Two groups of esophagus graft were done in canine esophagus in 34 adult mongrel dogs. For the first group segmental replacement graft was done with fresh autologous pericardium tube, and for the second, patch graft was done utilizing fresh autologous pericardium, fresh homologous pericardium,and dacron piece. All eight dogs in the first segmental replacement graft group died 2 to 5 days after operation with severe empyema caused by anastomosis disruption. Among 26 patch graft dogs 2 died during operation and 7 died 13 to 18 days after operation. For the 17 long-term patch grafted survivors esophagography and postoperative weight check were done. Postoperative stool was collected and examined for dacron patch excretion. One, two, three, and four months postoperative long-term survivors were sacrificed to obtain specimens in each group respectively and the following observations were made.I. Survival; Autologous pericardium patch group showed no mortality but in homologous pericardium and dacron patch group only two thirds were long-term survivors. II. Postoperative swallowing; There was no case which demonstrated postoperative dysphagia. About half of the cases showed postoperative weight increase and in only 3 cases weight decrease followed operation. III. Dacron patch was excreted in the stool 8 to 23 days after operation. Animals which excreted dacron patch up to 9 days after operation all died of empyema due to anastomosis disruption.IV. Postoperative esophagogram; All esophagograms in each group showed no leakage of barium, no passage disturbances and no remarkable stenotic signs.V. Morphological findings; [A] Macroscopical findings; In one month group specimens of each group dense adhesion with surrounding structures was noted and luminal surface was smooth with contraction of the patched area. In two month groups anastomosis sutures were still exposed but patched area showed lesser abnormality. In three to four months groups sutures were covered completely and patched area showed only very slight signs of contraction. [B] Microscopic findings; In one month group luminal surface of the replaced tissue [transplanted tissue] showed almost complete epithelial covering that is composed of several layers of squamous cells with no evidence of keratinization. Basement membrane was also well distinct throughout. Slight to minimal inflammatory cells comprising of large mononuclears, lymphocytes and plasma cells were observed in the subepithelial fibrous stroma consisted entirely of loose fibrous tissue containing many newly formed capillaries and fibroblastic proliferation. Scattered suture granulomas were found, few of which became acutely inflamed. In two months group repairing process progressed with lesser degree of inflammatory cell infiltration and young capillary proliferation. Fibrous tissue was more matured showing even focal collagenization.Suture granuloma persisted but with lesser reactive changes. Epithelial covering was that of a mature non-keratinizing stratified squamous epithelium. In three and four months groups the replaced area showed essentially similar histological findings. However, subepithelial stroma still consisted entirely of connective tissue without evidence of smooth muscle regeneration. In this group, inflammatory cell infiltration was minimal or negligible. Among these patch materials autologous pericardium group showed the most satisfactory repairing process.The above mentioned results may signify the feasibility of autogenous pericardium patch graft in clinical esophageal surgery.
Two groups of esophagus graft were done in canine esophagus in 34 adult mongrel dogs. For the first group segmental replacement graft was done with fresh autologous pericardium tube, and for the second, patch graft was done utilizing fresh autologous pericardium, fresh homologous pericardium,and dacron piece. All eight dogs in the first segmental replacement graft group died 2 to 5 days after operation with severe empyema caused by anastomosis disruption. Among 26 patch graft dogs 2 died during operation and 7 died 13 to 18 days after operation. For the 17 long-term patch grafted survivors esophagography and postoperative weight check were done. Postoperative stool was collected and examined for dacron patch excretion. One, two, three, and four months postoperative long-term survivors were sacrificed to obtain specimens in each group respectively and the following observations were made. I. Survival; Autologous pericardium patch group showed no mortality but in homologous pericardium and dacron patch group only two thirds were long-term survivors. II. Postoperative swallowing; There was no case which demonstrated postoperative dysphagia. About half of the cases showed postoperative weight increase and in only 3 cases weight decrease followed operation. III. Dacron patch was excreted in the stool 8 to 23 days after operation. Animals which excreted dacron patch up to 9 days after operation all died of empyema due to anastomosis disruption. IV. Postoperative esophagogram; All esophagograms in each group showed no leakage of barium, no passage disturbances and no remarkable stenotic signs. V. Morphological findings; [A] Macroscopical findings; In one month group specimens of each group dense adhesion with surrounding structures was noted and luminal surface was smooth with contraction of the patched area. In two month groups anastomosis sutures were still exposed but patched area showed lesser abnormality. In three to four months groups sutures were covered completely and patched area showed only very slight signs of contraction. [B] Microscopic findings; In one month group luminal surface of the replaced tissue [transplanted tissue] showed almost complete epithelial covering that is composed of several layers of squamous cells with no evidence of keratinization. Basement membrane was also well distinct throughout. Slight to minimal inflammatory cells comprising of large mononuclears, lymphocytes and plasma cells were observed in the subepithelial fibrous stroma consisted entirely of loose fibrous tissue containing many newly formed capillaries and fibroblastic proliferation. Scattered suture granulomas were found, few of which became acutely inflamed. In two months group repairing process progressed with lesser degree of inflammatory cell infiltration and young capillary proliferation. Fibrous tissue was more matured showing even focal collagenization. Suture granuloma persisted but with lesser reactive changes. Epithelial covering was that of a mature non-keratinizing stratified squamous epithelium. In three and four months groups the replaced area showed essentially similar histological findings. However, subepithelial stroma still consisted entirely of connective tissue without evidence of smooth muscle regeneration. In this group, inflammatory cell infiltration was minimal or negligible. Among these patch materials autologous pericardium group showed the most satisfactory repairing process. The above mentioned results may signify the feasibility of autogenous pericardium patch graft in clinical esophageal surgery.
The purpose of this study was to investigate the effects of different types of orthodontic force on the root resorption and repair in rat molar. 77 rats were divided into three groups; The control group was not equiped with orthodontic appliance between incisor and first molar. The experimental group was subdivided into closed coil spring subgroup and elastic chain subgroup by the application methods of orthodontic force. Initial orthodontic force between incisor and first molar was 100g. Experimental period was 8 weeks; for 4 weeks the appliance was acting and for another 4 weeks, removed. Root resorption and repair in the root of first molar was examined by light microscope for histologic changes and by inductively coupled plasma spectroscopy(ICP) for quantitative changes. The results were as follows: 1. In the closed coil spring subgroup odontoclasts and root resolution were appeared one week earlier. 2. One week after orthodontic force was eliminated the repair response in the resorptive lacuna was seen in both subgroups. Delayed resorption was seen on the periphery of resorptive lacunae whereas reparative response was seen in the center of lacunae. A new resorption was seen one week after orthodontic force was eliminated. Root contour was partially restored by repairing of resorbed root. 3. The weight ratios of calcium and phosphorous to the sample were decreased during resorptive process but increased during repair process in both the orthodontic groups, but not more than the control group. 4. By different types of orthodontic force (closed coil spring or elastic chain) resorption process was affected but repair process was not.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.654-658
/
2006
To solve some problems that reveals in the exiting stickiness problem of the housetop, the housetop finishing impact layer can be displaced by the existing concrete block. By doing in this way, this need is rising that the excess cost should be reduced and the materials should be recycled in repairing. According to the above, this study is going to suggest the basic data on building and using of the dry process method by estimating and analyzing a overall determinate quantity through the experiment on the insulation performance among the capacity items on the outside insulation waterproof dry process suggested. In addition, choosing the building method according to the use, the peculiar property and the importance of the building can be possible by analyzing the defect causes happening in the rooftop insulation and waterproof, suggesting the better method and classifying the most proper choosing methods for the need of the building according to the importance of the main factors.
The directed energy deposition (DED) process of metal 3D printing technologies has been treated as an effective method for welding, repairing, and even 3-dimensional building of machinery parts. In this study, stainless steel 316L (STS316L) and Inconel 625 (IN625) alloy powders are additively manufactured using the DED process, and the microstructure of the fabricated STS316L/IN625 sample is investigated. In particular, there are no secondary phases in the interface between STS316L and the IN625 alloy. The EDS and Vickers hardness results clearly show compositionally and mechanically transient layers a few tens of micrometers in thickness. Interestingly, several cracks are only observed in the STS 316L rather than in the IN625 alloy near the interface. In addition, small-sized voids 200-400 nm in diameter that look like trapped pores are present in both materials. The cracks present near the interface are formed by tensile stress in STS316L caused by the difference in the CTE (coefficient of thermal expansion) between the two materials during the DED process. These results can provide fundamental information for the fabrication of machinery parts that require joining of two materials, such as valves.
This has been possible by integration techniques such as very large scale integration (VLSI) and wafer scale integration (WSI). Redundancy has been extensively used for manufacturing memory chips and to provide repair of these devices in the presence of faulty cells. If there are too many defects, the momory has to be rejected. But if there are a few defects, it will be more efficient and cost reducing for the company to use it by repairing. Therefore, laser-repair process is nedded for such a reason and redundancy analysis is needed to establish correct target of laser-repair process. The proposed CRA (Correlation Repair Algorithm) simulation, beyond the idea of the conventional redundancy analysis algorithm, aims at reducing the time spent in the process and strengthening cost competitiveness by performing redundancy analysis after simulating each case of defect.
Park, Sung-Man;Kim, Yang-Gil;Ham, Nam-Hyuk;Kim, Jae-Jun
Journal of KIBIM
/
v.13
no.1
/
pp.1-12
/
2023
The number of old buildings in Korea is increasing. According to a report from the Ministry of Land, Infrastructure and Transport, the proportion of old buildings increased from 29.0% in 2005 to 37.8% in 2009. However, the ratio of repairs to improve usability and improve the environment through problem improvement The proportion of old buildings was 72% in 2010, but decreased to 38% in 2020 and does not exceed 40%. The reason is that the difficulty of remodeling old buildings is more difficult than repairing new ones, and business estimates are difficult to predict. Accurately reflecting the current condition of a building in a repair project has a huge impact on time and budget. Accurate and detailed measurements are essential. Current repair methodologies require a lot of manpower, time and money to remodel an old building. Therefore, it is necessary to improve the remodeling methodology applied in the field. In this study proposed a Digital-Twin-based remodeling process that introduced various digital technologies such as 3D Scanning, BIM, Reverse Engineering, and Digital Fabrictation in consideration of the latest technologies used in recent construction projects. In addition, the process proposed in this study was applied to an actual small-scale building remodeling project and the results were analyzed. In addition, useful basic data were provided for the establishment of plans related to the repair process of buildings in the future.
The Journal of Sustainable Design and Educational Environment Research
/
v.16
no.2
/
pp.1-9
/
2017
Defect dispute in apartment building has become a debating social issue. The system of defect lawsuit and the conciliation process are applicable to solve defect problems in South Korea. Among various defects, painting work defect is a critical issue because it requires large area works and entails a lot of cost. Accordingly, disputes on work procedure and cost calculation are argued oftenly between residents and housing providers. This study reviewed detailed main issues of painting work and propose relevant systems and standards. In this analysis, the main issues are categorized into pre-works, main work, and others. The most recent cases are compared and analyzed for each issue. After the analysis, following conclusions are obtained, (1) In defect lawsuit system, even though surface treatment work in pre-work step is part of main work, it has been separated and regarded as a separate work. (2) Although the main painting work are not significantly different from two systems, it is still necessary to achieve a consensus to close the gap in the methodology of painting area calculation and determining whole painting or partial painting. (3) In addition, unlike the profit rate of general construction works, that of painting work remained the maximum rate and additional charge rate for works carried out in higher place are different among cases. Therefore, it is determined that establishing consistent standards is urgent.
Recently, the concerning about cultural heritages has been increased. As a result, the protection, repairing and restoration of cultural assets have been actively in progress. The biggest project of cultural asset reconstructions is the restoration of Kyungbok Palace and it has been in proceed step by step since in 1989. The actual sizes of these traditional buildings have been measured and recorded for future maintenance. In this paper, the 3D computer graphic technique is used to help understanding the inner structures of the traditional buildings as well as their construction processes. In other word, the construction simulation of Keunjeongjun which is the center building of Kyungbok Palace have been produced using 3D computer graphic techniques. The purpose of this project is aiding people in understanding the process of traditional palace architecture in Korea.
In Korea Gas Corporation, as one of the pipeline repairing methods, damaged pipelines are sometimes treated with a temporally employment of split sleeve. On conducting the repair process, circumferential fillet and longitudinal groove welding usually must be included. For the case of groove welding, a considerable amount of R&D have been carried out related to property changes, while few study on the property change in fillet welding has been conducted. In this paper, so as to confirm the specification of fillet welding in terms of safety and reliability, properties changed by fillet welding were investigated for two welding processes. Qualifying tests such as reviewing macrostructure and nick-break tests were performed according to API 1104 and ASME section IX. In addition, tensile properties and hardness were evaluated according to KS B0841 and BS 4515. The fillet weld prepared by the qualified procedure showed melting depth of 0.8∼1.3mm and heat affected zone of 2.8∼3.4mm length. No crack and lack of penetration were observed. And the results of hardness and nick-break tests satisfied code requirements. The area crossed by fillet and groove welding line was found to have minimal tensile strength.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.