• Title/Summary/Keyword: Repair Cost

Search Result 689, Processing Time 0.024 seconds

Development of Rehabilitation and Management Techniques for Old Water Distribution Systems (기존 상수도 노후관망의 개량 및 관리 기법의 개발)

  • 김중훈;김종우
    • Water for future
    • /
    • v.29 no.3
    • /
    • pp.197-205
    • /
    • 1996
  • Flow carrying capacity of water distribution systems is getting reduced by deterioration of pipes in the systems. The objective of this study is to develop a managerial decision-making model for the rehabilitation of water distribution systems with a minimum cost. The decisions made by the model also satisfy the requirements for the discharge and pressure at demanding nodes in the system. The replacement cost, pipe break repair cost, and pumping cost are considered in the economic evaluation of the decision along with the break ratio and interest ratio to determine the optimal replacement time for each pipe. Then, the hydraulic integrity of the water distribution system is checked for the decision by a pipe network simulator, KYPIPE, if the discharge and pressure requirements, the decision made for the optimal replacement time is revised until the requirements are satisfied. The model is applied to an existing water distribution system, the Metropolita Water Supply Project (1st Phase). The result shows that the decisions for the replacement time determined by the economix analysis are accepted as optimal and the hydraulic integrity of the system is in good condition.

  • PDF

The Life Cycle Cost Optimization Methodology as a Tool for Designing Apartment Units (공동주택 단위세대의 생애 비용 최적화 방법론 연구)

  • Park Tae Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.1 s.1
    • /
    • pp.80-86
    • /
    • 2000
  • The future costs of energy and the cost of the repair of apartment buildings are expected to rise continuously in proportion to the initial costs. Therefore it has become important for these increasing costs to be incorporated and reflected in the design of the building. Systems such as structure and services for the buildings remain constant, but a number of the walls and windows can vary and thus have a major influence on the total construction and running costs of a building. The critical factor in the apartment unit design for the optimization of life cycle cost (LCC) is the ratio of the x and y axis of the walls in the unit plan. This paper demonstrates how to achieve the optimal size and thus optimize the LCC of the building.

  • PDF

A Condition Rating Method of Bridges using an Artificial Neural Network Model (인공신경망모델을 이용한 교량의 상태평가)

  • Oh, Soon-Taek;Lee, Dong-Jun;Lee, Jae-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.1
    • /
    • pp.71-77
    • /
    • 2010
  • It is increasing annually that the cost for bridge Maintenance Repair & Rehabilitation (MR&R) in developed countries. Based on Intelligent Technology, Bridge Management System (BMS) is developed for optimization of Life Cycle Cost (LCC) and reliability to predict long-term bridge deteriorations. However, such data are very limited amongst all the known bridge agencies, making it difficult to reliably predict future structural performances. To alleviate this problem, an Artificial Neural Network (ANN) based Backward Prediction Model (BPM) for generating missing historical condition ratings has been developed. Its reliability has been verified using existing condition ratings from the Maryland Department of Transportation, USA. The function of the BPM is to establish the correlations between the known condition ratings and such non-bridge factors as climate and traffic volumes, which can then be used to obtain the bridge condition ratings of the missing years. Since the non-bridge factors used in the BPM can influence the variation of the bridge condition ratings, well-selected non-bridge factors are critical for the BPM to function effectively based on the minimized discrepancy rate between the BPM prediction result and existing data (deck; 6.68%, superstructure; 6.61%, substructure; 7.52%). This research is on the generation of usable historical data using Artificial Intelligence techniques to reliably predict future bridge deterioration. The outcomes (Long-term Bridge deterioration Prediction) will help bridge authorities to effectively plan maintenance strategies for obtaining the maximum benefit with limited funds.

A Methodology of Seismic Damage Assessment Using Capacity Spectrum Method (능력 스펙트럼법을 이용한 건물 지진 손실 평가 방법)

  • Byeon, Ji-Seok
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.9 no.3 s.43
    • /
    • pp.1-8
    • /
    • 2005
  • This paper describes a new objective methodology of seismic building damage assessment which is called Advanced Component Method(ACM). ACM is a major attempt to replace the conventional loss estimation procedure, which is based on subjective measures and the opinions of experts, with one that objectively measures both earthquake intensity and the response ol buildings. First, response of typical buildings is obtained analytically by nonlinear seismic static analysis, push-over analyses. The spectral displacement Is used as a measure of earthquake intensity in order to use Capacity Spectrum Method and the damage functions for each building component, both structural and non-structural, are developed as a function of component deformation. Examples of components Include columns, beams, floors, partitions, glazing, etc. A repair/replacement cost model is developed that maps the physical damage to monetary damage for each component. Finally, building response, component damage functions, and cost model were combined probabilistically, using Wonte Carlo simulation techniques, to develop the final damage functions for each building type. Uncertainties in building response resulting from variability in material properties and load assumptions were incorporated in the Latin Hypercube sampling technique. The paper also presents and compares ACM and conventional building loss estimation based on historical damage data and reported loss data.

Comparison of Construction Cost Applied by RC and PC Construction Method for Apartment House and Establishment of OSC Economic Analysis Framework (공동주택 RC 및 PC공법 적용 공사비 비교 및 OSC의 포괄적 경제성 분석 프레임워크 구축)

  • Yun, Won-Gun;Bae, Byung-Yun;Kang, Tai-Kyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.30-42
    • /
    • 2022
  • OSC is a type of supply chain and value chain that spans the entire process of construction production (planning, design, construction, maintenance, etc.). It is a method of producing the final object by manufacturing it in a factory, transporting it to the site, installing and construction. This research as is the construction cost was compared for each case A, which applied the PC method, and case B, which applied the RC method. In the case of applying the PC method (excluding the PC design cost), compared to the case where only the RC method was applied, the frame construction cost per unit quantity (m3) increased by about 70% (50% based on the total RC construction type). Of the total frame construction cost of PC method application, PC accounted for 90.2%, 'PC manufacturing cost' 54.8%, 'PC assembly cost' 28.5%, and 'transportation cost' accounted for 6.89%. Also a decision-making framework that can consider both costs and benefits was established. In the case of benefits, the construction period, defect repair, disaster occurrence, energy efficiency, noise/dust/waste, and greenhouse gas emission indicators reflecting OSC technical advantages were presented. It can contribute to providing a basis for helping decision-making on the introduction of PC apartment houses using OSC.

Follow-up Maintenance System Development for the Forest Erosion Control Structures (산지사방공작물(山地砂防工作物)의 사후관리기술체계설정(事後管理技術體系設定)을 위한 조사연구(調査硏究))

  • Woo, Bo Myeong;Lee, Don Koo
    • Journal of Korean Society of Forest Science
    • /
    • v.76 no.2
    • /
    • pp.145-160
    • /
    • 1987
  • To evaluate damage status and necessities of repair works on the forest-side erosion control structures constructed from 1966 to 1986 in Korea, developmental procedures of erosion control structures from the standard unit-cost tables established by the Forestry Administration every year, existing counter-measures for disaster erosion control system administrated by the government organization and existing status of each structure at constructed site were investigated and analyzed integrally. About 10-15% of the constructed forest erosion control structures were required to be repaired as a result of the investigation. It is actually incapable of repairing the damaged forest erosion control structures caused by excessive run-off and floodings under the existing forest-side erosion control systems. Therefore, it is necessary to put regularly repair erosion control system that will be secured by national budgetary pre-allocation system. Especially, it is also necessary to frame a new system that repair erosion control works by national budget (central government) should be possible for any scale of damages in case of the erosion control projects for the disaster counter-measures. The results of this research could be adopted as important policy data for erosion control policy-making in forest-side in Korea.

  • PDF

A Practical Method for Predicting Initial Maintenance Time To Repair (MTTR) Using Maintenance Complexity in Equipment Design (장비 설계 시 정비복잡도를 활용한 현실적인 초기 정비시간 및 정비도(MTTR) 예측방법)

  • Shin, Sang-Hee;Lee, Hak-Jae;Hwang, Seong-Guk;Kim, Moo-Young;Kwon, Ki-Sang
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.9
    • /
    • pp.247-254
    • /
    • 2019
  • Recently, in designing military equipment, considerable attention has been paid to maintaining operations, including reliability, maintenance, and maintenance time of equipment, from the early stages of development. Therefore, both users and developers stress the importance of design considering the maintenance time. This study evaluated the specific methodologies for predicting the realistic maintenance time, such as the access complexity of equipment, other than the standard maintenance time provided by the conventional method mil-hdbk-470a at the beginning of the design, and applied the time conversion factor using a measure of the maintenance complexity. In addition, the actual maintenance time reflecting the actual maintenance time of the developed equipment and the time-conversion factor applied was compared/verified to confirm the reliability of the data. In a study to set a target for repair and the repair of equipment design in the future, it is expected that the maintenance time of equipment that fails to measure the maintenance time for the initial actual equipment will be reflected as a more realistic time. Moreover, activities, such as research and design reflection activities, will be performed to reduce the maintenance time, operational maintenance cost, etc.

Proposing provisions of Standard Repair Method of Painting Work Defect by Lawsuit Case Study

  • Seo, Deokseok
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.16 no.2
    • /
    • pp.1-9
    • /
    • 2017
  • Defect dispute in apartment building has become a debating social issue. The system of defect lawsuit and the conciliation process are applicable to solve defect problems in South Korea. Among various defects, painting work defect is a critical issue because it requires large area works and entails a lot of cost. Accordingly, disputes on work procedure and cost calculation are argued oftenly between residents and housing providers. This study reviewed detailed main issues of painting work and propose relevant systems and standards. In this analysis, the main issues are categorized into pre-works, main work, and others. The most recent cases are compared and analyzed for each issue. After the analysis, following conclusions are obtained, (1) In defect lawsuit system, even though surface treatment work in pre-work step is part of main work, it has been separated and regarded as a separate work. (2) Although the main painting work are not significantly different from two systems, it is still necessary to achieve a consensus to close the gap in the methodology of painting area calculation and determining whole painting or partial painting. (3) In addition, unlike the profit rate of general construction works, that of painting work remained the maximum rate and additional charge rate for works carried out in higher place are different among cases. Therefore, it is determined that establishing consistent standards is urgent.

A Design of Press Die Components by Use of 3D CAD Library (3차원 CAD라이브러리를 이용한 프레스 금형 부품의 설계)

  • Park C. H.;Lee S. S.
    • Korean Journal of Computational Design and Engineering
    • /
    • v.9 no.4
    • /
    • pp.373-381
    • /
    • 2004
  • Using standard components of a press die is recognized as a way for a cost reduction and a short lead time. It also provides a way for a quick maintenance of a die under repair. It is expected to contribute to integration of CAD/CAM system for manufacturing dies in the future. This paper presents a 3D CAD library which is constructed using the standard components and is used for designing a press die. This 3D CAD library is generated by a database system made of Microsoft Access for standard components and by CATIA V5 R10 API for geometric features. The library is implemented using Visual Basic 6.0 utility of CATIA API function in the Windows NT environment. It creates a 3D model of the standard components of press die easily when a die designer inputs numerical values of geometric features and the BOM of the completely assembled parts. It also generates automatically the assembly drawing of die set by using variables for standard values of die parts. Therefore users can save the cost of time to design the press die components, and even a beginner can use this program with ease. The test results of the 3D CAD library for designing shearing and bending dies verify its usefulness and feasibility.

Two stage maintenance policy under non-renewing warranty (비재생보증 하에서의 이단계 보전정책)

  • Jung, Ki Mun
    • Journal of the Korean Data and Information Science Society
    • /
    • v.27 no.6
    • /
    • pp.1557-1564
    • /
    • 2016
  • Recently, an extended warranty of a system following the expiration of the basic warranty is becoming increasingly popular to the user. In this respect, we suggest a two stage maintenance policy under the non-renewing warranty from the user's point of view in this paper. In the first stage, the user has to decide whether or not to purchase the extended warranty period. And, in the second stage, the optimal replacement period following the expiration of the warranty is determined. Under the extended warranty, the failed system is minimally repaired by the manufacturer at no cost to the user. We utilize the expected cost from the user's perspective to determine the optimal two stage maintenance policy. Finally, a few numerical examples are given for illustrative purpose.