• Title/Summary/Keyword: Reinforcement lining

Search Result 72, Processing Time 0.027 seconds

The Repair and Reinforcement of Tummel using The Carbon Fiber Sheet (탄소섬유시트를 활용한 터널의 보수.보강)

  • Kwon, Young-Jin;Chun, Hyoung-Ki;Lee, Byung-Hun;Choi, Long;Kim, Moo-Han
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1996.10a
    • /
    • pp.526-531
    • /
    • 1996
  • Most of existing tunnels in Korea have structural and material defects, such as lack of the thickness in the crown and presence of an opening behind thie lining as a result of its construction. In Japan, it is said that carbon fiver sheet is very attractive for the upgrading damaged tunnel due to its good tensile strength, handability and resistance to corrosion. This report is the summary of the applicability of continous carbon fiber sheet for a repair and reiforcement of existing tummel located in Masan. It is the aim of this study to analyze the site data related to consturcion method used carbon fiber sheet.

  • PDF

A Study on the Design/construction Standard of Unlined Tunneling Method (Unlined Tunnel 공법 지보재의 설계 및 시공 기준 고찰)

  • 서영화;김성구;나승훈
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.10a
    • /
    • pp.121-134
    • /
    • 2002
  • Tunneling is a very dangerous and expansive work. Especially, the concrete lining works need many long hours and much cost. As an alternative, the unlined tunneling methods including NMT have been developed in various country. These methods have advantages in cost, time and quality. In Korea, many considerations have been conducted to apply the unlined tunneling method in comparatively good rock. Since primary reinforcements play the role of the final supporting system in unlined tunnels, the initial stiffness and long term durability of reinforcements are very important for tunnel safety. To establish the reinforcements standard suitable to Korea, we investigated the foreign standards and construction cases, comparing geological and construction conditions of foreign land and Korea. As the result, we have proposed the standard of primary supporting system for unlined tunnel in aspects of material, design, construction and quality control etc.

  • PDF

Study on Setting Time Measuring Methods of a Cement Accelerating Admixture (시멘트 급결제의 응결시간 측정방법에 대한 연구)

  • Heo Gweon;Choi Hong Shik;Lee Si Woo;Yi Seong Tae;Jung Yi Seok;Kwak Hong Shin
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.11a
    • /
    • pp.317-320
    • /
    • 2004
  • The setting time is very important factor affecting the quality of tunnel lining and reinforcement of sloped slope etc. Currently, however, the quality criteria of accelerating admixture to improve it is not established well. In this study, evaluation on setting time measuring methods of a cement accelerating admixture was performed. Six types of measuring methods were checked and a proper measuring method of the admixture were proposed as fellows: (1) the temperature of materials used shall be controlled exactly and (2) to evaluate the properties of it, an admixture usage of $5\%$ (ratio of cement weight) is recommended.

  • PDF

Controlling the Hardness and Tribological Behaviour of Non-asbestos Brake Lining Materials for Automobiles

  • Mathur, R.B.;Thiyagarajan, P.;Dhami, T.L.
    • Carbon letters
    • /
    • v.5 no.1
    • /
    • pp.6-11
    • /
    • 2004
  • In spite of unparalleled combination of essential material properties for brake linings and clutch facings, replacement for asbestos is seriously called for since it is a health hazard. Once asbestos is replaced with other material then composition and properties of brake pad changes. In certain cases hardness of the material may be high enough to affect the rotor material. In this study, hardness of the brake pad has been controlled using suitable reinforcement materials like glass, carbon and Kevlar pulp. Brake pad formulations were made using CNSL (cashew net shell liquid) modified phenolic resin as a binder, graphite or cashew dust as a friction modifier and barium sulphate, talc and wollastonite as fillers. Influence of each component on the hardness value has been studied and a proper formulation has been arrived at to obtain hardness values around 35 on Scleroscopic scale. Friction and wear properties of the respective brake pad materials have been measured on a dynamometer and their performance was evaluated.

  • PDF

A Case Study on the Design of Tunnel Excavation in Geological Anomalies (터널굴착시 지질이상대 통과방안 설계사례 연구)

  • Yoo, Joung-Hoon;Kim, Yang-Kyun;Chung, Chul-Hwa
    • Tunnel and Underground Space
    • /
    • v.21 no.5
    • /
    • pp.341-348
    • /
    • 2011
  • As a result of the detailed site investigation performed for the design of a 4.3 km long tunnel, geological anomalies of four fault zones and a rock boundary were discovered on the tunnel route. Most of all, it was confirmed that pyrite, which may corrode steel material, is contained inside the geological anomalies, and pressured ground water flows out of the fault fractured zone. To overcome these geological conditions, antisulfur concrete for the concrete lining and anticorrosive swelling rock bolts are designed in the pyrite-containing sections. For the sections where a great amount of groundwater outflows, water blocking methods including grouting are applied according to the result of numerical analyses on the seepage. In addition, since the past earthquakes occurred around Korea have take place mainly near fault zones, seismic analyses were performed based on the Soil-Structure Interaction (SSI) concept and the strength of concrete tunnel lining is designed to be 27 MPa from 24 MPa in order to reinforce the tunnel structure.

Analysis of stability control and the adapted ways for building tunnel anchors and a down-passing tunnel

  • Xiaohan Zhou;Xinrong Liu;Yu Xiao;Ninghui Liang;Yangyang Yang;Yafeng Han;Zhongping Yang
    • Geomechanics and Engineering
    • /
    • v.35 no.4
    • /
    • pp.395-409
    • /
    • 2023
  • Long-span suspension bridges have tunnel anchor systems to maintain stable cables. More investigations are required to determine how closely tunnel excavation beneath the tunnel anchor impacts the stability of the tunnel anchor. In order to investigate the impact of the adjacent tunnel's excavation on the stability of the tunnel anchor, a large-span suspension bridge tunnel anchor is utilised as an example in a three-dimensional numerical simulation approach. In order to explore the deformation control mechanism, orthogonal tests are employed to pinpoint the major impacting elements. The construction of an advanced pipe shed, strengthening the primary support. Moreover, according to the findings the grouting reinforcement of the surrounding rock, have a significant control effect on the settlement of the tunnel vault and plug body. However, reducing the lag distance of the secondary lining does not have such big influence. The greatest way to control tunnel vault settling is to use the grout reinforcement, which increases the bearing capacity and strength of the surrounding rock. This greatly minimizes the size of the tunnel excavation disturbance area. Advanced pipe shed can not only increase the surrounding rock's bearing capacity at the pipe shed, but can also prevent the tunnel vault from connecting with the disturbance area at the bottom of the anchorage tunnel, reduce the range of shear failure area outside the anchorage tunnel, and have the best impact on the plug body's settlement control.

Development of Composite Fly Ash Pipe (비회 운송용 유리섬유 복합관 개발)

  • Jeong, Gyu-Sang;Won, Sam-Yong;Moon, Jin-Sung
    • Proceedings of the KSME Conference
    • /
    • 2007.05a
    • /
    • pp.33-36
    • /
    • 2007
  • The majority of fly ash pipes in thermal power stations use steel pipes. This makes frequent replacement inevitable due to severe abrasion near the hot and curved section of pipes. Recently, there have been efforts to prevent this abrasion with lining techniques using ceramic or basalt on the inner wall of the pipe. This study uses composite and anti-wear material to maximize the anti-abrasion effects on the hot section of the pipe. The thickness of the abrasion layer was determined by the abrasion ratio of material found through the experiment; the thickness of the reinforcement layer was determined by micromechanics. Experiments were conducted on epoxy resins to test for heat and abrasion. Anti-abrasion test using particle impingement was intended to recreate realistic conditions when abrasion occurs within the hot section of an actual pipe. This study analyzes the abrasion ratio obtained from both the specimen experiment and from on-site measurement and provides evidence that a combination of composites and anti-wear agent can be used to create a fly ash pipe that is lower in costs and higher in quality than what is used currently.

  • PDF

Stability Analysis of Existing Tunnel in Stratified Sedimentary Rocks Subjected to Bridge Pier Load (퇴적암 지역에서의 교각 기초 하중을 받는 기존터널의 안정성에 대한 해석적 고찰)

  • 김교원
    • The Journal of Engineering Geology
    • /
    • v.8 no.2
    • /
    • pp.153-161
    • /
    • 1998
  • An anisotropic characteristics of stratified sedimentary rocks should be considered in the design of tunnel. The second line of Taegu subway is under construction through the sedimentary rocks which is stratified by alternation of shale and sandstone, and Tongsoe over bridge road is planned to be constructed along the subway line. Thus the subway twin tunnels will be subjected by the bridge load of 76.2 MN per pier that will be placed in between the twin tunnels of the subway line. A numerical analysis is carried out for the stability of the twin tunnel, and the result shows that the maximum principal stress of surrounding ground is increased by 5∼6 MPa and the additional displacement of concrete lining is reached up to 8∼10mm due to the external bridge load. For the safety operation of the subway, reinforcement of the tunnel structure is highly recommended.

  • PDF

Behavior of Grouted Bolts in Consideration of Seepage Forces (침투수력을 고려한 전면접착형 록볼트의 거동연구)

  • Lee, In-Mo;Kim, Kyung-Hwa;Shin, Jong-Ho;Park, Jong-Kwan
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.1259-1266
    • /
    • 2005
  • In a NATM tunnel, fully grouted bolts are widely used as part of supporting system. Grouted bolts play an important role not as to take some parts of load acting on a tunnel lining but as to reinforce the ground adjacent the tunnel. In conjunction with tunnel construction, the presence of groundwater may pose a number of difficulties. With respect to tunnel design, influences of groundwater on tunnel behavior have been considered in many aspects. However, the effect on grouted bolts has been rarely investigated. In this study, the behavior of grouted bolts, which are affected by the seepage forces, was examined. To investigate the effects of seepage forces, the theoretical solutions for a drained condition were also found. Based on the theoretical solutions, ground reaction curves considering seepage forces were obtained. By comparing the ground reaction curves supported by grouted bolts with those for the unsupported cases, the effect of reinforcement was evaluated. Finally, through comparison between supported ground reaction curves in the drained condition and those in the case of groundwater flow, it was found that the grouted bolts are more structurely beneficial when the seepage occurs towards the tunnel than when there is no groundwater flow.

  • PDF

Structure stability study for existing subway tunnel segment of Seoul-Busan high-speed railroad (Daegu - Busan) construction (경부고속철도(대구-부산) 도심통과 노반신설 공사중 기존 지하철 터널구간의 구조적 안정성 검토)

  • Kong, Byung-Seung;Kim, Min-Ho
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1752-1759
    • /
    • 2007
  • In the new Seoul-Busan high speed railroad construction specially city center passage roadbed establishment is recommended the staibility for the existing subway tunnel segments of Busan subway line No. 1 and No.2. regarding the appearance condition, a quality condition and the durability of the objective facility site exact inspection, and it evaluates the numerical analysis which uses MIDAS GTS it leads and there is the objective of the place where the stability of the objective facility and this tunnel it investigates. To immediacy of the on-the-spot inspection result whole facility it is a condition where the reinforcement which is simple not to be hindrance is necessary, 2nd Line case it is a condition which transfer is good but the general defect and the damage which occur from the tunnel of NATM type were confirmed part. While roadbed establishment constructing that the continuous maintenance is necessary, it is judged. The result of 1st, 2nd Line maximum sinkage, unequal sinkage and the lining stress of numerical analysis are within permission and the damage degree is appearing with the fact that the degree it will can disregard it is slight. But it enforces necessary Pre-grouting in order to minimize an actual tunnel face conduct and when the tunnel is excavated it is judged with the fact that necessary to minimize the outflow possibility.

  • PDF