• 제목/요약/키워드: Reduction of construction costs

검색결과 166건 처리시간 0.025초

도시지역 CSOs 저감을 위한 저류조 및 이송관로의 최적 용량결정에 관한 연구 (Study on the determination of optimum size of storage tank and intercepting capacity for CSOs reduction in urban area)

  • 이관용;최원석;이용재;구원석;송창수
    • 상하수도학회지
    • /
    • 제26권6호
    • /
    • pp.735-745
    • /
    • 2012
  • Storage method is one of major measures for reduction of CSOs pollutant loads and several projects have been done nationwide. But systematic analysis of intercepting capacity has not been studied to determine optimum size of storage facility. In this research, not only storage volume but also intercepting capacity which means flow capacity from intercepting facility to CSOs storage facility was studied and optimum sizing method for storage facility was proposed. The result shows that pollutants reduction efficiency can be increased significantly by increasing intercepting capacity and it might reduce storage volume and total construction costs. Intercepting capacity for the study area was evaluated and it was shown as equivalent to 83 % probability rainfall intensity.

동절기 고강도콘크리트의 시공에 있어서 초기동해 방지에 관한 실험적 연구 (An Experimental Study on the Early Frost Resistance Properties of High-Strength Concrete in Winter Concreting)

  • 권영진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2001년도 학술논문발표회
    • /
    • pp.76-81
    • /
    • 2001
  • Recently, the structure is higher and larger, so that the application of high-strength concrete is increased, And as the development of construction skills, it is possible to place during the winter. Concrete work during winter is indispensible to shorten time of completion and cut costs. When concrete work during winter is placed, it has anxiety that concrete freeze at low temperature. As repetition of concrete's freezing cause reduction of durability, it is necessary for mixing to pay attention to air content and W/C ratios. Accordingly, in this study, we estimate the frost resistance by air content and W/C ratios, and development of strength after early-frost damage in the high-strength concrete during the cold weather. In this study, it could be confirmed that factors which were air content, W/C ratios and early curing period, affected on the frost resistance.

  • PDF

PC 부재의 현장 생산효과 분석 (In-situ Production Effect Analysis of Precast Concrete Elements)

  • 이동주;오진혁;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 가을 학술논문 발표대회
    • /
    • pp.52-53
    • /
    • 2021
  • PC (Precast Concrete) method was preferred for reasons such as shortening of construction period, cost reduction, and quality. However, in the case of factory production, precast concrete has a problem in that transportation conditions in the transportation process, damage during transportation, overhead and profit of the factory are required. If work and PC members are produced on site, transportation and installation costs can be reduced. However, research on field production has not been conducted. Therefore, based on the on-site production plan without PC, the cost and quality of factory production and on-site production are compared and analyzed.

  • PDF

Mechanized tunnels lining prefabricated segments production methods

  • Elaheh Banihashemigargari;Amir H. Rezaeifarei
    • Geomechanics and Engineering
    • /
    • 제32권5호
    • /
    • pp.503-512
    • /
    • 2023
  • In tunneling projects, a significant part of the costs is spent on segment production. By more economically producing, the cost of tunnel construction can be greatly reduced, especially in long and large-diameter tunnels. In the present study, the effect of using the Carousel method in the improvement of the production system performance compared to the conventional Static system has been studied. To carry out the research, a quantitative comparison of cost and production time was carried out for two production methods using the available documentation. The opinions of experts have been obtained using questionnaires and qualitative comparison of cost, time and production quality was done by implementation of statistical analysis. The SPSS software and the univariate t-test were used to analyze the questionnaires. According to the results of statistical analysis with SPSS, the use of the Carousel method will reduce production time and costs along with increasing manufacturing quality. According to the documentation analysis, the Carousel method reduces the cost of production by almost 30% and leads to a reduction of the production time to approximately 40% of the Static moulds system. The Carousel method has a higher production rate, efficiency, and better performance. Research into quantifying the benefits of Carousel method in the production system performance is very limited. This comparison is based on real information from the under construction Tabriz Metro project. This article can be very helpful in choosing the best production method.

공공 건축물 지열에너지설비 적용에 따른 경제성 분석 (Economic Analysis of Geothermal Energy Facilities Applied to Public Buildings)

  • 장영준;김상용;신윤석;김광희
    • 한국건축시공학회지
    • /
    • 제14권5호
    • /
    • pp.423-432
    • /
    • 2014
  • 본 연구는 건축물 계획단계에서 적용될 지열에너지설비 적용에 있어 효율적인 방안을 제시하려한다. 보다 신뢰성 있는 경제성 평가의 기준제시를 위해 신재생에너지 설비의 공사 내역서를 바탕으로 수선주기, 교체주기를 반영한 유지관리비용과 실질적인 신재생에너지설비 설치를 위한 설계도서에 의한 초기공사비를 산출하여 생애주기비용분석에 사용하였다. 도출된 결과는 건축물 계획단계에서 경제적인 지열에너지설비를 선정하는데 도움이 될 것이라 생각한다.

Lessons learned from Multinational Parties Involved Program Management Consortiums in Korea

  • KO, Ok-Yeol
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.32-36
    • /
    • 2015
  • This study explores the issue of program management consortia involving multinational participants. The aim of this research was to leverage advantages in program management (PM) skills and PM model improvement in product line construction in mega scale construction programs, typically funded by public funds. Such ventures involve multinational parties using dedicated partnering based on a program management consortium (PMC) to reduce confrontation between parties in complex circumstances, allowing an open and non-adversarial approach to project management. This research also seeks to implement an ongoing feedback program of best practices and lessons learned to minimize the repetition of mistakes and to reduce costs in sequenced construction. Recently, the Korean government has planned to undertake three large new projects: the Korean Peninsula major river maintenance, the reclamation of Se-Mangum, and the Science/Business City. This paper starts by providing a framework for the cost-reduction strategy for the United States Forces Korea (USFK) Relocation Program, which will be funded with public funds and a private fund investment (PFI) that combines programs executed by two governments as owners and multinational stakeholders, joined in the PMC. The establishment of project-oriented consortia is an innovative and non-adversarial approach to massive international construction projects. Such projects have used various tools effectively and skillfully. This experience may offer an opportunity to practice new and advanced program management delivery methods, and it is expected that Korea will gain a competitive advantage in the international construction market.

  • PDF

A Study on Transportation Optimization and Efficient Production Method of Raw Materials for Pellet for Construction of Supply Chain Management

  • Choi, Sang Hyun;Lee, Jae Hwan;Bakyt, Bekzhanov;Woo, Jong Choon
    • Journal of Forest and Environmental Science
    • /
    • 제32권2호
    • /
    • pp.173-181
    • /
    • 2016
  • This study designed a model of the efficient production schemes and raw materials transportation optimization of current South Korean's simple and monolithic distribution system of wood to build a SCM (supply chain management) as a basic level to establish a distribution of future by pellet production of raw materials costs and reduce transport costs, and specifically to forest of pallet to contribute to revitalizing the market. The result of each transportation costs after building the best transportation network from raw material supply area to demand area applying transport law was 964,600 thousands Won from 6 supply areas to 7 demand areas. And the result of each model's analysis to get the pellet's efficient production through production cost reduction showed that it reduced from 325,701 Won/t to 240,106 Won/t, results of existing efficient pellet for the production model 8,233 tons over 20,000 tons annual production capacity from the size of the expanded production capacity when the expansion. However, when the production size expanded to 50,000 Tons of the production, the effect was very small even though production cost decreased.

대학 건물에 설치된 가스엔진구동 히트펌프(GHP) 실외기의 조닝 계획에 따른 운전 특성과 경제적 효과 (The Economic Effects and Operating Characteristics of the Outdoor Unit in Accordance with Zoning Plan of Gas Engine Driven Heat Pump Installed in the University Building)

  • 박강현;김수민
    • 설비공학논문집
    • /
    • 제24권1호
    • /
    • pp.70-76
    • /
    • 2012
  • The purpose of this study is to analyze of the operating characteristics of the Gas engine driven Heat Pump(GHP) and to reduce maintenance costs through the most Economical plan. As the zoning modifications that have economic effects were confirmed. Applications should be made with a similar purpose of the space. The combination of a modified space has led to reduced operating hours of the outdoor unit. The reduction of the outdoor unit operating hours, reducing maintenance costs accordingly. When analyzed at six years have elapsed, the amount of savings through zoning modifications is more than an additional construction cost. During the design phase, cost-effective operation of the GHP is required for the proper zoning plan.

Improving safety performance of construction workers through cognitive function training

  • Se-jong Ahn;Ho-sang Moon;Sung-Taek Chung
    • International journal of advanced smart convergence
    • /
    • 제12권2호
    • /
    • pp.159-166
    • /
    • 2023
  • Due to the aging workforce in the construction industry in South Korea, the accident rate has been increasing. The cognitive abilities of older workers are closely related to both safety incidents and labor productivity. Therefore, there is a need to improve cognitive abilities through personalized training based on cognitive assessment results, using cognitive training content, in order to enable safe performance in labor-intensive environments. The provided cognitive training content includes concentration, memory, oreintation, attention, and executive functions. Difficulty levels were applied to each content to enhance user engagement and interest. To stimulate interest and encourage active participation of the participants, the difficulty level was automatically adjusted based on feedback from the MMSE-DS results and content measurement data. Based on the accumulated data, individual training scenarios have been set differently to intensively improve insufficient cognitive skills, and cognitive training programs will be developed to reduce safety accidents at construction sites through measured data and research. Through such simple cognitive training, it is expected that the reduction of accidents in the aging construction workforce can lead to a decrease in the social costs associated with prolonged construction periods caused by accidents.

공동주택 타일공사의 하자 유형 분석 및 저감 대책에 관한 연구 (A Study on Analysis of Defect Types and Measures for Reduction of Tile Construction for Apartment Houses)

  • 박현정;엄용빈;정우진;김대영
    • 한국건축시공학회지
    • /
    • 제21권6호
    • /
    • pp.701-712
    • /
    • 2021
  • 국내의 주택 부족 문제가 해소되면서 공동주택 건설시장이 고품질을 원하는 소비자 위주의 시장으로 변화되었고, 마감 품질에 대한 기대가 높아졌다. 한국토지주택공사가 공급한 공동주택의 하자 민원 발생 접수 현황에 따르면, 타일 관련 민원이 가장 많이 발생하였다. 이와 관련된 하자 민원을 줄이기 위해 국토교통부에서는 「공동주택 하자의 조사, 보수 비용 산정 및 하자판정기준」 개정안을 입안하는 등 지속적인 노력을 하고 있으나, 예방적 처리 방안에 대한 마련은 미흡한 실정이었다. 또한, 국내·외 선행연구를 살펴보며 전문가의 정성적 지식이 반영된 타일공사 하자 유형 특징을 도출한 후 분류 체계를 구성하고, 유형별 원인에 따른 대책을 제시하는 연구가 부족하였다. 따라서 본 연구는 정성적 지식을 반영할 수 있으며 다양한 지표와 하자 유형 간 관계 파악이 용이한 AHP 분석 기법을 활용해 건설 전문가에게 설문조사를 실시한 후, 도출된 두 가지 정성적 지표인 '하자 보수 후 재발 가능성', '하자 보수의 어려움 정도'의 가중치와 정량적 지표인 '하자 발생빈도'를 방사형 그래프로 시각화하여 타일공사 하자 유형의 특징을 분석하고 원인에 따른 저감 대책을 수립한다. 이는 거주환경의 품질을 높일 뿐만 아니라 공동주택 타일공사의 원활한 하자 관리를 위한 시스템 구축 및 공동주택 타일공사 하자 저감에 기여할 것이다.