울진1,2호기 출력최적화 및 증기발생기 교체가 주급수 제어계통 안정도에 미치는 영향연구 (Research on a Stability of Feedwater Control System after Stretched Power Uprate and Replacement Steam Generator for Ulchin Units 1&2)

  • 윤덕주;김인환;이재용
    • 한국압력기기공학회 논문집
    • /
    • 제8권2호
    • /
    • pp.14-20
    • /
    • 2012
  • Full load rejection capability of nuclear power plant depends primarily on steam dump capacity (SDCAP) and steam generator level control capability. Recently, Ulchin Units 1&2 have performed stretched power uprate (SPU) and replacement steam generator (RSG) projects, which increase the power by 4.5 percent. They change major design or operating parameters and especially reduces steam dump capacity at full power due to increase of the steam flow. The reduction of SDC after SPU results in degradation of heat removal capability in full load rejection transients. Therefore, we should perform evaluation to determine whether reactor trips occur in large load rejection transients. Uchin Units 1&2 have experienced full load rejection (FLR) three times from 2004 to 2010. Operating data from the plant occurrence of FLR at Ulchin Units 1&2 showed that steam generator (SG) level transients were limiting in point of reactor trip. However the plant had never reached reactor trip in the FLR and successfully continued in house load operation. The parameters and setpoints for the SG will be changed if the SG is replaced. Therefore, we evaluated the appropriateness of steam dump, main feedwater and steam generator water level control system preventing the plant from reactor trip in case of FLR by the parameter sensitivity study whether SG water level operated smoothly after SPU and RSG projects.

신형경수로의 증기발생기 전열관 재질 Inconel-690 적용 (The Use of Inconel 690 as Tube Material For Advanced Pressurized Water Reactor Steam Generator)

  • 임혁순;정대율;변성철;이광한
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2003년도 춘계학술대회
    • /
    • pp.49-54
    • /
    • 2003
  • Most of the operating pressurized water reactors (PWRs)has chosen Inconel 600 as steam generator tubing. The long-term operation of steam generators showed that the use of this material induced localized corrosion damages. The current trend is using Inconel 690 as a tube material for the replacement steam generators. Based on the current trend, we have chosen Inconel 690 for the advanced Power Reactor 1400 (APR1400) steam generator tube material. In this paper, we examined the technical consideration in this modification: the effect of chemical composition, thermal conductivity, corrosion resistance and wear characteristics

  • PDF

증기터빈의 기동조건과 성능개선이 터빈의 진동에 미치는 영향 (Effect on Vibration of Start-up Condition and Retrofit of Steam Turbines)

  • 이혁순;정혁진;송우석
    • 한국압력기기공학회 논문집
    • /
    • 제7권3호
    • /
    • pp.1-7
    • /
    • 2011
  • The analysis shows that the vibration is one of the main reasons of turbine failure. Especially, the problems caused by vibration occur right after retrofit of the turbine-generator and restarting the turbine. Through the case study of high vibration caused by after the turbine trip and restart, turbine vibration was identified to be influenced by startup condition. Turbine startup at high casing temperature right after unscheduled turbine trip cause radial expansion in rotor by contraction in axial direction, while casing continues to contract by steam flowing into casing. Consequently, gap between rotor and casing decrease until to metal contact to cause high vibration. Through the case study of high vibration of turbine-generator system after generator retrofit, it was identified that generator replacement could cause high vibration in turbine-generator system if the influence of generator replacement on entire system was not considered properly. To prevent startup delay caused by high vibration, it is important to keep the gaps at the design standard and start the turbine after thermal equilibrium.

증기발생기 최적 교체시기 결정에 관한 연구 (Optimum Replacement Times for a Steam Generator)

  • 허정훈;윤원영
    • 산업공학
    • /
    • 제15권1호
    • /
    • pp.89-98
    • /
    • 2002
  • This paper considers the optimum replacement times of a steam generator in nuclear power plant with failure data. It is assumed that the failure pattern of units is given as a Weibull distribution and repair and periodic preventive maintenance are performed periodically. The maximum likelihood method is used to estimated the Weibull parameters of failure distribution from failure data. Relpacement, output-decresing and maintenance costs are considered to determine the optimal replacement times by simulation. Numerical examples are included with actual failure data and cost estimators.

월성 1호기 계속운전을 위한 증기발생기 열화관리 (Wolsong Unit 1 Steam Generator Aging Management for Continued Operation)

  • 송명호;김홍기;이정민
    • 한국압력기기공학회 논문집
    • /
    • 제6권2호
    • /
    • pp.28-33
    • /
    • 2010
  • As a part of license renewal for the continued operation of Wolsong unit 1, the periodic safety review report was submitted near the end of design lifetime, 2012, and now is under reviewing. Major components of primary system such as pressure tubes, feeder pipes and so on are being replaced and many components of secondary system are also being repaired. So the license renewal of Wolsong unit 1 is expected to be acquired without significant issues. But on the other hand, steam generators of Wolsong unit 1 had the good performance and therefore the replacement and repair for the steam generator are not needed. Recently it is reported that some cracks were detected in a few of european steam generator with Alloy 800 tubes and the cause of cracks was the outer diameter stress corrosion cracking(ODSCC) due to the concentration of chemical impurities on the outer surface of tube. Accordingly the overall review on this issue was performed. The long-term operation is likely to results to form the concentration mechanism for the tube corrosion as the sludge build-up in the secondary side of steam generator and the crack in the crevice between tube and tube-sheet and expansion transitions is apt to be occurred. In this paper, the history of steam generator inspection and operation of Wolsong unit 1 are reviewed and the reliability of steam generator tube is evaluated and the steam generator aging management program for Wolsong unit 1 is introduced.

  • PDF

한울 3호기 주급수 배관 용접부 육안검사 경험 (Experience in Visual Testing of the Main Feed Water Piping Weld for Hanul Unit 3)

  • 윤병식;문균영;김용식
    • 한국압력기기공학회 논문집
    • /
    • 제11권1호
    • /
    • pp.74-78
    • /
    • 2015
  • Nuclear power plant steam generator that is one of the main component has several thousands of thin tubes. And the steam generator tube is subject to damage because of the severe operation conditions such as the high temperature and pressure. Therefore periodic inspections are conducted to ensure the integrity of steam generator component. Hanul unit 3 also has been inspected in accordance with in-service inspection program and is scheduled to be replaced for exceeding the plugging rate which was recommended by manufacturer. During the steam generator replacement activity, we found several clustered porosity on inner surface of main feed water pipe. Additionally crack-like indications were found at weld interface between base material and weld of main feed water pipe. This paper describes the field experience and visual testing results for inner surface of main feed water pipes. The destructive test result had shown that these indications were porosities which were caused by manufacturing process not by operation service.

터빈 밸브시험 중 충동실 압력제어에 의한 발전기 출력변동 최소화 (The Minimization of Generator Output Variations by Impulse Chamber Pressure Control during Turbine Valve Test)

  • 최인규;김종안;박두용;우주희;신재호
    • 전기학회논문지
    • /
    • 제59권1호
    • /
    • pp.152-159
    • /
    • 2010
  • This paper describes the actual application of a feedback control loop as a means for minimizing turbine impulse chamber pressure variation during the turbine steam valve tests at a 1,000 MW nuclear power plant. The chamber pressure control loop was implemented in the new digital control system which was installed as a replacement for the old analog type control system. There has been about 40MW of the generator output change during the steam valve tests, especially the high pressure governing valve tests, because the old control system had not the impulse chamber pressure control so the operators had to compensate steam flow drop manually. The process of each valve test consists of a closing process and an reopening process and the operators can make sure that the valves are in their sound conditions by checking the valves movement. The control algorithm described in this paper contributed to keep the change in megawatt only to 6MW during the steam valve tests. Thereby, the disturbance to reactor control was reduced, and the overall plant control system's stability was greatly improved as well.

원전 종사자의 말단선량평가를 위한 고피폭 접촉 방사선장 특성분석 (An Analysis of Radiation Field Characteristics for Estimating the Extremity Dose in Nuclear Power Plants)

  • 김희근;공태영
    • Journal of Radiation Protection and Research
    • /
    • 제34권4호
    • /
    • pp.176-183
    • /
    • 2009
  • 원전 계획예방정비기간 증기발생기 수실작업 등은 매우 높은 방사선량율을 보이는 지역으로, 짧은 시간 동안 작업으로 종사자는 높은 피폭을 받을 가능성이 있다. 특히, 방사성물질과 접촉작업을 하는 손 부위에서 고피폭이 예상된다. 이런 점을 고려하여 2004년 수행된 국내 원전의 복수선량계 알고리즘 적용성 시험의 TLD 판독결과를 이용하여 고피폭 접촉 작업의 방사선장을 분석하였다. 그 결과, 원전 고피폭 접촉작업의 입사방사선장은 고에너지 광자(High Energy Photon Field)에 의한 피폭으로 해석되었다. 한편 2009년 울진 4호기 계획예방정비기간 S/G 정비작업과 월성 1호기 압력관 교체작업에 참여한 방사선작업종사자에 대해 말단선량 현황과 방사선장을 분석하기위한 현장시험을 실시하였다. 그 결과 입사방사선장은 고에너지 방사선장으로 확인되었다.