• Title/Summary/Keyword: Reinforcement Water

Search Result 473, Processing Time 0.026 seconds

A Study on the Damages of Head Works by the Storm Flood in the Area of Cheong Ju and Boeun -Emphasis onFactors Influenced on the Disasters and their Countermeasures- (淸州 및 報恩地方의 頭首工洪水災害에 關한 調査硏究(II) -災害原因 및 對策方案을 中心으로-)

  • Nam, Seong-Woo;Kim, Choul-Kee
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.24 no.2
    • /
    • pp.49-55
    • /
    • 1982
  • The purpose of this study is to classify the factors influenced on the damages of head works suffered from the storm flood occurred on July 22 1980 in both Musim and Bochong rivers and to find out an integral counter measures against the causes influenced on the disaster of head works in the engineering aspect of planning, design, construction and maintenance. In this survey, number of samples was taken 25 head Works, and the counter measures against the causes of their disasters summarized was as follows, 1. In the aspect of planning a. As the flood water level after the establishment of head works is more increased than the level before setting of head works owing to having more gentle slope of river bed between the head works than nature slope of river bed. Number of head works should be reduced for the appropriate annexation of them b. In the place where head works is established on the curved point of levee, the destruction of levee becomes severe by the strong deflective current. Therefore the setting of head works on the curved point should be kept off as long as possible and in case of unavoidable circumstances the construction method such as reinforced concrete wall or stone wall filed with concrete and anchored bank revetments should be considered. 2. In the aspect of design a. As scoring phenomena at up stream is serious around the weir Where the concentration of strong current is present in such a place, up stream apron having impermeability should be designed to resist and prevent scoring. b. As the length of apron and protected bed is too short to prevent scoring as down stream bed, the design length should be taken somewhat more than the calculated value, but in the case the calculated length becomes too long to be profitable, a device of water cushion should be considered. c. The structure of protected river bed should be improved to make stone mesh bags fixed to apron and to have vinyl mattress laid on river bed together with the improvement for increasing the stability of stone mesh bags and preventing the sucked sand from the river bed. d. As the shortage of cut-off length, especialy in case of the cutoffs conneting both shore sides of river makes the cause of destruction of embankment and weir body, the culculation of cut-off length should be taken enough length based on seepage length. 3. In the aspect of design and constructions a. The overturing destruction of weir by piping action was based on the jet water through cracks at the construction and expansion joints. therefore the expansion joint should be designed and constructed with the insertion of water proof plate and asphalt filling, and the construction joint, with concaved shape structure and steel reinforcement. b. As the wrong design and construction of the weep holes on apron will cause water piping and weir destruction, the design and construction of filter based on the rule of filter should be kept for weep holes. c. The wrong design and construction of bank revetment caused the severe destruction of levee and weir body resulting from scoring and impulse by strong current and formation of water route behind the revetment. Therefore bank revetment should be designod and constructed with stone wall filled with concrete and anchored, or reinforced concrete wall to prevent the formation of water flow route behind the wall and to resist against the scoring and impulse of strong stream. 4. In the aspect of maintenance When the damaged parts occurred at head works the authorities and farmers concerned should find and mend them as soon as possible with mutual cooperation, and on the other hand public citizen should be guided for good use of public property.

  • PDF

Conservation Scheme and Deterioration States of the Wanggung-ri Five-storied Stone Pagoda in the Iksan, Korea (익산 왕궁리 5층 석탑의 훼손현황과 보존방안 연구)

  • Yang, Hee-Jae;Lee, Chan-Hee;Kim, Sa-Dug;Choi, Seok-Won
    • 보존과학연구
    • /
    • s.25
    • /
    • pp.171-195
    • /
    • 2004
  • This research presents an evaluation of the weathering and deterioration state of the Wanggung-ri five-storied stone pagoda in the Iksan (National Treasure No. 289) and suggests conservational schemes. A deterioration map of the pagoda was drawn from the aspects of petrological, physical, chemical, biological, structural and artificial weathering.The rock properties consisting of the pagoda were medium-grained biotite granite that had leucocratic phenocryst developed in parts. The body of each story suffered severely from the secondary contamination that turned the colors into light grey, pitch dark, yellowish brown, and reddish brown as well as granular decomposition, exfoliation and peel-off. The roof stones were heavy exfoliated or peeled off in most of the cases. In addition to the fine cracks, there were layered cracks on the corners. The roof stones of the3rd and 4th story in the north and west side had some stones fall-off, while those of the 2ndstory in the north side had steel reinforcement filled for a fixing purpose. Those of the 5th story showed big gaps that must have originated from cracks and were easily subject to granular decomposition and rainfall. The inside clay filler was missing in the lower part of the roof stones of the 4th and 5th story and the supporting stones, which were thus covered by light grey or pitch dark sediments. The contact area of the materials was about 70 % in the parts where there was a space due to the filler missing and washigher than 90 % in the lower parts of the pagoda. About 90 % or more of the roof stones surface of each story were covered by aerial plants that formed a thick biological mat. Thus it seemed necessary to come up with the conservational measures to remove the plans living on the surface of the stone materials, with the plans to prevent rain from falling inside, and with the water repellent and hardening treatments to postpone the surface weathering of the rock properties. All those measures and plans must be based on the results of long-term monitoring and thorough detail investigations.

  • PDF

A Study on the Shear Behaviors of Geosynthetic-soil Interface in the Waste Landfill Site (폐기물 매립장 차수시설 접촉면 전단특성에 관한 연구)

  • Park, Inn-Joon;Kwak, Chang-Won;Park, Jum-Bum;Cho, Jun-Sik
    • Journal of the Korean Geotechnical Society
    • /
    • v.28 no.3
    • /
    • pp.45-54
    • /
    • 2012
  • Various geosynthetics are widely applied to civil structures and waste landfill site for reinforcement and water resistance. The use of geosynthetics inevitably involves the coupled behaviors of different materials which include large displacement and strain-softening behaviors, etc. In this study, the effect of chemical element in the leachate on the interface shear strength under the cyclic loading condition was analyzed. The Multi-purpose Interface Apparatus (M-PIA) has been modified and cyclic direct shear tests have been performed. The submerging period of each specimen is 200 days. Additionally, the Field-Emission Scanning Electronic Microscopy (FIB) analysis has been also performed to induce the reason of the variation of disturbance function and verify the hypothesis on the decay-proof ability of geosynthetics. Consequently, the charateristics of chemical degradation of geosynthetic-soil interface are verified and the variation of the disturbance function is mainly caused by the different type of soil mineral decay, based on the FIB results.

The Experimental Study on Reinforced Slope with Geocomb (지오콤 비탈면 보호공법의 활용에 관한 실험적 연구)

  • Ahn, Won Sik;Kim, Chul Moon;Kim, Ug Ki;Kim, Young Sub
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.1
    • /
    • pp.37-43
    • /
    • 2012
  • Generally levee or revetment becomes weak by erosion (scour) due to saturation of ground with infiltration, flowing water. So when levee or revetment is constructed, slope reinforcement must be installed to prevent failure. In this study experimental test was performed for verifying shear resistance, horizontal permeability and rooting ability of Geocomb designed to address the shortcomings of 3-dimension Geocell. Geocomb is one of geosynthetics and the advanced system of geogrid. According to the results of shear test, internal friction angle of reinforced ground with Geocomb was increasing compared with existing material and horizontal permeability of ground with Geocomb was bigger than geocell, porous geocell reinforcing ground. Lastly rooting ability of geocomb is most excellent. These results determined for the inner surface of the cell is net structure.

Evaluation of Pile Spacing Ratio of Stabilizing Piles for Ground Destruction Reduction at the Time of Soft Ground Excavation (연약지반 굴착시 지반파괴 저감을 위한 억지말뚝의 간격비 평가)

  • Kim, Jae-Hong
    • Journal of the Korean Geotechnical Society
    • /
    • v.32 no.7
    • /
    • pp.47-56
    • /
    • 2016
  • In the case of excavating ground backfilled with soft ground, ground destruction occurs owing to the discharge of groundwater from excavated back ground in spite of earth retaining wall. To minimize this, indoor model test was implemented applying stabilizing pile as a solution for ground destruction. The unreinforced case was compared with the reinforced case and the comparison demonstrated that the ratio of the gap in settlement of the two cases is about three to one, which proves the reinforcement effect (Kim, 2014). This study has carried out the evaluation of appropriate pile spacing ratio, according to the confirmed effect of stabilizing pile. In the evaluation test the case with pile spacing ratio of 0.66 (5 stabilizing piles) was compared with that of 0.76 (3 stabilizing piles), and it has been shown that applying stabilizing pile has effect on ground destruction reduction, but may rather work as load when pile spacing ratio is narrower than a certain interval. So it was found that adjustment for appropriate pile spacing ratio is required at the stage of design. This study has shown that the pile spacing ratio is appropriate at around 0.7~0.8, which reduces ground destruction and does not function as the load of excavated back ground.

Evaluation of Crack Control and Permeability of Hydrophilic PVA fiber Reinforced Cement Composite (친수성 PVA 섬유보강 시멘트 복합체의 균열제어 및 투수성 평가)

  • Won Jing-Pil;Hwang Keum-Sik;Park Chan-Gi;Park Hae-Geun
    • Journal of the Korea Concrete Institute
    • /
    • v.16 no.3 s.81
    • /
    • pp.391-396
    • /
    • 2004
  • Plastic shrinkage crack occurs at the exposed surfaces of freshly placed concrete due to consolidation of the concrete mass and rapid evaporation of water from the surface. This so-called shrinkage crack is a major concern for concrete, especially for flat structures such as pavements, slabs for industrial factories and retaining walls. This study has been performed to obtain the plastic shrinkage and the permeability of hydrophilic poly vinyl alcohol(PVA) fiber reinforced mortar and concrete. Test results indicated that PVA fiber reinforced cement composite showed an ability to reduce the total crack area and the maximum crack width (as compared to plain and polypropylene fiber reinforced concrete). Also, according to the permeability test result, it was found that PVA fiber reinforced cement composite was more reducing than polypropylene fiber reinforced cement composite.

Comparison of Critical Tractive Forces for Application of Soil Improvement Material to Bank Revetment Work (호안 제방사면 보강을 위한 지반개량재의 한계소류력 비교)

  • Kim, You-Seong;Kim, Jae-Hong;Seo, Se-Gwan;Bhang, In-Hwang
    • Journal of the Korean Geotechnical Society
    • /
    • v.31 no.2
    • /
    • pp.65-73
    • /
    • 2015
  • The bank revetment work which is conducted on the slope of river bank to protect against flowing water as a geotechnical structure has been applied as an average value of critical tractive force based on domestic and international standard design. Currently, an appropriate evaluation is needed for the hydraulic stability and geotechnical behavior analysis of bank revetments because of the effects of climate change and ambiguous design criterion. This study has compared the critical tractive forces of soil improvement material and conventional materials used for the bank revetment work. Through various experiments, the shear strength of mixtures with soil improvement material was investigated by curing time and mixture ratio. It was found that the critical tractive force of the mixture obtained from a scour test is suitable to the reinforcement of the slope of river bank which has problems such as seepage erosion and scour.

A Study on the Estimation of Corrosion Protection Performance of Concrete Containing Ground Granulated Blast-Furnace Slag for Massive Coastal Structures (매시브한 해양구조물 적용을 위한 고로슬래그 혼입 콘크리트의 방청성능 평가에 관한 연구)

  • Yoo, Jae-Kang;Kim, Dong-Suk;Park, Sang-Joon;Won, Chul;Lee, Sang-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.11a
    • /
    • pp.87-91
    • /
    • 2002
  • This paper investigates the corrosion inhibition and the reduction of hydration heat properties of Ground Granulated Blast-Furnace Slag (GGBFS) added concrete. Since the massive civil structure is vulnerable to the thermal crack by hydration. adiabatic temperature rising tests were performed for water-binder ratios from 43.2% to 47.3%, while replacing 15% to 50% of cement with GGBFS of equal weight. Then, the corrosion protection performance was evaluated using cylindrical specimens embedded with steel reinforcement according to the combination of 3 W/B ratios and 2 levels of chloride ion quantity. The corrosion area of the embedded steel ban was determined using the high pressure steam curing method specified in KS F 2561. The test results showed that the replacement of GGBFS was effective in reducing the hydration heat. The corrosion area of the embedded steel ban decreased as the replacement of GGBFS increased. However, the corrosion area of the steel bar was proportional to the autoclave cycle and the chloride ion quantity. Among the tested specimens, compressive strength, reduction of hydration heat, and corrosion inhibition performance were excellent when 50% of cement was replaced with GGBFS of equal weight.

  • PDF

A Study on Application and Performance Verification of Aged Reservoir Reinforcing Method using Ground Injection Material of Utilizing Circulation Resources. (순환자원 활용 지반차수재의 노후저수지 보강 적용사례 및 성능검증에 관한 연구)

  • Park, Seong-hun;Seo, Se-Gwan;Song, Sang-Hwon
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.22 no.3
    • /
    • pp.17-24
    • /
    • 2020
  • Reservoirs, which make up most of South Korea's reservoirs, are located in rural areas. In the case of rural reservoirs, about 75% have been reported over 50 years old aged reservoirs constructed before the 1960s. Reservoirs are important facilities that store and supply water necessary for daily life. However, if it is destroyed, the reservoir can cause a lot of damage, so continuous management is necessary. As a method for strengthening old reservoirs, a method using cement has been widely applied. However, OPC is a product that uses a lot of carbon dioxide and natural resources. Therefore, the amount of cement should be reduced. Against this background, in this study, the ground injection material of utilizing circulation resources was applied to the site. Applied reservoirs have been around for 75 years and leaks have occurred in some sections. The application method was constructed in two rows, up to a depth of 12m. After reinforcement, the electrical resistivity test was conducted three times. As a result, similar resistance was shown at 1 month after construction. And after 6 months, the saturation area decreased. And the performance after reinforcing the aged reservoir was examined. As a result of the review, this study confirmed that the applicability was equivalent to that of OPC, and the excellent performance of reinforcing the aged reservoir was shown.

Changes in Plant Species on a Grass Roof over Time (초지지붕에서의 시간경과에 따른 식생변화)

  • Lee, Young-Moo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.34 no.6 s.119
    • /
    • pp.39-53
    • /
    • 2007
  • Unlike conventional roof landscaping, where various kinds of plants and structures are employed, a grass roof is a roof on which herbaceous plants are grown in planting medium and which is not accessed or maintained, mainly because it doesn't have sufficient load capacity to support a regular roof garden. They are mostly built on existing roofs, whether flat slab or gabled. Planting on roofs has numerous advantages, such as creating a biotope, purifying urban air, adding moisture to the atmosphere, storing rain water, preventing flash floods, reducing energy use for heating and air conditioning, enhancing the urban landscape and providing relaxation to the city dwellers, not to mention the alleviation of global warming by absorbing $CO_2$. In addition to the general merits of roof planting, the grass roof has its own unique qualities. Only herbaceous species are planted on the roof, resulting in light weight which allows roofs of existing buildings to be planted without structural reinforcement. The species chosen are mostly short, tough perennials that don't need to be maintained. These conditions provide an ideal situation where massive planting can be done in urban areas where roofs are often the only and definitely the largest space available to be planted. If roofs are planted on a massive scale they can play a significant role in alleviating global warming, heat island effects and energy shortages. Despite the advantages of grass roofs, there are some problems. The most significant problem is the invasion of neighboring plants. They may be brought in with the planting medium, by birds or by wind. These plants have little aesthetic value comparing to the chosen species and are usually taller. Eventually they dominate and prevail over the original species. The intended planting design disappears and the roof comes to look wild. Since the primary value of a grass roof is ecological, a change in attitude towards what constitutes beauty on the roofscape is necessary. Instead of keeping the roof neat through constant maintenance, people must learn that the wild grass with bird's nests on their roof is more beautiful as it is.