• Title/Summary/Keyword: Request for Proposal

Search Result 79, Processing Time 0.028 seconds

A Study on Proposal for Systematic Development of the Inspection of Cadastral Surveying Value -the Case of Sungnam City- (지적측량 성과검사의 제도적 재선방안에 대한 연구 -성남시를 중심으로-)

  • 김욱남;박희주
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.16 no.1
    • /
    • pp.133-138
    • /
    • 1998
  • Korea's inspection of cadastral surveying value is carrying out based on cadastral law, and has to enter in cadaster after government office's final inspection of cadastral surveying of land alteration according to the request of land owner or the state. Therefore, government office has to inspect the value of surveying before arranging cadastral book, and has to confirm whether the surveying error is whithin the range of allowing one. If it is, a govenment office has to arrange the cadastral book according to resulting Value. This study investigates and analizes annual land alteration of Sungnam city and analizes the situation of government office's cadastral surving value, the number of inspectors, and equipments. As a result, this study shows the problem and provides effective basic materials, increases the efficacy of the state's cadastral surveying inspection, and minimiges land dispute.

  • PDF

Proposing a BIM Activation Plan in Civil Projects by Investigating Guidelines in Procurement Processes - Proposing Contents of Guidelines to Support BIM Project in the Road Sector - (국내 발주지침 보완을 통한 토목분야 BIM 활성화 전략 제안 - 도로분야 BIM 프로젝트 지원을 위한 과업지시서 구성요소 제안 -)

  • Choi, Go-eun;Lee, Jaewook;Hong, Chang Hee;Moon, Hyeonsuk;Kim, Do Young
    • Journal of KIBIM
    • /
    • v.13 no.2
    • /
    • pp.47-57
    • /
    • 2023
  • The purpose of this study is to propose a guideline to help the client and bidder operate the BIM project in the domestic road field. As BIM design is mandatory in the construction field, documents disclosed by the ordering agency must essentially include procedures and step-by-step requirements to support BIM. The purpose of this study is to propose the structure and components of the guidelines that practitioners need practically by utilizing the currently announced road field guidelines. The guidelines are analyzed based on the procurement documents that were pre-emptively shared overseas, and supplemented according to the domestic situation. Furthermore, the effectiveness of the revised guidelines is confirmed through expert consultation. This study aims to contribute to creating an environment in which construction practitioners who have no experience in BIM project can efficiently carry out BIM projects.

The Meaning and Usefulness of Simulation Method for Business Process Reengineering -Focused on the Korean Supreme Court BPR Project (1994-2003)-

  • Hong, Sung-wan;Roh, Tae-hoon;Kang, Sung-min;Lee, Jung-woo;Kang, Ga-na
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2001.10a
    • /
    • pp.170-202
    • /
    • 2001
  • Simulation is used to reduce a risk involved in the new project and decision-making in an organization and to save cost and time by forecasting different situations. The objectives of this research are to acknowledge the need of simulation through the real life sample and to encourage the use of the simulation method in the future consulting project by continuously making the necessary improvements. This research analyzed the effectiveness of the simulation based on the sample use of simulation method in 1994 and 1997 for the BPR project of certification issuance process at the Supreme Court. In order to evaluate the value of the proposed simulation model, we examined the gap, which existed between the simulation result and the operational data collected by visiting the actual sites where AROS (Automated Registry Office System: automation system developed by LG-EDS Systems) is being utilized. We also identified the causes for the existing gap. According to the analysis result, (1) the gap came from the status change of thinking that the concentration of certification issuance request has eased after the computerization, (2) the gap existed in the operational process because they failed to consider the situational factors of each registry office in the simulation model, and (3) lastly the gap came from the difficulty of formulating the mathematical model for predicting the complex and diverse behavior pattern of individuals requesting the certification issuance. In order to narrow the existing gaps, we made a proposal to improve the certification issuance process where software of certification issuance vending machine was upgraded in order to help the people to use the service conveniently, more part time workers were hared when there was a overload of certification issuance request, and the quality of the certification Issuance vending machine is improved, In this research, we examined an efficient way of resource allocation based on the simulation conducted in 1994 and 1997. By reflecting changes since the simulation of 1994 and allocating the clerk and machine based on the predicted results of the simulation, we maximized the efficiency of the certification issuance process. In conclusion, this research examined the future usability of simulation method based on the analysis result and identified the key issues to consider when using the simulation method in the future consulting project.

  • PDF

R&D Project Planning of Photovoltaic Industry for Small and Medium Enterprises (태양광산업 분야의 중소기업형 R&D 과제 기획 연구)

  • Suh, Min-Ho;Kwon, Young-Il
    • Journal of the Korean Solar Energy Society
    • /
    • v.30 no.3
    • /
    • pp.81-89
    • /
    • 2010
  • The photovoltaic industry is one of the main research areas for regenerable energy usage and green growth policy of the Korean government. R&D programs of MEST(Ministry of Education, Science and Technology) and MKE(Ministry of Knowledge Economy) are concentrating on the development of fundamental and applicable technology which can be carried out by a so-called "Big company" consortium. So it is essential to discover and support R&D projects for small and medium enterprises(SMEs) in the photovoltaic industry. R&D projects should be funded effectively to enhance the competitiveness of the SMEs. It is a complicated process as to decide what R&D projects or key element technologies should be selected and how to support them. In this paper, the supply chain analysis is adopted as a critical tool for selecting the research areas and topics for the SMEs, which can be done by analyzing the number of the SMEs, the level of imports and the localization possibility for each supply chain element. We define the strategic products for the SMEs to deduct core technologies for each strategic product. R&D projects definition sheets are proposed for each core technology. All the decision making processes are authorized by a committee which consists of experts for academia, industries and the research field. The efficacy of the proposed framework is described throughout the photovoltaic industry.

FACTOR ANALYSIS ON CONTRACTOR COMPETITION STRATEGY: A HONG KONG STUDY

  • L. Y. Shen;Y. T. Tan;S C Song;M X Yu
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.289-298
    • /
    • 2007
  • The development of construction industry has led to the increase in the number of criteria imposed by project clients for selecting contractors. For example, clients often request tenderers to satisfy various conditions such as tight programme, financial strength, managerial ability, relevant work experiences, technical strength, high workmanship standard, safety requirement, quality specification, and yet others. This trend has attracted research interests of devising various methods for helping project clients to assess contractors' bids. For example, in recent development, the Works Bureau of the Hong Kong Government has introduced two mechanisms in tender evaluation for various public work contracts, namely, the Marking Scheme effective from June 2002 and the Formula Approach effective from November 2002 [1], [2]. These approaches evaluate a contractor's tender by considering collectively its tender price and performance attributes, the latter including contractor experience, past performance, technical resources and technical content of his proposal. The tender with the highest combined price and performance score (CPPS) will be normally recommended for acceptance. It appears, however, that there is little existing research in helping contractors to identify a competition strategy that enables the contractor to offer his most competitive bid collectively taking into account his resource capacities and project client's multiple performance criteria. This paper examines the factors affecting contractor's competition strategy to compete for works in Hong Kong. The understanding about the factors will contribute to identifying effective competition strategy. The data used for the analysis were collected from Hong Kong construction industry. The research findings may provide valuable references for investigating effective competition strategies in other construction industries outside the region.

  • PDF

Sensor network key establishment mechanism depending on depending information (배치정보를 이용한 클러스터 기반 센서 네트워크 키 설정 메커니즘)

  • Doh In-Shil;Chae Ki-Joon;Kim Ho-Won
    • The KIPS Transactions:PartC
    • /
    • v.13C no.2 s.105
    • /
    • pp.195-202
    • /
    • 2006
  • For applying sensor networking technology for our daily life, security service is essential, and pairwise key establishment is the key point for security. In this paper, we propose fairwise key establishment mechanism for secure coumunication in sensor networks. In the mechanism, we cluster the network field before deployment and predistribute key materials to normal sensor nodes and clusterheads. For clusterheads, more key materials are predistributed, and after deployment, sensor nodes which need to establish pairwise keys with other sensor nodes in different clusters make request for related key materials to their own clusterheads. Our proposal reduces the memory requirements for normal sensor nodes by distributing more information to clusterheads, and it raises the security level and resilience against node captures. In addition, it guarantees perfect pairwise key establishments for every pair of neighboring nodes and provides efficient and secure sensor communications.

Analysis and Proposal of Communication System for Maritime HF Band Digital Data Exchange (해상 HF대역 디지털 데이터 교환을 위한 통신시스템 분석 및 제안)

  • Choi, Sung-Cheol;So, Ji-Eun;Park, Hyung-Chul
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.21 no.12
    • /
    • pp.2249-2260
    • /
    • 2017
  • IMO (International Maritime Organization) has been providing GMDSS (Global Maritime Distress and Safety System) and mandating to install distress and safety systems according to SOLAS. Digital-HF(High-Frequency) coast station communication system maintains interoperability between ship and coast station and digital data exchange in maritime mobile service by digitizing existing analog base voice communication. In this paper, we analyze ITU-R M. 1798-1 established by ITU for digital HF communications and propose Advanced annex2 and new Annex 5 to improve the problems of the existing Annex 2 and Annex 4. The proposed OFDM protocol basically adopts ARQ (Automatic Retransmission Request) which retransmits when an error occurs in a half-duplex manner between an information transmitting side (ISS) and an information receiving side (IRS) and we propose a digital HF communication system and its operational concept which is more reliable and superior than the existing ITU-R M. 1798 by implementing technical development on implementation and performance improvement.

Improvement of Concessionaire Designation Evaluation Criteria for Build-Transfer-Lease Private Participation in Infrastructure Projects (BTL사업의 사업시행자 선정 평가기준개선에 관한 연구)

  • Shin, Hyun-In;Park, Tae-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.121-131
    • /
    • 2006
  • Since "Act on Private Participation in Infrastructure" were changed in January 2005, BTL(Build-Transfer-Lease) projects of Private Participation In Infrastructure was introduced in the domestic construction market for the purpose of providing public facilities with the public. Selecting the most qualified Promoter should be considered discreetly in BTL projects because BTL projects is for projects with approximately thirty year project life cycle, plan, construction, operating, maintenance and obviously the success of the project totally depends on the capability and role of concessionaire. However, score for cost is likely to influence designating concessionaire to take the project. Accordingly, low bid contract with too much competition could decrease the quality of the construction plan and operating plan. Thus, this study did preliminary research and documents on problems of evaluation criteria for designating concessionaire in BTL projects, and proposed improvement program by doing questionnaire over specialists of each field.

The Proposal for the Execution KEC2005 (신인증기준 실시에 대한 제안)

  • Kang So-Yeon;Choi Keum-Jin;Hahm Seung-Yeon
    • Journal of Engineering Education Research
    • /
    • v.8 no.2
    • /
    • pp.52-63
    • /
    • 2005
  • The purpose of this study is to make proposals for the execution of KEC2005. Many universities have taken part in the accredited engineering education programs in order to solve points at issue and to provide world-standard engineering education. Accordingly, ABEEK carried out a research on accreditation criteria that suit Korean system and made an announcement of KEC2005 in 2004. Both accredited and planning-to-be-accredited universities experience difficulty in changing KEC2000 into KEC2005. Major proposals of this study are as follows: First, ABEEK should suggest required conditions of accreditation criteria and detailed examples of them. Second, model and methodology for achievement of outcomes should be presented. Third, practical evaluation should be carried out with professors' voluntary participation. fourth, re-education of engineering education programs evaluators should be carried out. Fifth, ABEEK need to provide an aggressive request for advice and accurate information to universities to be accredited engineering education programs.

A Study on the New RFP for the PMO-based Development of Next-Generation MIS (PMO 기반의 차세대 MIS개발을 위한 신RFP 작성 연구)

  • Han, Moonhee;Kim, Yousin;Kim, Dae Ho
    • Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology
    • /
    • v.6 no.11
    • /
    • pp.585-594
    • /
    • 2016
  • Information system development projects are increasingly enlarging in size and are becoming more complex in the development environment. The traditional approaches for the development of information system, however, haven't shown the expected performances in the management for them and many researchers have been trying to find a new approach for overcoming this challenges. And one of the new approaches is the PMO and it is introduced to solve the problems of project management and the related organizational, technical, and administrative problems. This study attempted to find the efficient information system establishment plan. In particular, this study wants to research the practicality of PMO and the detailed utilization plans. As a result, this study proposes the structure of project implementation, the requirements, the direction of the basic system design, the scope of system development, and the budgeting for the systems. It is expected to contribute the successful implementation of the project.