysis, a field research and an individual interview with public officials in charge at local governments of 12 project districts. The findings are as follows; 1) it was difficult to cope flexibly to environmental changes because the core sector was so large that the plan was led to areal improvement. 2) the project was selected without reflecting the characteristics of the core sector and the area of residents-led renovation properly in terms of building status such as building density and old buildings ratio, 3) the coordinator group for socially disadvantaged class in the district was not operated and thus foundation for residents-led renovation was not set up. In conclusion, it should be presented the proper size of the core sector when the core-based residential environment improvement project is initiated in the future. In addition, building status is taken into consideration when designating the core sector and the area of residents-led renovation. The coordinator group needs to be operated from the early stage of the project as well.