• Title/Summary/Keyword: Removal load

Search Result 363, Processing Time 0.022 seconds

Semi-pilot Scaled Biofilter Treatment of Malodorous Waste Air Containing Hydrogen Sulfide and Ammonia: 1. Performance of Biofilter Packed with Media with Immobilized Thiobacillus sp. IW and Return-sludge (황화수소와 암모니아를 함유한 악취폐가스의 세미파일럿 규모 바이오필터 처리: 1. Thiobacillus sp. IW 및 반송슬러지를 고정한 담체를 충전한 바이오필터 운전)

  • Lee, Eun Ju;Park, Hyeri;Lim, Kwang-Hee
    • Korean Chemical Engineering Research
    • /
    • v.51 no.5
    • /
    • pp.568-574
    • /
    • 2013
  • A semi-pilot biofilter packed with media with immobilized Thiobacillus sp. IW and return sludge, was operated under various operating conditions in order to treat malodorous waste air containing both hydrogen sulfide and ammonia which are major air pollutants emitted from composting factories and many publicly owned treatment works (POTW). At the incipient and middle stages of a semi-pilot biofilter operation, the hydrogen sulfide-removal efficiency behaves regardless of an inlet-load of ammonia. However, the ammonia-removal efficiency decreased as an inlet-load of hydrogen sulfide increased. Nevertheless, at the final stage of the semi-pilot biofilter operation, the ammonia-removal efficiency was not affected by the increase of hydrogen sulfide-inlet load. It is attributed to that a serious acidification of semi-pilot biofilter-media did not occur due to continuous injection of buffer solution at the final stage of the semi-pilot biofilter operation. When both hydrogen sulfide and ammonia contained in malodorous waste air were treated simultaneously by semi-pilot biofilter, the maximum elimination capacities of hydrogen sulfide and ammonia turned out to be ca. 58 and $30g/m^3/h$, respectively. These maximum elimination capacities were estimated to be ca. 39 and 46% less than those for lab-scaled biofilter-separate elimination of hydrogen sulfide and ammonia, respectively. Thus, for the simultaneous biofilter-treatment of hydrogen sulfide and ammonia, the maximum elimination capacity of ammonia decreased by 7% more than that of hydrogen sulfide.

Analysis of Factors Affecting Retention Time in Grassed Swale (식생수로에서 유하시간에 영향을 주는 인자 분석)

  • Paek, Seoungbong;Gil, Kyungik
    • Journal of Wetlands Research
    • /
    • v.17 no.3
    • /
    • pp.303-310
    • /
    • 2015
  • Recently the water quality management policy gives priority to management the point source. Point pollution sources have definite emission points and are discharged to one point through a pipe. But Nonpoint pollution source (NPS) has uncertain pathway, pollutant load and runoff characteristics unlike point pollution sources, making them difficult to manage. Thus, the Korea government plans to develop and equip facilities that help reduce NPS so as to manage them more easily. But removal efficiency of Best Management Practice (BMPs) is in influenced by rainfall, hydrologic condition like natural phenomenon, so factors of removal efficiency are difficult. Thus there is a need for multilateral research about many factors that affect removal efficiency for removal facility design of proper non-point pollution. In this research, mapping, vegetation coverage and retention time were investigated in the case of factors that affect removal efficiency in grassed swale, a nature-type non-point removal facility. Grassed swale obtained changed of coverage using Braun-Blanquet within swale and retention time was obtained from point that rainfall effluent enters into swale to the time that first outflow starts. Besides, correlation analysis was obtained using pearson correlation analysis method. As a result, it was shown that removal efficiency increases as retention time is longer in grassed swale and that retention time increases as vegetation coverage is higher.

Demonstration Study on Ammonia Stripping in Electronic Industry Wastewater with High Concentrations of Ammonia Nitrogen (고농도 암모니아를 함유한 전자 폐수의 암모니아 탈기 실증 연구)

  • Jae Hyun Son;Younghee Kim
    • Clean Technology
    • /
    • v.29 no.4
    • /
    • pp.297-304
    • /
    • 2023
  • The rapid advancement of the high-tech electronics industry has led to a significant increase in high-concentration ammonia wastewater. Various methods have been attempted to reliably treat wastewater containing high concentrations of ammonia, but no successful technology has yet been developed and applied. In this study, the removal efficiency and characteristics of ammonia nitrogen was evaluated according to changes in temperature, air loading rate, and liquid loading rate using a closed circulation countercurrent packed tower type demonstration facility for wastewater containing high concentrations of ammonia generated in the high-tech electronics industry. The temperature was varied while maintaining operating conditions of a wastewater flowrate of 20.8 m3 h-1 and an air flow rate of 18,000 Nm3 h-1. The results showed that at temperatures of 45,50,55, and 60℃, the removal efficiencies of ammonia nitrogen (NH3-N) were 87.5%, 93.4%, 96.8%, and 98.7%, respectively. It was observed that temperature had the most significant impact on the removal efficiency of NH3-N under these conditions. As the air loading rate increases, the removal rate also increases, but the increase in removal efficiency is not significant because droplets from the absorption tower flow into the stripping tower. Even if the liquid loading rate was changed by ±30%, the removal rate did not change significantly. This does not mean that the removal rate was unaffected, but was believed to be due to the relatively high air load rate. Through demonstration research, it was confirmed that ammonia stripping is a reliable technology that can stably treat high-concentration ammonia wastewater generated in the high-tech electronics industry.

Research on a Stability of Feedwater Control System after Stretched Power Uprate and Replacement Steam Generator for Ulchin Units 1&2 (울진1,2호기 출력최적화 및 증기발생기 교체가 주급수 제어계통 안정도에 미치는 영향연구)

  • Yoon, Duk-Joo;Kim, In-Hwan;Kim, Sang-Yeol
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.8 no.2
    • /
    • pp.14-20
    • /
    • 2012
  • Full load rejection capability of nuclear power plant depends primarily on steam dump capacity (SDCAP) and steam generator level control capability. Recently, Ulchin Units 1&2 have performed stretched power uprate (SPU) and replacement steam generator (RSG) projects, which increase the power by 4.5 percent. They change major design or operating parameters and especially reduces steam dump capacity at full power due to increase of the steam flow. The reduction of SDC after SPU results in degradation of heat removal capability in full load rejection transients. Therefore, we should perform evaluation to determine whether reactor trips occur in large load rejection transients. Uchin Units 1&2 have experienced full load rejection (FLR) three times from 2004 to 2010. Operating data from the plant occurrence of FLR at Ulchin Units 1&2 showed that steam generator (SG) level transients were limiting in point of reactor trip. However the plant had never reached reactor trip in the FLR and successfully continued in house load operation. The parameters and setpoints for the SG will be changed if the SG is replaced. Therefore, we evaluated the appropriateness of steam dump, main feedwater and steam generator water level control system preventing the plant from reactor trip in case of FLR by the parameter sensitivity study whether SG water level operated smoothly after SPU and RSG projects.

Structure and Strength Analysis of Scissors Boom of Heavy Load Transporter through Finite Element Analysis (유한요소해석을 통한 중량물 이동대차 시저스붐의 구조 및 강도 해석)

  • Hyeon-Ho Lim;Chang-Min Yang;Kwon-Woong Choi;Dae-Woo Choi
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.spc
    • /
    • pp.61-67
    • /
    • 2023
  • Special equipment used for snow removal is only used in the winter and must be moved into storage during non-winter seasons. However, when moving heavy equipment using a forklift within a limited space, safety accidents may occur due to deformation and damage due to the worker's limited visibility and excessive loading of heavy objects. In this study, the scissors boom of the developed heavy load transporter was conducted in two cases: link structural analysis and position-based structural analysis. In detail, the link structural analysis covers four cases of stress and safety factor according to material and thickness to optimize the specifications of the material selected during development, and the structural analysis according to position covers two cases before and after the lift, when maximum stress concentration is achieved. Safety was evaluated through finite element analysis. As a result of the study, when manufacturing a scissors boom type heavy load transporter that can withstand a load of 10 tons, the link showed safety at SS400 4.5mm or higher, and reinforcement is needed in the upper and lower structures, so it is judged to be useful in applying materials according to the load.

Particle Detachment in Granular Media Filtration (입상여과에서 입자물질의 탈리)

  • Kim, Jinkeun
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.18 no.5
    • /
    • pp.673-679
    • /
    • 2004
  • Particle breakthrough can occur by either the breakoff of previously captured particles (or flocs) or the direct passage of some influent particles through the filter. Filtration experiments were performed in a laboratory-scale filter using spherical glass beads with a diameter of 0.55 mm as collectors. A single type of particle suspension (Min-U-Sil 5, nearly pure $SiO_2$) and three different destabilization methods (pH control, alum and polymer destabilization) were utilized. The operating conditions were similar to those of standard media filtration practice: a filtration velocity of 5 m/h. To assess the possibility of particle detachment during the normal filtration, a hydraulic shock load (20% increase of flow rate) was applied after 4 hours of normal filtration. The magnitude of particle detachment was proportional to the particle size for non-Brownian particles. At the same time, less favorable particles, i.e., particles with larger surface charge, were easily detached during the hydraulic shock load. Therefore, proper particle destabilization before filtration is crucial for maximum particle removal as well as minimum particle breakthrough.

Digital Controller Design of a Magnetic Bearing System for High Speed Milling Spindle (고속 밀링 주축용 자기베어링 시스템의 디지털 제어기 설계)

  • 노승국;경진호;박종권
    • Proceedings of the Korean Society of Machine Tool Engineers Conference
    • /
    • 2004.04a
    • /
    • pp.398-403
    • /
    • 2004
  • The demand of high speed machining is increasing because the high speed cutting providers high efficiency of process, short process time, improved metal removal capacity and better surface finish. Active magnetic bearings allow much high surface speed than conventional ball bearings and therefore greatly suitable for high speed cutting. The automatic control concept of magnetic bearing system provides ability of intelligent control of spindle system to increase accuracy and flexibility by means of adaptive vibration control. This paper describes a design and development of a milling spindle system which includes built-in motor with power 5.5㎾ and maximum speed 70,000rpm, HSK-32C tool holer and active magnetic bearing system. Magnetic actuators are designed for satisfying static load condition. The Performances of manufactured spindle system was examined for its static and dynamic stiffness, load capacity, and rotational accuracy. This spindle was run up to 70,000 rpm stably, which is 3.5 million DmN.

  • PDF

A study on Removal of $NH_3$ Gas in a Towar using a Ralu-Pack 250YC as a Packing Material (Ralu-Pack 250YC를 충전한 충전탑에서 암모니아가스 제거에 관한 연구)

  • 김석택
    • Journal of Environmental Science International
    • /
    • v.9 no.5
    • /
    • pp.389-392
    • /
    • 2000
  • In this study a packed tower was selected for the treatment apparatus of $NH_3$ gas produced in industry. Formerly latticework packing has been used in preventive facility of treatment of $NH_3$ gas. However recently metallic Ralu-Pack 250YC. structured packing is usually being used in petrochemical production plant. This study is for the application the packing to the $NH_3$ gas treatment in wet scrubbing process. In Air/water system hydraulic pressure drop dependent of specific liquid load and gas capacity factor was continuous and parallel from graph. The tower height can be determuined by the number of transfer unit and the height of transfer unit influenced on liquid distribution.

  • PDF

A Study on the Sri Autobindo Center Guest House Design (Sri Autobindo Center Guest House 디자인에 관한 연구)

  • 손철수
    • Journal of the Korean housing association
    • /
    • v.12 no.4
    • /
    • pp.227-230
    • /
    • 2001
  • The Sri Autobindo Learning Center(SALC) is sponsoring the development of a passive solar village in Creston, Colorado, Situated near the Sangre de Cristo mountains, Savitri Village will be one of several religious communities in the area. This village will incorporate 12 permanent residences and teaching and guest facilities for fifty to one hundred people. The purpose of this study is to evaluate the passive solar elements and performance of guest house at the Sri Autobindo Learning Center(SALC). To do this evaluation, the following tasks needed to be addressed. 1. the guest house design 2. the location of weather data 3. The determination of the building heating load As part of the evaluation process, guest house design will be modified and the building load and solar saving recalculated. This process will be completed until the building performance is deemed satisfactory. The conclusion is as follows; The high solar savings fraction predicted by SUNCODE should taken as an indication that further design changes would probably not be cost effective. But adding removal overhangs or other low costs measures to increase comfort in the summer appear to be appropriate.

  • PDF

Study on Stress Variation in Slab and Support of Shearwall-Type RC Apartment during Construction (전단벽식 아파트에서 시공중 슬래브 및 동바리의 응력변화에 대한 연구)

  • Kim Young-Chan
    • Journal of the Korean Society of Safety
    • /
    • v.19 no.4 s.68
    • /
    • pp.161-165
    • /
    • 2004
  • Safety and efficiency in the construction of RC structures mainly depends on optimal operation of shore-slat systems. The disasters in RC construction are mainly due to excessive load applied to falsework and premature removal of supports. Development of sufficient compressive strength of early-age connote is essential for the safety of structures during construction. Most of studies on shore-slab interaction have focused on flat slab structures. In this study, load distributions in floor slabs and supports during the construction of shear wall-type RC apartment building structures is investigated using finite element analysis.