• 제목/요약/키워드: Relay Using Scheme

검색결과 214건 처리시간 0.026초

Adaptive Power Allocation in Cooperative Relay Networks

  • 고상;박형근
    • 한국정보통신학회:학술대회논문집
    • /
    • 한국해양정보통신학회 2007년도 추계종합학술대회
    • /
    • pp.795-798
    • /
    • 2007
  • In this paper, we proposed a simple power allocation scheme to maximize network lifetime. To maximize network lifetime, it is important to allocate power fairly among nodes in a network as well as to minimize total transmitted power. In the proposed scheme, the allocated power is proportional to the residual power and also satisfies the required SNR at destination node. In this paper, we calculate power allocation in "amplify and forward" (AF) model. We evaluated the proposed power allocation scheme using extensive simulation and simulation results show that proposed power allocation obtains much longer network lifetime than the equal power allocation.

  • PDF

두 UAV를 활용하는 데이터 페리 기반의 가상 전이중 중계전송 기법 (A Data Ferrying-Based Virtual Full-Duplex Relaying Scheme with Two UAVs)

  • 우동혁;황호영
    • 한국정보통신학회논문지
    • /
    • 제24권12호
    • /
    • pp.1639-1645
    • /
    • 2020
  • 본 논문에서는 2개의 UAV(Unmanned Aerial Vehicle)를 중계기로 활용하는 데이터 페리 기반의 가상 전이중 중계전송 기법을 제안한다. 제안하는 기법은 2개의 UAV의 높은 이동성을 활용하여 데이터 페리 기반으로 통신하고자하는 대상과의 거리를 좁힌 후 송수신을 진행한다. 또한, 제안하는 기법은 가상 전이중 중계전송을 통해 반이중 중계전송의 성능 제약 및 전이중 중계전송의 구현 제약을 극복할 수 있다. 또한, IRI(Inter-Relay Interference)에 의한 성능 제약을 완화하기 위해 2개의 UAV에 대한 이동경로의 중심점을 조절하는 알고리즘도 제안한다. 시뮬레이션을 통해 제안하는 중심점 조절 알고리즘에 의한 중심점 이동 결과를 보인다. 제안하는 기법의 성능 평가를 진행한 결과, 기존의 고정된 중계기를 활용한 중계전송 방식에 비해 제안하는 중계전송 기법에서 더 높은 시스템 종단 간 평균 SE(Spectral Efficiency) 성능이 나타났다.

오차를 고려한 765kV 변압기 보호 계전 정정룰 고찰 (Investigation into Transformer Protective Relay Setting Rule Considering Error Ratio)

  • 배영준;이승재;최면송;강상희;김상태;최정이;정창현;유영식;조범섭
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 A
    • /
    • pp.229-231
    • /
    • 2002
  • The digital current differential relaying scheme is widely used for primary protection of 765(kV) power transformer. The current differential relay pickup the internal fault at the threshold which is set at 30% of rating current. Margin of 30% include current transformer error 5%, relay error 5%, on load tap changer error 7% and margin factor 140% obtained from the field experience. In this paper transformer protection relay and relay setting rule of high voltage power system are discussed. And we verify the correctness of relay setting rule with current differential relay using Matlab simulation.

  • PDF

간섭이 완화된 기회주의적인 중계기 시스템의 성능 분석 (Performance Analysis of Interference-Mitigated Opportunistic Relay System)

  • 김태욱;공형윤
    • 한국인터넷방송통신학회논문지
    • /
    • 제14권4호
    • /
    • pp.45-50
    • /
    • 2014
  • 본 논문에서는 사용자 모바일 장치를 중계기로 사용할 경우 발생할 수 있는 간섭 제약에 대해 정의하였다. 또한, 사용자 모바일 장치에서 발생하는 간섭을 완화하기위해 장치 선택 및 전력 할당 기법을 적용하였다. 제안된 전송 알고리즘을 적용할 경우 간섭을 완화시킬 수 있다. 또한, 간섭이 약한 채널에 적용할 경우 통신망 과부하 문제를 해결 할 수 있다. 따라서 추가적인 중계기 설치 없이 사용자 모바일 장치만으로 네트워크 용량을 증가시킬 수 있다. 마지막 으로, 제안한 프로토콜을 레일리 페이딩 환경에서 비트오류율(Bit Error Rate)과 아웃티지 확률(Outage Probability)을 통해 시스템의 성능을 평가한다.

와이브로 네트워크에서 음영지역에 대한 중계방식에 관한 연구 (A Study of Relay scheme for shadow area in WiBro network)

  • 손성찬;오정균
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 한국정보통신설비학회 2008년도 정보통신설비 학술대회
    • /
    • pp.394-397
    • /
    • 2008
  • Recently WiBro network is installed for high speed wireless internet service by telecommunication service provider, however WiBro service is not provided in the region of mountain or difficult region to install network infra. Fixed repeater is used to resolve those shadow area problem in current WiBro network. This paper study introducing Ad-hoc based multi-hop relay instead of using fixed repeater in order to resolve those shadow area problem. Cost down of fixed repeater and active network expansion is possible to resolve shadow area problem by introducing multi-hop relay technology.

  • PDF

주파수 변화율을 이용한 동적부하차단 방안 (A Scheme on the Dynamic Load Shedding Using Rate of Frequency Decline)

  • 이소영;장병태;이재욱;오화진;조범섭;김재현
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제52권6호
    • /
    • pp.301-306
    • /
    • 2003
  • When a bulk power system experiences a serious disturbance or heavy load trip, the system frequency may drop and even collapse if the total generating power does not supply the system demand sufficiently. Since an isolated power system possesses a lower inertia and comes with limited reserves, the load shedding by under frequency relay becomes an important strategy to keep system natural frequency. This paper presents a scheme to determine the load shedding criteria by using the rate of change of frequency when the large disturbance happens.

초전도케이블 계통의 상정사고에 대한 보호협조 연구 (A protective coordination of HTS cable power system using EMTP-RV)

  • 이현철;이근준;백영식;양병모
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2011년도 제42회 하계학술대회
    • /
    • pp.209-210
    • /
    • 2011
  • This paper proposed protective coordination on HTS(High Temperature Superconducting) cable on 22.9kV distributed system. HTS cable transient model is developed and tested using EMTP-RV, system protective coordination is studied with ETAP. Possible contingency and protective scheme are considered real distribution system in Icheon substation. The simulation results was showed, in protective case to apply conventional relay, that appeared problem on HTS cable inner part. The HTS cable couldn't protection on contingency state of power system. It was using high-speed relay system instead of conventional relay system. Then, the HTS cable was protected contingency by circuit breaker.

  • PDF

RTDS를 이용한 Digital 거리계전기의 동특성 시험에 관한 연구 (Dynamic Characteristics of Digital Distance Relay Scheme Using Real Time Digital Simulator(RTDS))

  • 정창호;김일동;김영한;김석일
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1996년도 추계학술대회 논문집 학회본부
    • /
    • pp.109-111
    • /
    • 1996
  • This paper describes real time dynamic tests on the digital distance relay using new digital test system including RTDS(Real Time Digital Simulator) in KEPRI. The RTDS is developed by the Manitoba HVDC Reserch Centre and consists of specialized hardware and software which allows transients simulation of electrical power systems in real time. From high impedance fault test, it is known that the characteritics of distance reach is influenced by load flow. A detailed discussion of relay test using the RTDS simulator, high impedance faults and test results are included in the paper.

  • PDF

피드백을 제한하는 Hybrid ARQ를 이용한 증분 협력 중계기법의 최적의 중계기 위치에 관한 연구 (Optimal Relay Position of Hybrid ARQ Incremental Cooperative Relaying Scheme with Limited Feedback)

  • 김렴;공형윤
    • 한국인터넷방송통신학회논문지
    • /
    • 제11권3호
    • /
    • pp.53-58
    • /
    • 2011
  • 통신 시스템에서 수신 성능을 향상시키는 방법으로 MIMO 기술이 활발히 연구되고 있다. 하지만 최근 소형화되어 가는 대부분의 무선 단말기는 사이즈, 비용, 하드웨어의 복잡성 등의 이유로 적용할 수 있는 안테나의 개수에 한계를 가진다. 이에 따라 개발된 협력통신은 단일 안테나를 가지는 다수의 단말기들이 가상의 MIMO 환경을 구현함으로써 다이버시티 이득을 얻을 수 있다. 하지만 협력통신은 다이버시티를 얻기 위해 스펙트럼 효율성을 저하시키며, 이를 극복할 수 있는 방법으로 증분 중계기법을 이용한다. 본 논문에서는 증분 중계기법을 이용하는 다양한 시스템 모델을 고려하며, 고려된 시스템 모델이 최적의 성능을 얻을 수 있는 중계기 위치를 연구한다.

Modified Transmission Line Protection Scheme in the Presence of SCC

  • Naeini, Ehsan Mostaghimi;Vaseghi, Behrouz;Mahdavian, Mehdi
    • Journal of Electrical Engineering and Technology
    • /
    • 제12권2호
    • /
    • pp.533-540
    • /
    • 2017
  • Distance relay identifies the type and location of fault by measuring the transmission line impedance. However any other factors that cause miss calculating the measured impedance, makes the relay detect the fault in incorrect location or do not detect the fault at all. One of the important factors which directly changes the measured impedance by the relay is series capacitive compensation (SCC). Another factor that changes the calculated impedance by distance relay is fault resistance. This paper provides a method based on the combination of distance and differential protection. At first, faulty transmission line is detected according to the current data of buses. After that the fault location is calculated using the proposed algorithm on the transmission line. This algorithm is based on active power calculation of the buses. Fault resistance is calculated from the active powers and its effect will be deducted from calculated impedance by the algorithm. This method measures the voltage across SCC by phasor measurement units (PMUs) and transmits them to the relay location via communication channels. The transmitted signals are utilized to modify the voltage signal which is measured by the relay. Different operating modes of SCC and as well as different faults such as phase-to-phase and phase-to-ground faults are examined by simulations.