• Title/Summary/Keyword: Repair Cost

Search Result 689, Processing Time 0.028 seconds

The development of the level of repair analysis model with muti-indenture equipment structure (다단계 (multi-indenture) 구조를 갖는 장비의 수리수준 분석 모형 개발)

  • Yun, Won-Yeong;Kim, Gwi-Rae;Lee, Yu-Mi;Jeong, Il-Han;Park, Sam-Jun
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 2006.11a
    • /
    • pp.145-150
    • /
    • 2006
  • In terms of that modem equipment become expensive, sophisticated and huge, the cost of developing the equipment is much considered in ILS. Therefore, the model of the level of repair analysis about equipment which have the multi-echelon and multi-indenture are purposed to derive optimal repair policy which mostly satisfy the availability by using the Mixed Integer Programming within the minimum cost.

  • PDF

A Study on Standardization of Supervision Cost by Investigating Supervision Workload in Cultural Heritage Repair Works (문화재수리공사의 감리업무량 조사를 통한 감리대가 기준 마련 연구)

  • Park, Hwan-Pyo;Han, Jae-Goo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.32-42
    • /
    • 2013
  • The Korean Government introduced a cultural heritage supervision system in January 2010 to control quality and to prevent poor construction. However, cultural heritage related constructions that require supervision, a scope of supervision, supervision cost and placement of supervisors have not been standardized yet. For this reason, standards of supervision for repair works of cultural heritage that reflect the characteristics of small-scale repair works and restoration of cultural heritage are required. Accordingly, this study has suggested standards of supervision works and cost by analyzing the average construction period that is suitable for the characteristics of cultural heritage repair works. In other words, this study has suggested standards of full-time supervision costs by applying the fixed amount-added method (adding direct labor cost, direct expenses, overhead expenses, engineering fee, charges for additional works and VAT) which is the same as the method of calculating supervision costs for public construction projects because a supervisor has to work full time at a construction site to perform supervision if the project is a mid/large-scale cultural heritage repair work. Also, this study has suggested standards of part-time supervision costs for a small-scale cultural heritage repair work and the ways of supervising the construction projects by visiting the project site on important occasions. According to the result of the analysis by applying the forgoing standards of supervision costs for cultural heritage, a full-time supervision cost for cultural heritage repair works is approximately 98% compared to the construction supervision of a public construction project, and a part-time supervision is approximately 158% compared to architectural construction supervision. It is expected that the valuable cultural heritage of Korea will be preserved by controlling quality of cultural heritage repair works through the application of this study result - the standards of supervision costs for cultural heritage repair works - to an actual project.

A Study on the Estimation of Probabilistic Repair.Reinforcement Cycles from Rating Curve of Steel Girder Bridges (강재 교량의 노후화에 따른 확률적 보수.보강 주기 추정에 관한 연구)

  • Kim, Hyun-Bae;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.102-110
    • /
    • 2009
  • The cost for maintenance of bridge structures such as repair or reinforcement is increasing. In addition, the efforts for inspection of bridge structures is becoming more important since the proper repair or reinforcement should be performed to save the maintenance cost and ensure the safety for public infrastructure. Therefore, it is studied on this paper to estimate the repair or reinforcement cycles using probabilistic approach for the steel-box girders of bridge superstructure. In addition, a computer simulation program is uniquely developed based on probabilistic approach to calculate the cycles derived from the function of age of bridge and performance rating curve which were previously studied. In order to ensure the reliability of results and appropriateness of the model, statistical analyses were performed. Also, the results were compared and proved to be similar with ones from previous statistical data related to the repair or reinforcement cycles. The results from this study is expected to be useful for the determination of proper time to repair or reinforce the bridge structure and raise the safetyness of bridge structure in advance.

RRAM (Redundant Random Access Memory) Spare Allocation in Semiconductor Manufacturing for Yield Improvement (수율향상을 위한 반도체 공정에서의 RRAM (Redundant Random Access Memory) Spare Allocation)

  • Han, Young-Shin
    • Journal of the Korea Society for Simulation
    • /
    • v.18 no.4
    • /
    • pp.59-66
    • /
    • 2009
  • This has been possible by integration techniques such as very large scale integration (VLSI) and wafer scale integration (WSI). Redundancy has been extensively used for manufacturing memory chips and to provide repair of these devices in the presence of faulty cells. If there are too many defects, the momory has to be rejected. But if there are a few defects, it will be more efficient and cost reducing for the company to use it by repairing. Therefore, laser-repair process is nedded for such a reason and redundancy analysis is needed to establish correct target of laser-repair process. The proposed CRA (Correlation Repair Algorithm) simulation, beyond the idea of the conventional redundancy analysis algorithm, aims at reducing the time spent in the process and strengthening cost competitiveness by performing redundancy analysis after simulating each case of defect.

Burn-in When Minimal Repair Costs Vary With Time

  • Na, Myung-Hwan;Lee, Sang-Yeol
    • Proceedings of the Korean Statistical Society Conference
    • /
    • 2002.11a
    • /
    • pp.147-151
    • /
    • 2002
  • Burn-in is a widely used method to eliminate initial failures. Preventive maintenance policy such as block replacement with minimal repair at failure is often used in field operation. In this paper burn-in and maintenance policy are taken into consideration at the same time. The cost of a minimal repair is assumed to be a non-decreasing function of its age. The problems of determining optimal burn-in times and optimal maintenance policy are considered.

  • PDF

Auto Defect Repair Algorithm for LCD Panel Review & Repair Machine (LCD 패널 Review & Repair 장비의 결함수정 자동화 알고리즘)

  • Lee, W.C.;Lim, S.M.;Lee, S.K.;Jeong, S.H.;Hong, S.K.
    • Laser Solutions
    • /
    • v.15 no.1
    • /
    • pp.6-9
    • /
    • 2012
  • In TFT-LCD manufacturing process, various defects are generated by manufacturing machine trouble or particle. These defects can be repaired through the TFT-Laser repair process that only can't be automated in TFT-LCD manufacturing Process. In this Paper, we propose auto defect algorithm for TFT-LCD laser repair machine using image processing algorithm in order to automate process. Proposed algorithm can detect very small defects (< 2um) in 98% success ratio, and generated laser repair path guarantee highly precise position accuracy. Through proposed system, much of the work still done the old-fashioned way, by hand, can be automated and manufacturing company can be strengthed the competitiveness of cost.

  • PDF

Optimum Maintenance and Retrofit Planning for Reliable Seismic Performance of the Bridges (내진성능확보를 위한 교량의 최적유지보수계획법)

  • 고현무;이선영;박관순;김동석
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.6 no.5
    • /
    • pp.29-36
    • /
    • 2002
  • In the maintenance and retrofit planning of a bridge system, the optimal strategy for inspection and repair are suggested by minimizing the expected total life-cycle cost, which includes the initial cost, the costs of inspection, repair, and failure. Degradation of seismic performance is modeled by using a damage function. And failure probability is computed according to the degree of damage detection by random vibration theory and the event tree analysis. As an example to illustrate the proposed approach, a 10-span continuous bridge structure is used. The numerical results show that the optimum number of the inspection and the repair are increased, as the seismic intensity is increased and the soil condition of a site becomes more flexible.

Maintenance Case and Cost Analysis for University Facilities (대학시설물의 유지보수 건수 및 비용 분석)

  • Shin, Myeoung-Ha;Lee, Chan Sik
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.23 no.6
    • /
    • pp.27-34
    • /
    • 2016
  • Although the scale and number of university facilities have increased, the maintenance of these facilities has not been efficient as maintenance costs incurred during facility operation periods, as well as management time, have not been sufficiently considered. In this study, the maintenance record data of national universities was compared and analyzed to analyze factors that incur maintenance costs according to the uses and costs of the facilities. According to the results, the number of cases of maintenance and repair work for basic educational facilities was shown to be the largest, accounting for 79%. The number of maintenance and repair work occurred according to work type was examined. According to the results, the highest ratio of maintenance and repair work occurred in the field of construction, specifically, the maintenance costs required for facility supplementation accounted for the highest ratio. Maintenance costs per unit area decreased over time in the newer university facilities, while showing a tendency to increase in older university facilities. However, there were cases where maintenance costs did not show any trends due to factors such as the limited maintenance budgets owing to the characteristics of public service facilities and facilities in the stage of deterioration or destruction after the stage of stabilization. This study is considered to be helpful for efficient university facility maintenance plans and budget calculations.

Development of Pavement Management System for Highway Maintenance (국도유지관리를 위한 포장관리시스템 개발에 관한 연구)

  • Lee, Young-Wook;Do, Myung-Sik;Lee, Jong-Dal
    • International Journal of Highway Engineering
    • /
    • v.9 no.4
    • /
    • pp.159-169
    • /
    • 2007
  • In this paper, a PMS(Pavement Management System) is presented for the public agency who wish to execute rational repair by referring to asset management information regarding road pavement. The aim of the paper is to provide the decision makers with the planning information regarding maintenance strategies for efficient road pavement management. We found that life cycle cost can be minimized and repair cost in each year fluctuates when repeating repair at the IRI management level. The validity of PMS application presented in this paper is investigated through case studies for conducted for 22 national highway road sections in Korea.

  • PDF

Cost-optimal Preventive Maintenance based on Remaining Useful Life Prediction and Minimum-repair Block Replacement Models (잔여 유효 수명 예측 모형과 최소 수리 블록 교체 모형에 기반한 비용 최적 예방 정비 방법)

  • Choo, Young-Suk;Shin, Seung-Jun
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.45 no.3
    • /
    • pp.18-30
    • /
    • 2022
  • Predicting remaining useful life (RUL) becomes significant to implement prognostics and health management of industrial systems. The relevant studies have contributed to creating RUL prediction models and validating their acceptable performance; however, they are confined to drive reasonable preventive maintenance strategies derived from and connected with such predictive models. This paper proposes a data-driven preventive maintenance method that predicts RUL of industrial systems and determines the optimal replacement time intervals to lead to cost minimization in preventive maintenance. The proposed method comprises: (1) generating RUL prediction models through learning historical process data by using machine learning techniques including random forest and extreme gradient boosting, and (2) applying the system failure time derived from the RUL prediction models to the Weibull distribution-based minimum-repair block replacement model for finding the cost-optimal block replacement time. The paper includes a case study to demonstrate the feasibility of the proposed method using an open dataset, wherein sensor data are generated and recorded from turbofan engine systems.