• Title/Summary/Keyword: Repair Cost

Search Result 687, Processing Time 0.03 seconds

Corrosion-Fatigue Reliability-Based Life Cycle Cost Analysis of High-Speed Railway Steel Bridges (고속철도 강교량의 부식.피로신뢰성 기반 생애주기비용 분석)

  • Jeon, Hong-Min;Sun, Jong-Wan;Cho, Hyo-Nam
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1132-1140
    • /
    • 2007
  • As it recently appears that Life Cycle Cost Analysis may be considered as new methodology for economic valuation of infrastructure many researches have been made to assess LCC(Life Cycle Cost) of each facility based on a reasonable methods. In general, LCC is composed of construction cost and expected maintenance repair cost. And especially, maintenance repair cost must be estimated to enhance the reliability through systematic and reasonable methods. However in Korea, because high speed railway steel bridges are recently constructed no direct statistical data are available for the account of the maintenance cost and then their maintenance characteristics are not linear yet. Therefore, the approach proposed in the paper utilizes a theoretical determination and degradation of the corrosion and fatigue of the bridges based on Rahgozar et al.(2006)'s model on fatigue notch factor considering into the corrosion to incorporate the corrosion effect into the fatigue strength reduction model. And then, the corresponding probability of failure is calculated in terms of the reliability index using S-N curve to formulate the fatigue limit state. Therefore, this paper proposes the minimum Life Cycle Cost through optimum maintenance plan analysis of high-speed railway steel bridges under construction. Finally, this paper reviews the proposed model in oder to confirm the applicability and feasibility by appling it to high speed railway steel bridges under construction

  • PDF

On Multipurpose Replacement Policies for the General Failure Model

  • Cha, Ji-Hwan
    • Journal of the Korean Data and Information Science Society
    • /
    • v.14 no.2
    • /
    • pp.393-403
    • /
    • 2003
  • In this paper, various replacement policies for the general failure model are considered. There are two types of failure in the general failure model. One is Type I failure (minor failure) which can be removed by a minimal repair and the other is Type II failure (catastrophic failure) which can be removed only by a complete repair. In this model, when the unit fails at its age t, Type I failure occurs with probability 1-p(t) and Type II failure occurs with probability p(t), $0{\leq}p(t){\leq}1$. Under the model, optimal replacement policies for the long-run average cost rate and the limiting efficiency are considered. Also taking the cost and the efficiency into consideration at the same time, the properties of the optimal policies under the Cost-Priority-Criterion and the Efficiency-Priority-Criterion are obtained.

  • PDF

Cost Optimizing Burn-in Time Determination (비용을 극소화하는 최적 번인시간 결정)

  • Lee, Sang-Yong;Park, Hae-Geun
    • Journal of Korean Society for Quality Management
    • /
    • v.21 no.2
    • /
    • pp.102-108
    • /
    • 1993
  • The purpose of burn-in is to eliminate the early failures of the products before they are delivered for customer use. Therefore burn-in should he continued until one is reasonally sure that all the weak items have failed, thus leaving the remaining items in a healthy state of reliability. From this point of view, burn-in time dependent costs such as a cost per product per burn-in time, and cost of repair of the product per failure occurred during burn-in time will he increased. Conversely, the cost of field repair of the product per failure occurred during the guarantee period will be decreased since the early failure of the product is fully eliminated during burn-in. Hence, this paper intend to determine optimal burn-in time which minimize the total of above costs associated with burn-in.

  • PDF

A Bayesian Approach to Replacement Policy with Extended Warranty (연장된 보증이 있는 교체정책에 대한 베이지안 접근)

  • Jung, Ki Mun
    • Journal of Applied Reliability
    • /
    • v.13 no.4
    • /
    • pp.229-239
    • /
    • 2013
  • This paper reports a manner to use a Bayesian approach to derive the optimal replacement policy. In order to produce a system with minimal repair warranty, a replacement model with the extended warranty is considered. Within the warranty period, the failed system is minimally repaired by the manufacturer at no cost to the end-user. The failure time is assumed to follow a Weibull distribution with unknown parameters. The expected cost rate per unit time, from the end-user's viewpoints, is induced by the Bayesian approach, and the optimal replacement policy to minimize the cost rate is proposed. Finally, a numerical example illustrating to derive the optimal replacement policy based on the Bayesian approach is described.

A Study on an Authorized Stockage List Selection Model (목표계획법을 이용한 사단급 ASL 선정 모형에 관한 연구)

  • 김충영;길계호
    • Journal of the military operations research society of Korea
    • /
    • v.25 no.1
    • /
    • pp.75-86
    • /
    • 1999
  • The selection criteria of an Authorized Stockage List (ASL) in the Army is based on Army Regulation(AR)409. However, the current selection method of ASL is not considered in cost, weight and volume of repair parts. This paper is focused on developing for a new selection model taking account of cost, weight and volume of repair parts. Goal programming is utilized in order to consider weighted priorities. Different units of cost, and volume are normalized for using weighing value. Real data of a field division are applied to the model. Results of the new selection model are more reduced in cost, weight and volume than those of the previous method.

  • PDF

A Bayesian Approach to Replacement Policy Based on Cost and Downtime

  • Jung, Ki-Mun;Han, Sung-Sil
    • Journal of the Korean Data and Information Science Society
    • /
    • v.17 no.3
    • /
    • pp.743-752
    • /
    • 2006
  • This paper considers a Bayesian approach to replacement policy model with minimal repair. We use the criterion based on the expected cost and the expected downtime to determine the optimal replacement period. To do so, we obtain the expected cost rate per unit time and the expected downtime per unit time, respectively. When the failure time is Weibull distribution with uncertain parameters, a Bayesian approach is established to formally express and update the uncertain parameters for determining an optimal maintenance policy. Especially, the overall value function suggested by Jiagn and Ji(2002) is applied to obtain the optimal replacement period. The numerical examples are presented for illustrative purpose.

  • PDF

Replacement Model after Extended Two-phase Warranty (연장된 이단계 보증 이후의 교체모형)

  • Jung, Ki Mun
    • Journal of Integrative Natural Science
    • /
    • v.14 no.4
    • /
    • pp.197-204
    • /
    • 2021
  • Under the two-phase warranty, the warranty period is divided into two intervals, one of which is for renewing replacement warranty, and the other is for minimal repair warranty. Jung[13] discusses the two types of extended two-phase warranty models. In this paper, we suggest the replacement model after the extended two-phase warranty that has been proposed by Jung[13]. To determine the optimal replacement policy, we adopt the expected cost rate per unit time. So, the expressions for the total expected cost, the expected length of the cycle and the expected cost rate per unit time from the user's point of view are derived. Also, we discuss the optimal replacement policy and the uniqueness of the solution for the optimization. Furthermore, the numerical examples are provided to illustrate the proposed the replacement model.

Comparison of Predicted Maintenance Costs and Actual Maintenance Cost of Military Facilities - Focused on BTL Project - (병영 시설물 수선유지비용 예산대비 실투입 비교에 관한 연구 - BTL사업 중심으로 -)

  • Lee, Don-Soo;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.5
    • /
    • pp.473-481
    • /
    • 2017
  • With the barracks modernization project, the Ministry of National Defense has been operating 60 projects of the 75 that have been announced. It was difficult to investigate and analyze the data in the past because data could not be obtained while it was much easier to do that since data can be obtained from private companies. With the aim of increasing the usability of the facilities, the objective of this study is to present a reasonable alternative for repair and maintenance costs by investigating and analyzing the budget and the actual expenses of repair and maintenance of military facilities for the past 3 to 5 years, and then identifying the problems with these. To accomplish this, a theoretical review of previous studies and legal grounds related to repair and maintenance costs was performed, and data on the estimates and the actual expenses data used in BTL projects carried out by private companies were analyzed. First, one of the problems was that there are some items omitted, including consumables, and these items should be included in order to secure their budget. Second, in terms of the items for divided payments, two improvements had been presented: a short-term payment plan for the operation period of 3 to 5 years and a long-term payment plan for an additional and complemented period other than the operation period. The repair and maintenance costs should be further studied at the point of time in a future when the actual data on the costs and operation period of military facilities can be secured. This study is expected to serve as empirical data that will form the basis for a reasonable calculation of the construction cost for military facilities.

Service Life Prediction and Cost Estimation of Repaired Concrete Structures Under Marine Environment (염해 환경 하 보수된 콘크리트 구조물의 사용수명 예측 및 보수 비용 평가)

  • Shim, Hyun Bo;Ann, Ki Yong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.1
    • /
    • pp.226-234
    • /
    • 2011
  • The service life of concrete structures exposed to a marine environment can be extended by controlling the amount of chloride in cover concrete. Patching is one of the appropriate maintenance techniques for chloride contamination. Chloride-contaminated cover concrete is removed and replaced with sound one. It can provide less risk of corrosion of steel, so that the structure can be maintained for required service life. In this study, a quantitative assessment of the service life subjected to the chloride attack is proposed to determine the effective repair options such as repair depth, repair material and timing of repair. The Crank-Nicolson based finite difference formulation from Fick's second law is proposed to predict the profiles of chloride ion in a repaired concrete structure, considering ingress of chloride from outer and redistribution of residual chloride from the substrate concrete. Therefore, the repair application times and maintenance cost for the target service life can be estimated. Finally, the numerical examples are presented to ensure its applicability.

Repair-Replacement Strategies for Warrantied Items with Phase-Type Lifetimes (PH 수명분포를 갖는 보증제품의 수리-교체 전략)

  • Kim, Ho-Gyun;Bae, Chang-Ok;Kim, Seung-Cheol
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2005.05a
    • /
    • pp.686-691
    • /
    • 2005
  • We are concerned with the question of servicing warranties for repairable items. During the warranty period, each time an item fails the manufacturer has the obligation to restore the item to operational condition either by repairing the item or by replacing it by a new item. In this paper, we consider the repair-replacement strategies based on the condition of the failed item. For products with phase-type lifetime distributions where the phases represent the condition of the item, we develop algorithms to determine the expected cost of servicing a warranty and use it in making the repair-replacement decision. Illustrative numerical examples are presented. We also propose a dynamic strategy by taking the expected remaining warranty cost into consideration.

  • PDF