• 제목/요약/키워드: Reinforcement method of dam

검색결과 24건 처리시간 0.012초

필댐 보수보강후 시간경과에 따른 효과 분석 (Effect analysis by time passage after Repair & Reinforcement of Fill Dams)

  • 김재홍;오병현;임은상;홍원표
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 춘계 학술발표회 초청강연 및 논문집
    • /
    • pp.697-703
    • /
    • 2008
  • Excessive water leakage phenomenon happens through damage of nation core zone of about 17,000 storage of water facilities or collapse of dam is worried, is being damaged or enforce dilapidated fill dam core zone's repair reinforcement. Example that use grouting method of construction considering construction and economic performance etc. recently by repair reinforcement way about defect of dam is increased. Permeation grouting method repair & reinforcement of fill dam countermeasure is preferred in nation. Do that is economical to decide these repair reinforcement effect and grouting effect estimation method that do not give damage to dam is effective. Therefore, observing electricity resistivity Survey change of dam since grouting reinforcement using Electric resistivity Survey inquiry of seismic survey method in this research, Wished to verify grouting effect whether is possible as Electric resistivity Survey, and study whether integrity of dam through repair reinforcement defined.

  • PDF

침투그라우팅이 시공된 노후필댐의 보수보강효과 평가 (Estimation of Reinforcement Effect of Superannuated Fill Dam Repaired by the Permeable Grouting Method)

  • 김영진;허열;오병현
    • 한국지반환경공학회 논문집
    • /
    • 제8권6호
    • /
    • pp.45-52
    • /
    • 2007
  • 국내 노후화된 필댐의 경우에는 수문학적 안정성과 더불어 구조적 안정성 확보가 국가재난 예방차원에서 요구되고 있는 실정이다. 설계 및 시공시의 문제나 지진 등 자연현상으로 인하여 댐체가 손상되었거나 노후화로 문제된 댐의 대부분이 필댐 타입이며, 이중 일부는 차수(코아) 존이 손상되어 과다한 누수현상이 발생되고 있어 홍수시 댐 붕괴로까지의 진행이 우려되는 바 차수보강대책에 대한 체계적인 연구가 시급하다고 여겨진다. 본 연구에서는 침투그라우팅으로 보강된 필댐에 있어서 보수.보강 전후의 차수 성능변화를 전기비저항탐사 등의 물리조사를 이용하여 분석 평가하고자 하였다. 연구결과 전기비저항탐사는 그라우팅으로 보강된 필댐의 보강효과를 판단하는 유효한 도구로 사용될 수 있음을 알 수 있었으며, 그라우팅으로 보강된 필댐의 누수량은 크게 저하되어 안정성이 향상 되었음을 알 수 있었다.

  • PDF

돌기형 접합 보강재를 이용한 옥상 노출 복합방수의 조인트 시공방법에 관한 연구 (Sheet Jointing Method of the Roof Exposed Hybrid Waterproofing Using the Bump-type Joint Reinforcement)

  • 김명지;안기원;김동춘;오상근
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 추계 학술논문 발표대회
    • /
    • pp.147-148
    • /
    • 2018
  • Seat waterproofing materials applied to the roof of a building concrete structure inevitably produce joints and are applied with opposite dam joints or overlapping joints depending on the waterproof material applied to the top of the sheet. In this case, the joint performance is determined by the material at the top, rather than by the superimposed joint. In order to solve this problem, various reinforcements have been used to apply to the connecting parts of the opposite dam, but the problem of attachment between different materials or the lack of reinforcement of the joint tape has not been solved. Therefore, for the purpose of securing tensile performance to the joints, this study is used as a reinforcement for the joints of PP materials with high tensile performance and as a reinforcement for nylon materials.

  • PDF

고분해능 탄성파 반사법을 이용한 댐체 내부구조 모니터링 연구 (A study on Monitoring the Inner Structure of Dam Body Using High Resolution Seismic Reflection Method)

  • 김중열;김형수;오석훈;김유성
    • 지구물리
    • /
    • 제8권1호
    • /
    • pp.1-6
    • /
    • 2005
  • 댐체 안정성 문제는 무엇보다 투수 내지 누수 과정에서 유발될 수 있는 댐체 내부 결함(예: 균열)에 귀결된다고 볼 수 있다. 이러한 댐체 내부 결함은 댐 붕괴를 조장할 수 있기 때문에 우선 적절한 탐사 기법을 이용하여 그에 대한 위치 및 규모가 파악되어야 하며 그 결과에 따라 그라우팅에 의한 보수 작업 및 그에 대한 성과 검증 작업이 철저히 이루어져야 한다. 본 연구의 조사 대상이 된 댐은 중심 코어형 흙 댐으로 댐 소단 사면에는 누수로 인한 여러 형태의 결함이 관찰되고 있어 그에 대한 진단 및 보수 보강이 필요한 상태였다. 본 연구에서는 댐체 진단 및 그라우팅 성과 판단을 위해 그라우팅 이전(2001년 8월) 및 이후(2004년 11월)에 댐 마루 측선 상에서 고분해능 탄성파 반사법 탐사를 수행하였다. 탐사 자료의 질을 향상시키기 위해 표면파를 약화시키고 P파 반사파 에너지를 증대시킬 수 있는 발생원 에너지 방사형 변조 기법(P빔발생원)도 응용되었다. 그라우팅 이전 탐사 결과(탄성파 중합단면도)에서는 댐체 내부 균열로 판단되는 강한 반사파가 일 부 구간에서 인식되었으며, 그라우팅 이후 탐사 결과에서는 상기 강한 반사파가 인식되지 않음으로써 3년의 시차를 둔 두개의 탄성파 탐사 결과는 댐체 진단 및 그라우팅 성과 판단을 위한 기본 자료로 반영될 수 있었다. 따라서 고분해능 탄성파 반사법 탐사는 댐 모니터링을 위한 하나의 바람직한 탐사 기법으로 크게 활용될 수 있을 것으로 기대된다.

  • PDF

고분해능 탄성파 반사법을 이용한 댐체 내부구조 모니터링 연구 (A study on monitoring the inner structure of dam body using high resolution seismic reflection method)

  • 김중열;김형수;오석훈;김유성
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 한국지구물리탐사학회 2005년도 공동학술대회 논문집
    • /
    • pp.15-20
    • /
    • 2005
  • 댐체 안정성 문제는 무엇보다 투수 내지 누수 과정에서 유발될 수 있는 댐체 내부 결함(예: 균열)에 귀결된다고 볼 수 있다. 이러한 댐체 내부 결함은 댐 붕괴를 조장할 수 있기 때문에 우선 적절한 탐사 기법을 이용하여 그에 대한 위치 및 규모가 파악되어야 하며 그 결과에 따라 그라우팅에 의한 보수 작업 및 그에 대한 성과 검증 작업이 철저히 이루어져야 한다. 본 연구의 조사 대상이 된 댐은 중심 코어형 흙 댐으로 댐 소단 사면에는 누수로 인한 여러 형태의 결함이 관찰되고 있어 그에 대한 진단 및 보수 보강이 필요한 상태였다. 본 연구에서는 댐체 진단 및 그라우팅 성과 판단을 위해 그라우팅 이전(2001년 8월) 및 이후(2004년 11월)에 댐 마루 측선 상에서 고분해능 탄성파 반사법 탐사를 수행하였다. 탐사 자료의 질을 향상시키기 위해 표면파를 약화시키고 P파 반사파 에너지를 증대시킬 수 있는 발생원 에너지 방사형 변조 기법(P빔 발생원)도 응용되었다. 그라우팅 이전 탐사 결과(탄성파 중합단면도)에서는 댐체 내부 균열로 판단되는 강한 반사파가 일부 구간에서 인식되었으며, 그라우팅 이후 탐사 결과에서는 상기 강한 반사파가 인식되지 않음으로써 3년의 시차를 둔 두 개의 탄성파 탐사 결과는 댐체 진단 및 그라우팅 성과 판단을 위한 기본 자료로 반영될 수 있었다. 따라서 고분해능 탄성파 반사법 탐사는 댐 모니터링을 위한 하나의 바람직한 탐사 기법으로 크게 활용될 수 있을 것으로 기대된다.

  • PDF

필(흙)댐체의 하부 성토법면의 붕괴에 따른 안정성 확보에 대하여 (The Lower Part Landsliding of Embankment Dam According to a Heavy Rainfall and the Reinforced Design for Their Protection)

  • 황성춘;오병현
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2006년도 추계 학술발표회
    • /
    • pp.23-34
    • /
    • 2006
  • In a oo dam at oo city of Gyeongbuk, severe damages have been occurred on lower part of dam due to heavy rainfall for several years. This caused significant impediment for maintaining its original function. This is considered as an excellent case for overall improvement of stability of dam system through successful investigation and construction work. This paper present comprehensive specifications that are generalized and used for securing stability of dams by quoting this example.

  • PDF

P.R.D. 공법을 활용한 가물막이 설계 (The design of coffer dam utilized P.R.D. method)

  • 박철숙;이규탁;염경택;김윤구;강봉권;이재원;임석산;정지열
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.869-887
    • /
    • 2008
  • Coffer dam for tunnel type spillway in inflow section of Dae-am dam was originally planned as 2 lines sheet piles with Water Zet method. But, the result of pilot test was caused of some problems that vibration during installation of pile could pollute water and water leakage could the lower part. So, sheet piles was not satisfactory for faculty of coffer dam. Structural instability of sheet pile system need to reinforcement. Characteristic of Dae-am dam was small reservoir capacity but wide drainage area, of which it was judgment that security of leakage and stability was difficult during excavation of inlet part. So, we consider that water curtain method utilized with in site pouring concrete pile method was designed at weir part of spillway. We were known about basement rock that geological boring was carried out in weir part. After taking a deep consideration, PRD method was accepted as a new method. Concrete pile by PRD was installed to below country rock. CJM method was carried out with PRD. After making concrete wall using Top-down method, earth anchors were installed for supporting it. According to the result of numerical analysis, as water level rises, wall is stable.

  • PDF

가능최대지진(MCE)을 적용한 콘크리트 댐 피어부 내진성능평가 방안 개선 (Improvement of Seismic Performance Evaluation Method for Concrete Dam Pier by Applying Maximum Credible Earthquake(MCE))

  • 오정근;정영석;권민호
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제27권6호
    • /
    • pp.1-12
    • /
    • 2023
  • 본 논문에서는 MCE를 적용한 콘크리트 댐 피어부의 동적소성해석을 통한 내진성능평가 수행 시 소성재료모델, 성능수준 평가 방법에 대한 현행 기준의 적용성을 검토하고 개선안을 제시하였다. 다양한 조건으로 동적소성해석을 수행하여 소성재료모델에 대한 적용성을 검토하였고, 그 결과 현행 댐 내진성능평가요령에서 제시하는 평균응력-평균변형률 기법은 최소철근비가 확보되지 않은 조건에서 동적탄성해석으로 예측한 결과보다 피어부의 응답을 과소평가하는 것으로 확인되었다. 따라서 최소철근비가 확보되지 않은 댐 피어부는 무근콘크리트로 간주하여 콘크리트 인장거동특성에 파괴에너지를 적용하는 방법으로 피어부 성능수준을 평가하도록 하는 개선안을 도출하였다. 개선사항 적용할 경우 현행 내진성능평가 방법보다 보수적인 평가결과를 도출할 수 있다.

3D Laser Scanning을 이용한 댐체의 안정성 검토 (A Examination on Stability of Dam using 3D Laser Scanning System)

  • 이재원;손호웅;윤부열
    • 한국측량학회:학술대회논문집
    • /
    • 한국측량학회 2007년도 춘계학술발표회 논문집
    • /
    • pp.451-454
    • /
    • 2007
  • There is an inseparable relation between human race and engineering work. As world developed into highly industrialized society, a diversity of large structures is being built up correspondently to limited topographical circumstance. Though large structures are national establishments which provide us with convenience of life, there are some disastrous possibilities which were never predicted such as ground subsidence and degradation. It is very difficult to analyze the volume of total metamorphosis with the relative displacement measurement system which is now used and it is impossible to know whether there is structural metamorphosis within a permissible range of design or not. In this research with an object of 13-year-old earthen dam, through generating point-cloud which has 3D spatial coordinates(x, y, z) of this dam by means of 3D Laser Scanning, we can get real configuration data of slanting surface of this dam with this method of getting a number of 3D spatial coordinates(x, y, z). It gives 3D spatial model to us and we can get various information of this dam such as the distance of slanting surface of dam, dimensions and cubic volume. It can be made full use of as important source material of reinforcement and maintenance works to detect previously the bulging of the dam through this research.

  • PDF

Model experiments for the reinforcement method of agricultural reservoirs by overtopping

  • Lee, Young-Hak;Lee, Dal-Won;Heo, Joon;Ryu, Jung-Hyun
    • 농업과학연구
    • /
    • 제47권1호
    • /
    • pp.163-171
    • /
    • 2020
  • In this study, a large laboratory model experiment was conducted with the aim of developing an embankment reinforcement method to prevent overtopping, which is the main cause for the failure of agricultural reservoirs. The model experiment was carried out with concrete and asphalt as a permanent reinforcement method and with geomembrane as the emergency method at a deteriorated homogeneous reservoir. Under the non-reinforced conditions, the pattern of the failure appeared in several scour directions from the downstream slope as the overtopping began, and the width and depth of the erosion were magnified as it gradually moved to the dam crest. Under the conditions reinforced with asphalt and concrete, the overtopping was stabilized. In the case of the concrete reinforcement, it was found that the slope of the riprap boundary exhibited downward erosion by the current; thus, it was necessary to construct an extension up to the riprap joint of the upstream and downstream sides to prevent the expansion of the failure. Under the conditions reinforced with the geomembrane sheet, the overtopping was stabilized, and no seepage was found that required the emergency reinforcement method. Asphalt, concrete, and geomembrane sheet reinforcements have been shown to be capable of delaying failure for about 1 hour and 40 minutes compared to the non-reinforcement conditions. The reinforcement method is considered to be a very effective method to prevent disasters during overtopping. The pore water pressure can be used as useful data to predict the risk of failure at an embankment.