• Title/Summary/Keyword: Reinforcement Water

Search Result 473, Processing Time 0.024 seconds

Results of Delamination Tests of FRP- and Steel-Plate-Reinforced Larix Composite Timber

  • LEE, In-Hwan;SONG, Yo-Jin;SONG, Da-Bin;HONG, Soon-Il
    • Journal of the Korean Wood Science and Technology
    • /
    • v.47 no.5
    • /
    • pp.655-662
    • /
    • 2019
  • This study evaluated the multi-bonding performances of timbers as well as those of reinforcement and timber to obtain data for preparing guidelines regarding the use of timbers as large structural members. For the multi-bonding performances of timbers, four types of bonding surfaces were prepared according to the pith position. For the bonding performances of FRP (fiber-reinforced plastic)/steel plate and timber, a total of 11 types of specimens were produced for the selection of the appropriate adhesive. The bonding performances of the produced specimens were evaluated through a water soaking delamination test, a water boiling delamination test, and a block shear strength test. The test results showed that the bonding strength of the bonding surface according to the pith position was highest in the specimen for which the two sections with the pith at the center of the cross-section on timber and between the bonding surfaces (the tangential and radial sections were mixed) were bonded. Furthermore, the specimens for which the section (radial section) with the pith on the bonding surface of the timber was bonded showed a high delamination percentage. The results of the block shear strength test showed that the bonding section did not have a significant effect on the shear strength, and that the measured wood failure percentage was higher than the KS standard value. The PVAc adhesive showed the highest bonding strength between larix timber and GFRP (glass FRP). Furthermore, the epoxy and polyurethane adhesives showed good bonding strength for CFRP (carbon FRP) and structure steel, respectively.

Case Study on the Explosive Demolition of the KOGAS Office Building in Bundang District (한국가스공사 분당사옥 발파해체 시공사례)

  • Kim, Sang-min;Park, Keun-sun;Son, Byung-min;Kim, Ho-jun;Kim, Hee-do;Kim, Gab-soo
    • Explosives and Blasting
    • /
    • v.36 no.4
    • /
    • pp.48-61
    • /
    • 2018
  • This case study is concerned with the project of the explosive demolition for the KOGAS office building located in Bundang district in Seongnam city. Since the office building was a kind of long-span beam structures, a mechanical demolition method using jacking support systems was considered in the beginning of the project. With consideration of the excessive reinforcement cost, uncertainty of safety, and prolonged construction period, however, the original plan was later changed to use an explosive demolition method. For the purpose of protecting nearby buildings and facilities during the collapse process, the explosive initiation sequence was elaborately designed to bring down the building structure towards its front left corner. A total of over 550 electronic detonators (Unitronic 600) was used to sequentially initiate the explosives installed at appropriate columns in the first, second, and fifth floors. To diminish dust production, water bags of small and large sizes were respectively installed at each column and on the floors to be blasted. As such, every effort was exercised to mitigate overall noise, dust, and shock vibrations that could be generated during the explosive demolition process for the office building.

Shallow ground treatment by a combined air booster and straight-line vacuum preloading method: A case study

  • Feng, Shuangxi;Lei, Huayang;Ding, Xiaodong;Zheng, Gang;Jin, Yawei
    • Geomechanics and Engineering
    • /
    • v.24 no.2
    • /
    • pp.129-141
    • /
    • 2021
  • The vacuum preloading method has been used in many countries for soil improvement and land reclamation. However, the treatment time is long and the improvement effect is poor for the straight-line vacuum preloading method. To alleviate such problems, a novel combined air booster and straight-line vacuum preloading method for shallow ground treatment is proposed in this study. Two types of traditional vacuum preloading and combined air booster and straight-line vacuum preloading tests were conducted and monitored in the field. In both tests, the depth of prefabricated vertical drains (PVDs) is 4.5m, the distance between PVDs is 0.8m, and the vacuum preloading time is 60 days. The prominent difference between the two methods is when the preloading time is 45 days, the injection pressure of 250 kPa is adopted for combined air booster and straight-line vacuum preloading test to inject air into the ground. Based on the monitoring data, this paper systematically studied the mechanical parameters, hydraulic conductivity, pore water pressure, settlement and subsoil bearing capacity, as determined by the vane shear strength, to demonstrate that the air-pressurizing system can improve the consolidation. The consolidation time decreased by 15 days, the pore water pressure decreased to 60.49%, and the settlement and vane shear strengths increased by 45.31% and 6.29%, respectively, at the surface. These results demonstrate the validity of the combined air booster and straight-line vacuum preloading method. Compared with the traditional vacuum preloading, the combined air booster and straight-line vacuum preloading method has better reinforcement effect. In addition, an estimation method for evaluating the average degree of consolidation and an empirical formula for evaluating the subsoil bearing capacity are proposed to assist in engineering decision making.

Evaluation of the past and future droughts using Standardized Precipitation Index (SPI) and Effective Drought Index (EDI) in the western region of Chungnam Province (SPI와 EDI를 이용한 충남 서부지역 과거와 미래 가뭄 평가)

  • An, Hyowon;Ha, Kyoochul
    • Journal of Soil and Groundwater Environment
    • /
    • v.25 no.4
    • /
    • pp.14-27
    • /
    • 2020
  • The drought has occurred from the past, and has caused a lot of damage. It is important to analyze the past droughts and predict them in the future. In this study, the temperature and precipitation of the past and the future from climate change RCP 4.5 and 8.5 scenarios were analyzed for Seosan and Boryeong in the western region of Chungnam Province, which is considered as a drought-prone area on the Korean Peninsula. Comparing Standardized Precipitation Index (SPI) and Effective Drought Index (EDI) based on the past droughts, EDI was verified to be more suitable for the drought assessment. According to RCP 4.5, the frequency and intensity of droughts in the early future (2021~2060) were expected to increase and to be stronger. Particularly, severe droughts were predicted for a long time from 2022 to 2026, and from 2032 to 2039. Droughts were expected to decrease in the late future (2061~2100). From RCP 8.5, drought occurrences were predicted to increase, but the intensity of the droughts were expected to decrease in the future. As a result of evaluation of the frequencies of droughts by seasons, the region would be most affected by fall drought in the early future and by spring drought in the late future according to RCP 4.5. In the case of RCP 8.5, the seasonal effects were not clearly distinguished. These results suggest that droughts in the future do not have any tendency, but continue to occurr as in the past. Therefore, the measures and efforts to secure water resources and reinforcement of water supply facilities should be prepared to cope with droughts.

Relationship Analysis between Half Cell Potential and Open Circuit Potential Considering Temperature Condition (온도 영향을 고려한 RC 구조의 반 전위 및 OCP의 상관성 분석)

  • Yoon, Yong-Sik;Kwon, Seung-Jun
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.10 no.1
    • /
    • pp.124-132
    • /
    • 2022
  • The corrosion potential in concrete varies greatly with exposure and concrete mix conditions. In this study, RC (Reinforcement Concrete) samples were prepared considering cover depth, chloride concentration, and W/C(water to cement) ratio as variables, and HCP(Half Cell Potential) was measured, which evaluated comparative potential between embedded steel and concrete surface. In addition, OCP(Open Circuit Potential) was measured using buried steel and CE(Counter Electrode). Agar and NaOH solution were used as ion exchange materials and Hg/HgO was used for RE(Reference Electrode), which was more sensitive to temperature than HCP. Among the influencing factors, the exposure period and chloride concentration had a relatively greater effect than cover depth and w/c ratio. Additionally, the entire measured HCP and OCP showed a clearly linear relationship with increasing cover depth and w/c ratio. Through multiple regression analysis, the relationship between HCP and OCP was quantified, and an improved correlation was obtained with temperature effect.

Improvement of the Priority Index for Choice between Repair and Reinforcement Methods of Dam and River Facilities (댐·하천 시설물 보수·보강공법 선정을 위한 우선순위지수 산정식 개선방안 연구)

  • Kim, Dong Hyun;Youn, Hee Jung;Yoo, Hyung Ju;Lee, Seung Oh
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.234-234
    • /
    • 2021
  • 국내 기반시설의 대부분은 1970년대 경제성장기에 건설되어 사용연수가 30년 이상 경과하였고 급격한 고령화가 진행 중이다. 1990년대 성수대교와 삼풍백화점의 붕괴는 시설물 유지관리의 중요성에 대한 전국민적 관심을 집중시켰고, 이에 정부는 1995년 「시설물의 안전관리에 관한 특별법」 제정을 시작으로 현재까지 다양한 정책 및 기준을 수립해왔다. 일반적으로 안전점검 및 정밀안전진단 등을 수행하여 시설물의 안전등급을 평가하고 결함에 대한 보수·보강을 실시하여 시설물을 유지·관리하고 있다. 그러나 유지관리 예산은 한정적이기 때문에 모든 결함에 대한 보수·보강 사업을 실시할 수 없는 실정이다. 이에 보수·보강 조치의 우선순위를 선정하는 것이 필요하며, 관련 법령 세부지침에는 부재의 중요도, 결함의 심각성, 경제성을 고려한 우선순위지수(PI, Priority Index)를 제시하고 있다. 이 식은 전문가의 주관적인 판단에 의해 영향도를 50~100%범위 안에서 조정할 수 있으며, 일부 특정 부재는 동일한 가중치가 설정되어 있다. 또한 결정적으로 보수보강을 통한 효과를 효율적으로 고려하지 못하고, 대부분 경제성에 의해 우선순위가 결정되는 한계점이 발생한다. 따라서, 본 연구에서는 몇 가지 사례분석을 통해 현재 우선순위지수에 대한 문제점을 고찰하고 이를 개선할 수 있는 우선순위 산정식(PI)을 제시하였다. 과거 유지관리 시행 초기에는 보수보강 사례가 부족하였지만 현재는 수십년간의 축적된 자료를 바탕으로 제시된 산정식을 충분히 활용할 수 있을 것으로 판단된다. 향후 보수보강 효과를 정량화하는 방법에 대한 추가적인 연구가 수행된다면 더욱 경제적인 측면에서 우선순위를 산정할 수 있을 것이며 노후화된 기반시설 유지관리방안에 효과적으로 사용될 것으로 기대된다.

  • PDF

Project of Dam Safety reinforcement on Gampo Dam (감포댐 안전성강화 사업)

  • Cheon, Geun Ho;Han, Yong Hun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.214-214
    • /
    • 2022
  • 감포댐은 2006년 준공하여 각종 시설 및 설비의 노후화가 진행중에 있으며, 최근 감포댐 인근 지역에서 발생한 경주지진(규모 5.8) 및 포항지진(규모 5.4)이 발생하여 지진시 시설물의 안전성에 대해 중요성이 대두되고 있었다. 이에 감포댐 안전성강화 사업을 추진하게 되었고, 주요 사업내용은 취수탑 관리교 내진보강, 댐체 심벽보강을 통한 댐체 안전성확보, 비상방류시설 개선이다. 취수탑 관리교는 교각단면의 변위연성도 및 교량받침에 의한 구조물 안전성 평가를 시행하였고, 단면강도는 모멘트-곡률해석법에서 탄성영역의 단면강도 대비 탄성지진력을 비교하여 안전성을 검토하였다. 검토결과 교량받침의 내진성능은 부족한 것으로 검토되어 유량제어형 멀티펌프와 안전잭을 이용한 변위제어 방식의 교량동시 인상공법이 가능하고 인상정밀도 ±0.5mm이내의 성능을 가진 교량인상공법 적용하여 보강을 하는 것으로 계획하였다. 댐체 심벽보강을 위해 먼저 전기비저항탐사를 수행하여 전기비저항대를 탐사하여 심벽부에서 포화대가 형성된 부위를 조사하였다. 그리고 댐 상·하류에 전극을 설치하고 전류를 발생시켜 측정 지점별 자기장을 측정을 통하여 댐체내 침투에 따른 유로 형성여부 파악을 위한 전자기장탐사를 시행하였다. 마지막으로 심벽 시추조사를 시행하여 공내수를 조사하였다. 조사결과 포화대의 위치 및 이상대가 다양한 것으로 나타났으며, 이는 불특정 지점에 연약대가 존재한다 판단하여 심벽부 보강계획을 전반적으로 적용하는 것으로 결정하였다. 비상방류시설은 최근 15년 실측자료의 홍수기(6~9월) 평균유입량을 적용하여 검토하였으며 검토결과 배제대상 높이 75%까지는 3.7일, 완전배제까지는 11.2일이 걸려 댐설계기준을 충족하는 것으로 검토되다. 다만 감포댐 비상방류시설이 하천제방과 직각방향으로 형성되어 있고, 하천의 폭이 좁아 과거 방류시에도 제방을 월류하는 것으로 조사되어 하천의 세굴을 방지하고 제방 안전성을 확보하기 위하여 비상방류시설에 감세공을 설치하고, 제방에 디플렉터 옹벽을 설치하는 것으로 계획하였다. 감세공은 2번에 걸친 감세효과로 방류시 하류바닥 및 옹벽 보호 효과가 큰 미국 USBR의 TypeVI를 적용하였으며, Flow-3D 모델링을 통하여 제방에 월류가 발생하지 않는 최적의 대안 옹벽규모를 산정하였다.

  • PDF

Dynamic Behavior of Pier-Type Quay Walls Due to Ground Improvement During Earthquakes (지진 시 지반개량에 따른 잔교식 안벽의 동적 거동)

  • Hyeonsu Yun;Seong-Kyu Yun;Gichun Kang
    • Journal of the Korean Geosynthetics Society
    • /
    • v.23 no.2
    • /
    • pp.29-42
    • /
    • 2024
  • The 2017 Pohang earthquake caused damage to quay structures due to liquefaction. Liquefaction occurs when effective stress is lost due to an increase in excess pore water pressure during an earthquake. As a result, the damage caused to the pier-type quay wall was identified and the damage caused by liquefaction was analyzed. In addition, in the case of improved ground, damage occurred due to liquefaction of the lower sand layer due to the difference in stiffness from the soft rock layer, so additional numerical analysis was performed assuming non-liquefaction ground. There are several factors that affect the increase in excess pore water pressure ratio, such as the relative density of the ground and the magnitude of the input seismic acceleration. Therefore, this study performed numerical analysis for Cases 1 to 3 by increasing the magnitude of the input acceleration, and in the case of improved ground, damage occurred due to liquefaction of the lower sand layer, so the analysis was performed assuming non-liquefaction ground. As a result, the improved ground requires additional reinforcement when there is liquefied ground below, and the horizontal displacement of the pier-type quay piles was reduced by about two times.

Experimental Study on Reinforcement Effect of Geosynthetics for Surplus Soil, an Unsuitable Fill Material (성토재료로 부적합한 현장 발생토의 토목섬유 보강효과에 관한 실험적 연구)

  • Hong, Young-Suk;Im, Jong-Chul;Kang, Sang-Kyun;Yoo, Jae-Won;Kim, Chang-Young
    • Journal of the Korean Geosynthetics Society
    • /
    • v.17 no.1
    • /
    • pp.11-20
    • /
    • 2018
  • Surplus soil is commonly used at construction sites, because suitable fill material is not always immediately available and leads to additional costs. However, most surplus soils do not meet the requirement of suitable fill material to achieve the stability and strength of embankments. In this study, Proctor compaction tests and field compaction tests were performed by installing geosynthetics to resolve the problems caused by compacting unsuitable soils. Compaction energy and the number of geosynthetics were changed under the type A- and D- and type A Proctor compaction tests (KS F 2312), respectively. The field compaction testing using geosynthetics was performed on surplus soils of high water content. Optimum water content and maximum dry density of compacted soil decreased and increased by reinforcing geosynthetics, respectively. Compaction curves behaved with geosynthetics as the compaction curves behaved with higher compaction energy. Efficient compaction was possible because the compaction energy increased to 2.10 and 2.71 times the compaction energy required to achieve the same maximum dry density with one and two geosynthetic layer(s), respectively. Furthermore, field compaction tests verified that efficient compaction was possible because the dry density of unsuitable surplus soils of high water content was increased by reinforcing geosynthetics.

Weathering Properties and Slope Stability Evaluations of Bedrock under the Chokseongnu Pavilion, Jinjuseong Fortress, Korea (진주성 촉석루 성곽지반의 풍화특성과 사면안정성 평가)

  • Jo, Young-Hoon;Lee, Myeong-Seong;Lee, Sun-Myung;Lee, Chan-Hee
    • Journal of Conservation Science
    • /
    • v.20
    • /
    • pp.89-103
    • /
    • 2007
  • The bedrock beneath the Chokseongnu pavilion consists of sandstone with alternate dark-gray to light-brown siltstone and dark-gray shale of the Jinju Formation, where bedding is well developed toward the Chokseongmun gate. Large to small joints and overbreak from the erosion weathering have been developed in the bedrock. Besides, water leakage from development of discontinuity planes, fragmentation of shale, crack and joint by tree roots are observed on the bedrock. While shale and siltstone showed high sensitivity in physical and chemical weathering, respectively, sandstone indicated the highest weathering sensitivity in both. As the results of structural stability analysis, the whole bedrock has high instability in wedge failures, and especially section No. II slope is more instable than section No. I. Therefore, it is necessary for the bedrock to be strengthened by improvement method for soft foundations and the surface reinforcement. The trees causing mechanical collapse of the bedrock should be also removed and a water flow prevention measure or a water exhaust are required.

  • PDF