• Title/Summary/Keyword: Replacement cost approach

Search Result 46, Processing Time 0.025 seconds

A Market-Based Replacement Cost Approach to Technology Valuation (기술가치평가를 위한 시장대체원가 접근법)

  • Kang, Pilsung;Geum, Youngjung;Park, Hyun-Woo;Kim, Sang-Gook;Sung, Tae-Eung;Lee, Hakyeon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.41 no.2
    • /
    • pp.150-161
    • /
    • 2015
  • This paper proposes a new approach to technology valuation, the market-replacement cost approach which integrates the cost-based approach and market-based approach. The proposed approach estimates the market-replacement cost of a target technology using R&D costs of similar R&D projects previously conducted. Similar R&D projects are extracted from project database based on document similarity between project proposals and technology description of the target technology. R&D costs of similar R&D projects are adjusted by mirroring the rate of technological obsolescence and inflation. Market-replacement cost of the technology is then derived by calculating the weighted average of adjusted costs and similarity values of similar R&D projects. A case of "Prevention method and system for the diffusion of mobile malicious code" is presented to illustrate the proposed approach.

A Bayesian Approach to Replacement Policy with Extended Warranty (연장된 보증이 있는 교체정책에 대한 베이지안 접근)

  • Jung, Ki Mun
    • Journal of Applied Reliability
    • /
    • v.13 no.4
    • /
    • pp.229-239
    • /
    • 2013
  • This paper reports a manner to use a Bayesian approach to derive the optimal replacement policy. In order to produce a system with minimal repair warranty, a replacement model with the extended warranty is considered. Within the warranty period, the failed system is minimally repaired by the manufacturer at no cost to the end-user. The failure time is assumed to follow a Weibull distribution with unknown parameters. The expected cost rate per unit time, from the end-user's viewpoints, is induced by the Bayesian approach, and the optimal replacement policy to minimize the cost rate is proposed. Finally, a numerical example illustrating to derive the optimal replacement policy based on the Bayesian approach is described.

A Bayesian Approach to Replacement Policy Based on Cost and Downtime

  • Jung, Ki-Mun;Han, Sung-Sil
    • Journal of the Korean Data and Information Science Society
    • /
    • v.17 no.3
    • /
    • pp.743-752
    • /
    • 2006
  • This paper considers a Bayesian approach to replacement policy model with minimal repair. We use the criterion based on the expected cost and the expected downtime to determine the optimal replacement period. To do so, we obtain the expected cost rate per unit time and the expected downtime per unit time, respectively. When the failure time is Weibull distribution with uncertain parameters, a Bayesian approach is established to formally express and update the uncertain parameters for determining an optimal maintenance policy. Especially, the overall value function suggested by Jiagn and Ji(2002) is applied to obtain the optimal replacement period. The numerical examples are presented for illustrative purpose.

  • PDF

A Bayesian approach to maintenance strategy for non-renewing free replacement-repair warranty

  • Jung, K.M.
    • International Journal of Reliability and Applications
    • /
    • v.12 no.1
    • /
    • pp.41-48
    • /
    • 2011
  • This paper considers the maintenance model suggested by Jung and Park (2010) to adopt the Bayesian approach and obtain an optimal replacement policy following the expiration of NFRRW. As the criteria to determine the optimal maintenance period, we use the expected cost during the life cycle of the system. When the failure times are assumed to follow a Weibull distribution with unknown parameters, we propose an optimal maintenance policy based on the Bayesian approach. Also, we describe the revision of uncertainty about parameters in the light of data observed. Some numerical examples are presented for illustrative purpose.

  • PDF

A Bayesian approach to replacement policy following the expiration of non-renewing combination warranty based on cost and downtime (비재생혼합보증이 종료된 이후의 비용과 비가동시간에 근거한 교체정책에 대한 베이지안 접근)

  • Jung, Ki-Mun
    • Journal of the Korean Data and Information Science Society
    • /
    • v.21 no.5
    • /
    • pp.873-882
    • /
    • 2010
  • This paper considers a Bayesian approach to replacement policy following the expiration of non-renewing combination warranty. The non-renewing combination warranty is the combination of the non-renewing free replacement warranty and the non-renewing pro-rata replacement warranty. We use the criterion based on the expected cost and the expected downtime to determine the optimal replacement period. To do so, we obtain the expected cost rate per unit time and the expected downtime per unit time, respectively. When the failure times are assumed to follow a Weibull distribution with uncertain parameters, we propose the optimal replacement policy based on the Bayesian approach. The overall value function suggested by Jiang and Ji (2002) is utilized to determine the optimal replacement period. Also, the numerical examples are presented for illustrative purpose.

Optimal Replacement Scheduling of Water Pipelines

  • Ghobadi, Fatemeh;Kang, Doosun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.145-145
    • /
    • 2021
  • Water distribution networks (WDNs) are designed to satisfy water requirement of an urban community. One of the central issues in human history is providing sufficient quality and quantity of water through WDNs. A WDN consists of a great number of pipelines with different ages, lengths, materials, and sizes in varying degrees of deterioration. The available annual budget for rehabilitation of these infrastructures only covers part of the network; thus it is important to manage the limited budget in the most cost-effective manner. In this study, a novel pipe replacement scheduling approach is proposed in order to smooth the annual investment time series based on a life cycle cost assessment. The proposed approach is applied to a real WDN currently operating in South Korea. The proposed scheduling plan considers both the annual budget limitation and the optimum investment on pipes' useful life. A non-dominated sorting genetic algorithm is used to solve a multi-objective optimization problem. Three decision-making objectives, including the minimum imposed LCC of the network, the minimum standard deviation of annual cost, and the minimum average age of the network, are considered to find optimal pipe replacement planning over long-term time period. The results indicate that the proposed scheduling structure provides efficient and cost-effective rehabilitation management of water network with consistent annual budget.

  • PDF

Equipment replacement cost analysis within the construction industry

  • Oh, Hyun-Seung
    • Korean Management Science Review
    • /
    • v.8 no.1
    • /
    • pp.41-50
    • /
    • 1991
  • Within the current construction industry, constractor equipment management practices lack structure and often are not addressed through an economic analysis and evaluation process. This paper explores two areas...cost of capital and inflation...with the intention of providing insight for a more structured and economic based approach to contractor equipment replacement practices rather than by the traditional "rule of thumb".umb".uot;.

  • PDF

Cost Analysis on Warranty Policies Using Freund's Bivariate Exponential Distribution

  • Park, Minjae;Kim, Jae-Young
    • Journal of Korean Society for Quality Management
    • /
    • v.42 no.1
    • /
    • pp.1-14
    • /
    • 2014
  • Purpose: In this paper, the minimal repair-replacement warranty policy is used to carry out a warranty cost analysis with warranty servicing times and failure times that are statistically correlated to bivariate distributions. Methods: Based on the developed approach by Park and Pham (2012a), we investigate the property of the Freund's bivariate exponential distribution and obtain the number of warranty services using the field data to conduct the warranty cost analysis. Results: Maximum likelihood estimates are presented to estimate the parameters and the warranty model is investigated using a Freund's bivariate exponential distribution. A numerical example is discussed to deal with the applicability of the developed approach in the paper. Conclusion: A novel approach of analyzing the warranty cost is proposed for a product in which failure times and warranty servicing times are used simultaneously to investigate the eligibility of a warranty claim.

A Bayesian Approach to Optimal Replacement Policy for a Repairable System with Warranty Period

  • Jung, Gi-Mun;Han, Sung-Sil
    • Communications for Statistical Applications and Methods
    • /
    • v.9 no.1
    • /
    • pp.21-31
    • /
    • 2002
  • This paper considers a Bayesian approach to determine an optimal replacement policy for a repairable system with warranty period. The mathematical formula of the expected cost rate per unit time is obtained for two cases : RFRW(renewing free-replacement warranty) and RPRW(renewing pro-rata warranty). When the failure time is Weibull distribution with uncertain parameters, a Bayesian approach is established to formally express and update the uncertain parameters for determining an optimal replacement policy. Some numerical examples are presented for illustrative purpose.

Replacement Investment with Pallet Fuel System in Greenhouse Fruit and Vegetables (목재펠릿시스템의 대체투자 가능성 분석 - 시설과채 사례 -)

  • Kim, Seongsup;Kim, Taehoo;Seo, Sangtaek
    • Journal of Agricultural Extension & Community Development
    • /
    • v.25 no.3
    • /
    • pp.149-160
    • /
    • 2018
  • This study aimed to analyze the replacement investment of the diesel fuel system with the pallet fuel system in the Korean farming sector. Equivalent annual annuity approach was used to resolve a discrepancy of useful life in capital goods and to facilitate investment analyses in an independent perspective. Data was obtained from previous studies on economic analysis of greenhouse tomato, paprika and cucumber. Results showed that the replacement with the pallet fuel system was acceptable irrespective of the remaining period of useful life for the diesel fuel system. In addition, sensitivity analysis with government support level, repair cost, and light and heat energy cost show ed robustness in the possibility of replacement with the pallet fuel system while the speed of replacement was accelerated with an increase in the amount of diesel fuel used and price of diesel fuel, and a decrease in price of the pallet fuel. The result implied that the replacement investment rather than a new investment was appropriate for existing greenhouse farmers and the pallet fuel system was acceptable to replace existing diesel fuel system in producing greenhouse tomato, paprika and cucumber.