• Title/Summary/Keyword: Repair Cost

Search Result 689, Processing Time 0.023 seconds

A Study on the End of Defects Liability Exit Procedure in Apartment Buildings through Case Studies (사례분석을 통한 공동주택 하자담보책임 종료 절차연구)

  • Kim, Jin-kuk;Bang, Hong-Soon;Choi, Byung-Ju;kim, Ok-Kyue
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.10
    • /
    • pp.25-32
    • /
    • 2018
  • The ending of the warranty under the current Multi-Housing Management Act has a lot of problem as it is very disadvantageous to the business entity and it makes hard for the contractor to finish the repair work. It is almost none for the business entity to get the written confirmation of the expiration of warranty liability from the client even though it sincerely completed their warranty obligation. It is because the client asks for the works other than fair repair arising from the defect in the work, such as the upgrade work for the enhancement of the value of their assets and the repair work which the client should take care before it issues the written confirmation of the expiration of warranty liability to the contractor. "So, though there is the law specifying this matter, the parties are relying on the unnecessary civil agreement. This leads to the big social and economic losses. If there is no agreement made between the client and the contractor, that leads to the legal dispute. This research on cases of 10 apartments shows that the types of works which the apartment residents ask for depend on the characteristics and conditions of the apartments and that they ask for various kinds of compensational works. In addition, it was found that there were many cases in which even the civil agreement is not recognized as the ending of the warranty obligation even if the proper procedure is taken for the ending of warranty by the contractor or business entity. If the collateral is to be offered to the client, the contractor would get more hard because there is the additional cost other than the warranty obligation, thus damaging the legal objective of the laws trying to minimize the damage made to the resident of the apartments. It means that the increase in the unnecessary warranty cost would lead to the increase in the selling price of apartment and the ending of the dispute through the civil procedure would make the Multi-Housing Act ineffective.

A Study on Distribution System Assessment and Interruption Cost Calculation for the Industry Load by the Analytic Approach Method (해석적방법론에 의한 산업용 수용가의 공급지장비 산정 및 배전계통에의 적용)

  • Kim, Yong-Ha;Woo, Sung-Min;Baek, Byum-Min;Sin, Hyung-Chul;Park, Chang-Kyu
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.23 no.4
    • /
    • pp.47-55
    • /
    • 2009
  • This paper estimates interruption cost assessment for industrial load. For executing In this way first, we research customer interruption cost(CIC) for industrial load about 1,026 unit. And to assess industrial load in D/L calculate sector customer damage function(SCDF) using CIC. Second, we compute distribution reliability through annual failure rate, repair time and so on, and then, Third, distribution system that calculate VBDRA for industrial load per alternative assesses interruption cost.

A Study on the Life Cycle Cost Analysis of Light Railroad Transit Bridges (경량전철 교량의 생애주기비용 분석에 관한 연구)

  • Lee, Du-Heon;Kim, Kyoon-Tai;An, Dong-Geun;Jun, Jin-Taek;Han, Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.384-389
    • /
    • 2006
  • The needs for Light Railroad Transit(LRT) have been increased due to the heavy traffic congestions in large cities like Seoul, Korea. Korean government is seeking the LRT system development (including planning, designing, construction, and maintenance and operations) in terms of public-private-partnership (PPP). At the private sector side, it is crucial to estimate the life cycle cost (LCC) to project the cash flow during the O&M period. Since the most construction and O&M cost of LRT project is at the bridge construction, a cost analysis model and a cost breakdown structures (CBS) on LRT bridges are discussed through in depth literature reviews. Construction and maintenance cost of bridges are collected and analyzed. LCC is analyzed by types of bridge superstructures and historical data of repair and rehabilitation (R&R) is investigated. There have been scarce number of LCC analysis on railway bridges. This research delivers a well-defined CBS and maintenance cost data, which will be a great benefit to the systematic maintenance strategy development for railroad bridges.

  • PDF

A Study on the Status of Contract Managed Hospital Food Services (병원급식 위탁관리의 운영 실태조사)

  • Kim, Jin-Su;Yang, Il-Seon;Kim, Hyeon-A;Park, Mun-Gyeong;Park, Su-Yeon
    • Journal of the Korean Dietetic Association
    • /
    • v.9 no.2
    • /
    • pp.128-137
    • /
    • 2003
  • The purposes of this study were to investigate the current status of contracted hospital food services and to find out the difference in accordance with the number of beds in hospitals. Thirty six hospitals having more than 100beds in Seoul, Inchon and Kyungkido were the subjects of this study. Data was collected through surveys. The survey was conducted during March and April in 2002. The Questionnaires were mailed to the 36 directors of dietetic departments of the hospitals and 36 managers of contracting patient food services. Statistical analysis was completed using SPSS Win(11.0) for descriptive analysis and t-test. The results of the study are summerized as follows; Ⅰ. Hospital perspective : The range covered by contract food service was 63.3% and 36.7% in hospital food services, and medical nutrition services. The patient and employee food services were in 83.3%, and patient food services were in 6.7%. The methods selecting contractors are general, limited, selected and competitive biddings, and private contracts. The responsibility for supervision of contract food services was the dietetic department (51.7%) in most cases. Hospitals having personnel responsible for contracting affairs were in 75.9% of the cases and 24.1% did not have personnel. The biggest reason for contracting was facilitation of personnel management. The most important criteria on selecting food services contractors was the professionality of the contractor. Ⅱ. Contractor's perspective : The cost per meal in the year 2001 was composed of 1,905 won for food cost, 1,081 won for labor cost, 222 won for expenses, 114 won for VAT, 14 won for rent and 146 won for miscellaneous or controllable expense, representing 109 won loss per meal. The profit-and-loss contract cost is higher than the fee-contract cost. The ratios of food cost, labor cost and expenses are higher and the ratios of miscellaneous or controllable expense, VAT, rent and profit are lower in hospitals with more than 400 beds compared with those less than 400 beds. However, no significant differences are present between these two groups of hospitals. The actual contract period was 2.2 years upon initial contract and 1.2 years upon renewal. The initial investment cost was 53 million won and the cost of renovation and repair was 8.5 million won. Significant differences were present between two groups of hospitals. The conditions of employment and number of personnel hired by contractors for contract patient food services were significantly different according to the number of beds.

  • PDF

Estimation and Adjustment Model Considering Time Value of Money for Long-Term Maintenance Cost of Apartment House (시간적 가치를 고려한 공동주택 장기수선충당금 산정 및 조정 모델)

  • Koo, Seonkeun;Kim, Jonghyeob;Jun, Inyeong;Kim, Yeongjin;Yoon, Yousang;Hyun, Changtaek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.12-21
    • /
    • 2017
  • From 1960, the government decided to build apartment houses on a large scale in order to resolve the rising housing problems. However, the maintenance issues that have arisen from the deterioration of housing has not received adequate attention. The policy focuses only on the supply of housing. By passing new laws, the durable period during which buildings allowed reconstruction was increased, and long term maintenance plans were treated as important issues. The government was then obligated to establish certain long term maintenance plans and costs by legislating a Housing Act and requiring it be adjusted every three years. However, when planning long-term repair costs, doing so without considering the time value of money would become a problem. In addition, if differences between the planned repair costs and actual costs occur, it becomes necessary to adjust the long-term repair costs but, as of yet, the criteria to adjust such things does not exist. For these reasons, if there is lack of money to execute large-scale repair work, a building is unlikely to respond to deterioration of housing; on the other hand, an unnecessary reserve or pool of money can lead to conflict among residents. Therefore, this paper will propose estimation and adjustment models considering the time value of money for long term maintenance costs of apartment houses.

Experimental Performance Evaluation of Steel Mesh as Maintenance and Reinforcement Materials (Steel Mesh Cement Mortar의 보수⋅보강 성능 평가)

  • Kim, Yeon-Sang;Choi, Seung-Jai;Kim, Jang-Ho Jay
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.18 no.4
    • /
    • pp.50-58
    • /
    • 2014
  • Due to the cost burden of new construction, the necessity of repair and retrofitting of aged structures is sharply increasing as the domain of repair and retrofitting construction is expanding. Because of the necessity, new technologies for repair and retrofitting are continuously studied in Korea and foreign countries. Steel adhesive method, fiber reinforced plastic (FRP) surface adhesive method, and external prestressing method are used to perform the repair and retrofitting works in Korea. In order to consider a repair method using steel mesh reinforced cement mortar (SMCM), 3-point flexural member test was conducted considering repair area and layer number of SMCM. Five types of specimens including ordinary reinforced concrete (RC) specimen with dimensions of $1400{\times}500{\times}200$ (mm) were cast for testing the deflection measurement, a LVDT was installed at the top center of the specimens. Also, a steel strain gauge and a concrete strain gauge were placed at the center of the specimens. A steel strain gauge was also installed on the shear reinforcement. The 3 point flexural member test results showed that the maximum load of SMCM reinforced specimen was higher than that of basic RC specimen in all of the load-displacement curves. Also, the results showed that, when the whole lower part of the basic RC specimen was reinforced, the maximum load and strain were 1.18 and 1.37 times higher than that of the basic RC specimen, respectively. Each specimen showed a slightly different failure behavior where the difference of the results was caused by the difference in the adhesive level between SMCM and RC. Particularly, in SM-B1 specimen, SMCM spalled off during the experiment. This failure behavior showed that the adhesive performance for RC must be improved in order to utilize SMCM as repair and retrofitting material.

Operaton Cost Model for Feed Production (배합사료 공장의 작동비용 모델)

  • Park, Kyung Kyoo;Chung, Do Sup;Charles, Deyoe
    • Journal of Biosystems Engineering
    • /
    • v.10 no.1
    • /
    • pp.69-75
    • /
    • 1985
  • For the purpose of estimating the operating cost for feed production, energy consumption, labor requirement, maintenance cost, and supplies and miscellaneous costs are analyzed and developed as mathematical models. Mathematical model for energy usage Consists of electrical energy, boiler fuel energy and vehicle fuel energy. The mathematil model for electrical energy usage for the swine and poultry feed mill and the complete pelleted feed mill are developed, based on the general model mill and the computer program for its design developed in Kansas State University (Park, 1982). Also, the boiler fuel energy consumption model and the vehicle fuel energy consumption model are developed by analyzing the boiler system and the vehicle operation in the warehouse. In order to develop a mathematical model for labor requirement, the data that Vosloh (1968, 1976) constructed for labor requirement in his model mill are used by assuming that his model mill is similar to this model, in terms of labor assignment standards. Maintenance and repair costs are obtained by assuming to be 5.5% of the total capital investment cost. Also, supplies and miscellaneous costs are estimated by using Vosloh's report and it is approximately 0.87 dollars per ton based on daily production.

  • PDF

Economic Feasibility Study for Commercial Production of Bio-hydrogen (해양바이오수소개발 사업의 상업생산을 위한 예비경제성평가)

  • Park, Se-Hun;Yoo, Young-Don;Kang, Sung Gyun
    • Ocean and Polar Research
    • /
    • v.38 no.3
    • /
    • pp.225-234
    • /
    • 2016
  • This project sought to conduct an economic feasibility study regarding the commercial production of bio-hydrogen by the marine hyperthermophilic archaeon, Thermococcus onnurineus NA1 using carbon monoxide-containing industrial off-gas. We carried out the economic evaluation of the bio-hydrogen production process using the raw material of steel mill by-product gas. The process parameter was as follows: $H_2$ production rate was 5.6 L/L/h; the conversion of carbon monoxide was 60.7%. This project established an evaluation criterion for about 10,000 tonne/year. Inflation factors were considered as 3%. The operating costs were recalculated based on prices in 2014. The total investment required for development was covered 30% by capital and 70% by a loan. The operation cost for the 0.5-year test and integration, and the cost for the first three months in the 50% production period were considered as the working capital in the cost estimation. The costs required for the rental of office space, facilities, and other related costs from the construction through to full-scale production periods were considered as continuing expenses. Materials, energy, waste disposal and other charges were considered as the operating cost of the development system. Depreciation, tax, maintenance and repair, insurance, labor, interest rate charges, general and administrative costs, lubrication and miscellaneous expenses were also calculated. The hydrogen price was set at US$ 4.15/kg for the economic evaluation. As a result, the process was considered to be economical with the payback period of 6.3 years, NPV of 18 billion Won and IRR of 26.7%.

Economic Analysis of Optical Communication Control System in High Voltage Magnetizer (고전압 착자기에서의 누전 사고 방지를 위한 광통신 제어시스템의 도입 방안과 경제성 분석)

  • Bae, Young Woo;Kim, Wooju;Hong, June Seok
    • Journal of Information Technology Applications and Management
    • /
    • v.26 no.6
    • /
    • pp.103-117
    • /
    • 2019
  • Demand for high power motors is rapidly increasing as the 4th industry and convergence technology has recently emerged. In order to produce high-strength permanent magnets, the magnets used for magnetization have been increased from DC 300V in the 1970s to DC 2.5kV in the 2010s, Up to DC 10kV in the 2030s, It is expected that higher voltage will be used to magnetize. However, in the case of a magnetizer using an existing electric signal control device, it is necessary to use a control device with a high-voltage insulation function in case a high voltage used for magnetization is leaked to the control device. If a short circuit accident occurs, the controller must be shut down and serious problems such as excessive repair costs arise. In this study, a control system adopting optical communication method instead of electric signal control method is proposed to prevent leakage currents in high-voltage magnetizer. We design a transmitter(Tx) and a receiver(Rx) device for the optical communication control device and implemented a prototype connecting the optical cable. In order to demonstrate the utility of high-voltage magnetizer using the optical communication control device, we analyzed the initial cost and the yearly cost for the years to analyze the net present value. As a result, In the case of the low-voltage magnetizer, the electric signal control method cost less, As the operating voltage of the magnetizer becomes higher. It is confirmed that it takes less cost when the optical communication control device is used.

A Study on Cost Benefit Analysis Optimization Model for Water Distribution Network Rehabilitation Project of Taebaek Region (태백권 배수관망 개량사업의 비용효과분석 최적화 모델 연구)

  • Kim, Taegon;Choi, Taeho;Kim, Kyoungpil;Koo, Jayong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.29 no.3
    • /
    • pp.395-406
    • /
    • 2015
  • This research carried out an analysis on input cost and leakage reduction effect by leakage reduction method, focusing on the project for establishing an optimal water pipe network management system in the Taebaek region, which has been executed annually since 2009. Based on the result, optimal cost-benefit analysis models for water distribution network rehabilitation project were developed using DEA(data envelopment analysis) and multiple regression analysis, which have been widely utilized for efficiency analysis in public and other projects. DEA and multiple regression analysis were carried out by applying 4 analytical methods involving different ratios and costs. The result showed that the models involving the analytical methods 2 and 4 were of low significance (which therefore were excluded), and only the models involving the analytical methods 1 and 3 were suitable. From the result it was judged that the leakage management method to be executed with the highest priority for the improvement of revenue water ratio was installation of pressure reduction valve, followed by replacement of water distribution pipe, replacement of water supply pipe, and then leakage detection and repair; and that the execution of leakage management methods in this order would be most economical. In addition, replacement of water meter was also shown to be necessary in case there were a large number of defective water meters.