• Title/Summary/Keyword: Reliability assessment

Search Result 2,310, Processing Time 0.031 seconds

Reliability Assessment Considering Load Characteristics in Distribution Systems (배전계통에서 부하특성을 고려한 신뢰도평가에 관한 연구)

  • Park, Hyeon-Seok;Rho, Dae-Seok
    • Proceedings of the KAIS Fall Conference
    • /
    • 2008.05a
    • /
    • pp.87-90
    • /
    • 2008
  • This paper deals with the analytical approach for the reliability assessment in radially operated distribution systems. The approach can estimate the expected reliability performance of distribution systems by a direct assessment of the configuration of the systems using the reliability indexes such as NDP(Non-Delivery Power) and NDE(Non-Delivery Energy). The indexes can consider the number and configuration of the load, but can not consider the characteristics of the load which is the one of the most important factor in the investment cost for the distribution systems. Therefore, This paper presents the new indexes considering the expected interruption cost for the load section and shows the effectiveness by simulating at the model systems.

  • PDF

Reliability Assessment of Railway Power System by using Tree Architecture (Tree 구조를 이용한 전철급전시스템의 신뢰도 평가)

  • Cha, Jun-Min;Ku, Bon-Hui
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.1
    • /
    • pp.9-15
    • /
    • 2010
  • As catenary supply electric power directly to the railway system, it is very important to prevent an accident of a catenary for appropriate train operation. This paper proposed the assessment the outage data for "British Catenary Safety Analysis Report" and Korean data to compare the reliability of the railway system. The analyzed data were applied to Event Tree and Fault Tree algorithm to calculate the reliability indices of railway system. Event tree is created and gate results of fault tree analysis are used as the source of event tree probabilities. Fault tree represents the interaction of failures and basic events within a system. Event Tree and Fault Tree analysis result is helpful to assess the reliability to interpreted. The reliability indices can be used to determine the equipment to be replaced for the entire system reliability improvement.

System Reliability-Based Safety and Capacity Evaluation of Cable-Stayed Bridges (쳬계신뢰성에 기초한 사장교의 안전도 및 내하력 평가)

  • 조효남;이승재;임종권;김보헌
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1996.10a
    • /
    • pp.105-112
    • /
    • 1996
  • A practical approach for the assessment of system reliability-based safety and load carring capacity under vehicle traffics is proposed for the realistic evaluation of safety and rating of cable-stayed bridges. A partial event tree analysis model incorporating major critical failure paths is suggested as a practical tool for the system reliability analysis and system reliability-based capacity rating. The proposed approach for the system reliability analysis and system reliability-based rating is applied to the safety assessment of the Jindo Bridge which is one of two existing cable-stayed bridges in Korea. The results of analyses at the system level based on the system reliability are compared with those at the element level.

  • PDF

Reliability Target and Assessment of a Prototype High-Speed Train (시제고속열차의 신뢰도 목표 설정 및 평가 방안)

  • Park, Choon-Soo;Choi, Sung-Hoon;Lee, Tae-Hyung;Kim, Ki-Whan
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1-6
    • /
    • 2007
  • A train is subject to a series of reliability-related tasks through its entire life cycle. Among them the reliability demonstration is required for commercial trains and the test is performed during the commissioning period or the early stage of the commercial operation. On the other hands various test are carried out for prototype trains and hence their operational condition is quit different from that of the commercial trains. One should take account of these differences when reliability assessment is needed for the prototype trains. This paper presents a procedure and an analysis method to evaluate reliability of a prototype train. Reliability data have been obtained through test runs of the HSR-350x and operational conditions for the KTX and HSR-350x have been analyzed to compare the reliability targets of the prototype train.

  • PDF

Reliability Assessment Criteria of Power Amplifier for Mobile Phone (휴대폰용 전력증폭기의 신뢰성 평가기준)

  • Lee, Woo-Sung;Hwang, Soon-Mi;Lee, Kwan-Hun;Song, Byeong-Suk;Jeong, Hai-Sung;Oh, Geun-Tae
    • Journal of Applied Reliability
    • /
    • v.9 no.3
    • /
    • pp.233-248
    • /
    • 2009
  • PAM(Power Amplifier Module) is the important part of a mobile phone transmitter. It amplifies the strength of signal transmitting from a mobile phone to base stations enough to resist noise or interference. In this paper reliability assessment criteria for the PAM are established in terms of quality certification test and lifetime test. The former quality certification test comprises general performance test and environmental test. Items which pass the test undergo lifetime test which guarantees the extent of mean lifetime with certain confidence.

  • PDF

Structural reliability analysis of offshore structure at cold region (저온해역에서의 해양구조물에 대한 구조신뢰성 해석)

  • 이주성
    • Journal of Ocean Engineering and Technology
    • /
    • v.11 no.3
    • /
    • pp.8-19
    • /
    • 1997
  • In this study an adequate type of offshore structure at the Sakhalin region as cold region is proposed and its structural design results are presented based on the reliability analysis. Structural safety assessment has been carried out for the proposed offshore structure at the Sakhalin area as designed by the reliability method. And a rational design procedure is presented based on the reliability analysis. Followings are drawn through the present study : - Four colum TLP structure is proposed as an adequate offshore structure type at the cold region like the Sakhalin region and the reliability-based structural design results are presented. It is seen that the proposed type is a more adequate and economic than the fixed type. - Safety assessment of the proposed structure applying the extended incremental load method is performed. - Referring the allowable safety level for offshore structures it has been found present TLP structure has sufficient structural safety at the system level as well as at the component level.

  • PDF

Development of Program Outcome Self-Assessment Tool in Korean Nursing Baccalaureate Education (간호학 프로그램 학습성과 간접측정 도구개발)

  • Kim, Hyun-Kyoung
    • The Journal of Korean Academic Society of Nursing Education
    • /
    • v.21 no.2
    • /
    • pp.215-226
    • /
    • 2015
  • Purpose: This study aimed to develop a self-assessment tool to evaluate program outcomes of nursing students in Korean nursing undergraduate education. Methods: The instrument development process consisted of literature review, focus group interviews, and item validation. A total of 117 items were analyzed through content validity testing. Data was gathered from 302 nursing students in Korea and analyzed using SPSS 21.0. Results: To construct validity, principal component analysis and Varimax rotation were used, and 12 factors, with a cumulative explanatory variance of 69.16%, were determined from 79 items. For internal consistency and reliability, Cronbach's ${\alpha}$ was .91. The half-split reliability results were .84 and .85, and the ROC curve showed an optimal cutpoint at 227. A five-point Likert scale was used for scoring. Conclusion: This instrument was found to have fair validity and reliability as a self-assessment tool for nursing student learning outcomes. Therefore, it can be used to evaluate program outcomes indirectly in nursing schools.

Assessment of Reliability and Load Carrying Capacity of Aged Wharf Structure of Pier Type (노후된 잔교식 부두의 신뢰성 및 내하력 평가)

  • 조효남;김성훈;김종규;이승재;최영민
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1994.10a
    • /
    • pp.71-78
    • /
    • 1994
  • The main objectives of the study may be stated as follows : \circled1 the acquisition of fundamental updated data for the assessment of aged wharf structures of pier type based on systematic static/dynamic load testing \circled2 the study of techniques and methods for field testing \circled3 realistic safety and load carrying capacity assessment based on practical reliability analysis. In this study field testing of real structure is performed and the results are compared with those of the 2D and 3D linear structural analysis. It may be seen that the practical reliability methods can be applied for the safety and capacity assessment of aged wharf structures of pier type.

  • PDF

Selection of Influencing Factors for Human Reliability Analysis of Accident Management Tasks in Nuclear Power Plants (원자력 발전소 사고관리 직무의 인간신뢰도분석을 위한 수행영향인자의 선정)

  • Kim, Jae-Hwan;Jeong, Won-Dae
    • Journal of the Ergonomics Society of Korea
    • /
    • v.20 no.2
    • /
    • pp.1-28
    • /
    • 2001
  • This paper deals with the selection of the important Influencing Factors (IFs) under accident management situations in nuclear power plants for use in the assessment of human errors. In order to achieve this goal, we collected two types of IF taxonomies, one is the full set IF list mainly developed for human error analysis. and the other is the IFs for human reliability analysis (HRA) in probabilistic safety assessment (PSA). Five sets of IF taxonomy among the full set IF list and ten sets of IF taxonomy among HRA methodologies were collected in the study. From the review and analysis of BRA IFs, we could obtain some insights for the selection of HRA IFs. By considering the situational characteristics of the accident management domain, candidate IFs are chosen. Finally, those IFs are structured hierarchically to be appropriate for the use in the assessment of human error under accident management situation. Three nuclear accidents such as TMI. Chernobyl and JCO were analysed to validate the proposed taxonomy.

  • PDF

Reliability Problem Solving Through Root Cause Analysis (근본원인분석을 이용한 신뢰성 문제 해결)

  • Jeong, Hai Sung
    • Journal of Applied Reliability
    • /
    • v.16 no.1
    • /
    • pp.71-77
    • /
    • 2016
  • Purpose: Root cause analysis (RCA) refers to any systematic process that identifies the causes that contribute to a focus event. The immediate cause of a focus event is often a symptom of underlying causes and may not truly identify the root causes that should be identified and addressed. Currently many RCA tools are available. Different investigators use different RCA tools on different issues. No standardized or commonly agreed way to analyse root causes exists. The purpose of this study is to propose the methodology of RCA process commonly useable for various issues. Methods: The methodology of RCA process is produced based on the hybrid RCA tools. The effectiveness assessment matrix of actions through the root cause candidates is presented. Results: No single RCA technique proposed has so far covered all necessary aspects. A hybrid approach which combines the best features of various techniques is proposed. The effectiveness assessment matrix helps us to identify the root cause to correct or eliminate system vulnerabilities effectively. Conclusion: This hybrid approach and effectiveness assessment matrix can provide guidance of RCA process across many industries and situations.