• Title/Summary/Keyword: Reinforcement method of dam

Search Result 24, Processing Time 0.027 seconds

Effect analysis by time passage after Repair & Reinforcement of Fill Dams (필댐 보수보강후 시간경과에 따른 효과 분석)

  • Kim, Jae-Hong;Oh, Byung-Hyun;Im, En-sang;Hong, Won-Pho
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.697-703
    • /
    • 2008
  • Excessive water leakage phenomenon happens through damage of nation core zone of about 17,000 storage of water facilities or collapse of dam is worried, is being damaged or enforce dilapidated fill dam core zone's repair reinforcement. Example that use grouting method of construction considering construction and economic performance etc. recently by repair reinforcement way about defect of dam is increased. Permeation grouting method repair & reinforcement of fill dam countermeasure is preferred in nation. Do that is economical to decide these repair reinforcement effect and grouting effect estimation method that do not give damage to dam is effective. Therefore, observing electricity resistivity Survey change of dam since grouting reinforcement using Electric resistivity Survey inquiry of seismic survey method in this research, Wished to verify grouting effect whether is possible as Electric resistivity Survey, and study whether integrity of dam through repair reinforcement defined.

  • PDF

Estimation of Reinforcement Effect of Superannuated Fill Dam Repaired by the Permeable Grouting Method (침투그라우팅이 시공된 노후필댐의 보수보강효과 평가)

  • Kim, Yungjin;Heo, Yol;Oh, Byunghyun
    • Journal of the Korean GEO-environmental Society
    • /
    • v.8 no.6
    • /
    • pp.45-52
    • /
    • 2007
  • Maintenance of structural and hydrological safety of the superannuated fill dam is very important subject on the viewpoint of disaster prevention. Mainly, the core of the superannuated fill dams have been damaged continuously by the various harmful external forces such as the typhoons, flash floods and earthquake, and these can be connected to the large scaled general dam failure. Therefore, the research on the repair, remediation and reinforcement of dam is necessary. In this study, the permeable grouting method for the remediation of fill dam was examined by the electrical resistivity survey and the change of permeability of core front. As a result, the permeable grouting method can be useful remediation method for the superannuated fill dam, the leakage from the core front decreased greatly before and after the construction of grouting. Furthermore, it can be said that the turbidity of fill dam may not be greatly increased by grouting.

  • PDF

Sheet Jointing Method of the Roof Exposed Hybrid Waterproofing Using the Bump-type Joint Reinforcement (돌기형 접합 보강재를 이용한 옥상 노출 복합방수의 조인트 시공방법에 관한 연구)

  • Kim, Meong-Ji;An, Ki-Won;Kim, Dong-Chun;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.147-148
    • /
    • 2018
  • Seat waterproofing materials applied to the roof of a building concrete structure inevitably produce joints and are applied with opposite dam joints or overlapping joints depending on the waterproof material applied to the top of the sheet. In this case, the joint performance is determined by the material at the top, rather than by the superimposed joint. In order to solve this problem, various reinforcements have been used to apply to the connecting parts of the opposite dam, but the problem of attachment between different materials or the lack of reinforcement of the joint tape has not been solved. Therefore, for the purpose of securing tensile performance to the joints, this study is used as a reinforcement for the joints of PP materials with high tensile performance and as a reinforcement for nylon materials.

  • PDF

A study on Monitoring the Inner Structure of Dam Body Using High Resolution Seismic Reflection Method (고분해능 탄성파 반사법을 이용한 댐체 내부구조 모니터링 연구)

  • Kim, Jung-Yul;Kim, Hyoung-Soo;Oh, Seok-Hoon;Kim, Yoo-Sung
    • Journal of the Korean Geophysical Society
    • /
    • v.8 no.1
    • /
    • pp.1-6
    • /
    • 2005
  • Defects of dam body which can be induced in seepage or leakage procedure can directly affect dam safety. Therefore, a proper inspection method should be carried out in the first place to find out their positions and sizes. After that, some reinforcement works such as grouting and the corresponding assessment could be taken in a proper way. The dam(center core type earth dam) issued in this study has been in need for intensive diagnosis and reinforcement work, because a lot of slumps similar to cracks, seepage and some boggy area have been observed on the downstream slope. High resolution seismic reflection method was performed on the crest profile twice before and after grouting work(Aug. 2001 and Nov. 2004) aimed at the dam inspection and the assessment of grouting efficiency as well. To enhance the data resolution, P-beam energy radiation technique which can reduce the surface waves and hence to reinforce the reflection events was used. Strong reflection events were recognized in the stack section before grouting work, It seems that the events would be caused by e.g. horizontal cracks with a considerable aperture. Meanwhile such strong reflection events were not observed in the section after grouting. That is, the grouting work was dear able to reinforce the defects of dam body. Hence, the section showed an well arranged picture of dam inner structure. In this sense, seismic reflection method will be a desirable technique for dam inspection and for monitoring dam inner structure as well.

  • PDF

A study on monitoring the inner structure of dam body using high resolution seismic reflection method (고분해능 탄성파 반사법을 이용한 댐체 내부구조 모니터링 연구)

  • Kim Jungyul;Kim Hyoungsoo;Oh Seokhoon;Kim Yoosung
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2005.05a
    • /
    • pp.15-20
    • /
    • 2005
  • Defects of dam body which can be induced in seepage or leakage procedure can directly affect dam safety. Therefore, a proper inspection method should be carried out in the first place to find out their positions and sizes, After that, some reinforcement works such as grouting and the corresponding assessment could be taken in a proper way. The dam(center core type earth dam) issued in this study has been in need for intensive diagnosis and reinforcement work, because a lot of slumps similar to cracks, seepage and some boggy area have been observed on the downstream slope. High resolution seismic reflection method was performed on the crest profile twice before and after grouting work(Aug. 2001 and Nov. 2004) aimed at the dam inspection and the assessment of grouting efficiency as well. To enhance the data resolution, P-beam energy radiation technique which can reduce the surface waves and hence to reinforce the reflection events was used. Strong reflection events were recognized in the stack section before grouting work, It seems that the events would be caused by e.g. horizontal cracks with a considerable aperture, Meanwhile such strong reflection events were not observed in the section after grouting. That is, the grouting work was dear able to reinforce the defects of dam body. Hence, the section showed an well arranged picture of dam inner structure. In this sense, seismic reflection method will be a desirable technique for dam inspection and for monitoring dam inner structure as well.

  • PDF

The Lower Part Landsliding of Embankment Dam According to a Heavy Rainfall and the Reinforced Design for Their Protection (필(흙)댐체의 하부 성토법면의 붕괴에 따른 안정성 확보에 대하여)

  • Hwang, Seong-Chun;Oh, Byung-Hyun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.10a
    • /
    • pp.23-34
    • /
    • 2006
  • In a oo dam at oo city of Gyeongbuk, severe damages have been occurred on lower part of dam due to heavy rainfall for several years. This caused significant impediment for maintaining its original function. This is considered as an excellent case for overall improvement of stability of dam system through successful investigation and construction work. This paper present comprehensive specifications that are generalized and used for securing stability of dams by quoting this example.

  • PDF

The design of coffer dam utilized P.R.D. method (P.R.D. 공법을 활용한 가물막이 설계)

  • Park, Chal-Sook;Lee, Kyu-Tak;Yum, Kyung-Taek;Kim, Yoon-Ku;Kang, Bong-Gwon;Lee, Jae-Weon;Lim, Seok-San;Jeong, Ji-Yearl
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.869-887
    • /
    • 2008
  • Coffer dam for tunnel type spillway in inflow section of Dae-am dam was originally planned as 2 lines sheet piles with Water Zet method. But, the result of pilot test was caused of some problems that vibration during installation of pile could pollute water and water leakage could the lower part. So, sheet piles was not satisfactory for faculty of coffer dam. Structural instability of sheet pile system need to reinforcement. Characteristic of Dae-am dam was small reservoir capacity but wide drainage area, of which it was judgment that security of leakage and stability was difficult during excavation of inlet part. So, we consider that water curtain method utilized with in site pouring concrete pile method was designed at weir part of spillway. We were known about basement rock that geological boring was carried out in weir part. After taking a deep consideration, PRD method was accepted as a new method. Concrete pile by PRD was installed to below country rock. CJM method was carried out with PRD. After making concrete wall using Top-down method, earth anchors were installed for supporting it. According to the result of numerical analysis, as water level rises, wall is stable.

  • PDF

Improvement of Seismic Performance Evaluation Method for Concrete Dam Pier by Applying Maximum Credible Earthquake(MCE) (가능최대지진(MCE)을 적용한 콘크리트 댐 피어부 내진성능평가 방안 개선)

  • Jeong-Keun Oh;Yeong-Seok Jeong;Min-Ho Kwon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.6
    • /
    • pp.1-12
    • /
    • 2023
  • This paper assesses the suitability of existing standards for plastic material models and performance level evaluation methods in seismic performance evaluations of concrete dam piers during Maximum Credible Earthquakes (MCE). Dynamic plastic analysis was conducted to examine the applicability of the plastic material model under various conditions. As a result reveal that when the minimum reinforcement ratio is not met, the average stress-average strain method recommended in current dam seismic performance evaluation guidelines tends to underestimate pier responses compared to the predicted outcomes of dynamic elastic analysis. Consequently, the paper proposes an improvement plan that treats dam piers with an insufficient minimum reinforcement ratio as unreinforced and integrates fracture energy into concrete tensile behavior characteristics for performance level evaluation. Implementing these improvements can lead to more conservative evaluation outcomes compared to current seismic performance evaluation methods.

A Examination on Stability of Dam using 3D Laser Scanning System (3D Laser Scanning을 이용한 댐체의 안정성 검토)

  • Lee, Jae-One;Shon, Ho-Woong;Yun, Bu-Yeol
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2007.04a
    • /
    • pp.451-454
    • /
    • 2007
  • There is an inseparable relation between human race and engineering work. As world developed into highly industrialized society, a diversity of large structures is being built up correspondently to limited topographical circumstance. Though large structures are national establishments which provide us with convenience of life, there are some disastrous possibilities which were never predicted such as ground subsidence and degradation. It is very difficult to analyze the volume of total metamorphosis with the relative displacement measurement system which is now used and it is impossible to know whether there is structural metamorphosis within a permissible range of design or not. In this research with an object of 13-year-old earthen dam, through generating point-cloud which has 3D spatial coordinates(x, y, z) of this dam by means of 3D Laser Scanning, we can get real configuration data of slanting surface of this dam with this method of getting a number of 3D spatial coordinates(x, y, z). It gives 3D spatial model to us and we can get various information of this dam such as the distance of slanting surface of dam, dimensions and cubic volume. It can be made full use of as important source material of reinforcement and maintenance works to detect previously the bulging of the dam through this research.

  • PDF

Model experiments for the reinforcement method of agricultural reservoirs by overtopping

  • Lee, Young-Hak;Lee, Dal-Won;Heo, Joon;Ryu, Jung-Hyun
    • Korean Journal of Agricultural Science
    • /
    • v.47 no.1
    • /
    • pp.163-171
    • /
    • 2020
  • In this study, a large laboratory model experiment was conducted with the aim of developing an embankment reinforcement method to prevent overtopping, which is the main cause for the failure of agricultural reservoirs. The model experiment was carried out with concrete and asphalt as a permanent reinforcement method and with geomembrane as the emergency method at a deteriorated homogeneous reservoir. Under the non-reinforced conditions, the pattern of the failure appeared in several scour directions from the downstream slope as the overtopping began, and the width and depth of the erosion were magnified as it gradually moved to the dam crest. Under the conditions reinforced with asphalt and concrete, the overtopping was stabilized. In the case of the concrete reinforcement, it was found that the slope of the riprap boundary exhibited downward erosion by the current; thus, it was necessary to construct an extension up to the riprap joint of the upstream and downstream sides to prevent the expansion of the failure. Under the conditions reinforced with the geomembrane sheet, the overtopping was stabilized, and no seepage was found that required the emergency reinforcement method. Asphalt, concrete, and geomembrane sheet reinforcements have been shown to be capable of delaying failure for about 1 hour and 40 minutes compared to the non-reinforcement conditions. The reinforcement method is considered to be a very effective method to prevent disasters during overtopping. The pore water pressure can be used as useful data to predict the risk of failure at an embankment.