A Study on Building of Underpass for Small Vehicles by Benefit and Cost Analysis (편익과 비용 분석을 통한 소형차전용지하차도 도입에 관한 연구)

  • Lee, Young Woo
    • International Journal of Highway Engineering
    • /
    • v.15 no.2
    • /
    • pp.149-157
    • /
    • 2013
  • PURPOSES : This study is to analysis for benefit and construction cost in underpass for small vehicles. METHODS : The study was performed using the traffic software VISSIM 5.20 for analysis on a variety of traffic conditions and analysed of benefits of changes through analysis of travel speed and travel time after modeling of existing underpass and small vehicle underpass. RESULTS : Results of this study, the benefits will be reduced by the introduction underpass for small vehicles were analyzed because heavy vehicles use the intersection above the underpass. However, it was required economic analysis considering both the benefits reduction and the construction costs reduction because it has the effect of reducing the construction cost. Showed that the difference in benefit changes depending on the v/c and heavy vehicles ratio and construction cost was difference by types of underpass. As a result of performing economic analysis with total benefits and construction cost, it was analyzed to be economical in underpass over a certain size. CONCLUSIONS : The result of this study are expected to be able to contribute to reviewing for feasibility due to the small vehicles underpass introduction and economic analysis. The study is case study to the underpass in Daegu. Therefore, the future requires the calculation of benefits reflect a wider range of traffic conditions and the economic analysis to construction cost calculation for various types of grad separation facilities.

Model and Heuristics for the Heterogeneous Fixed Fleet Vehicle Routing Problem with Pick-Up and Delivery

  • Zhai, Shuai;Mao, Chao
    • Journal of Distribution Science
    • /
    • v.10 no.12
    • /
    • pp.19-24
    • /
    • 2012
  • Purpose - This paper discusses the heterogeneous fixed fleet vehicle routing problem with pick-up and delivery (HFFVRPPD), for vehicles with different capacities, fixed costs, and travel costs. Research Design, data, methodology - This paper made nine assumptions for establishing a mathematical model to describe HFFVRPPD. It established a practical mathematical model, and because of the non-deterministic polynomial-time hard (NP-hard), improved the traditional simulated annealing algorithm and tested a new algorithm using a certain scale model. Result - We calculated the minimum cost of the heterogeneous fixed fleet vehicle routing problem (HFFVRP) with a single task and, on comparing the results with the actual HFFVRP for the single task alone, observed that the total cost of HFFVRPPD reduced significantly by 46.7%. The results showed that the new algorithm provides better solutions and stability. Conclusions - This paper, by comparing the HFFVRP and HFFVRPPD results, highlights certain advantages of using HFFVRPPD in physical distribution enterprises, such as saving distribution vehicles, reducing logistics cost, and raising economic benefits.

  • PDF

PRT Benefit Estimation Study; Focused on Nan-Gok line (PRT시스템 도입시 편익산정 연구; 난곡노선을 중심으로)

  • Lee, Jin-Sun
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.4
    • /
    • pp.370-375
    • /
    • 2011
  • In this paper, as a follow-up PRT studies of "J. Lee & K. Kim[2]", in terms of public transportation systems, economic feasibility of PRT systems was investigated. Based on previous studies, PRT demand was estimated and the required number of PRT vehicles has been calculated and the benefit was estimated. To ensure the economic feasibility, construction cost of a PRT system should be the level of 8 billion won per km, and the annual operating costs of the PRT system construction should be approximately 4.63% level. As a result, how much to reduce PRT construction costs, depending on whether decisions are considered to be economically feasible. Thus, PRT technology development will be conducted by targeting the most lightweight and by minimizing the infrastructure and vehicles of PRT.

Evaluation of The Highway Design Speed Determination Process Using Case Studies (Reclassifying Functions and Terrain Types) (사례분석을 통한 도로설계속도 결정방법론 적용성 평가 (기능 재분류와 지형특성 이용))

  • Sim, Gwan-Bo;Choe, Jae-Seong
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.2 s.88
    • /
    • pp.101-112
    • /
    • 2006
  • Currently, highway design speed is determined by considering highway function, area type, and terrain type. Sometime it is pointed out that determining a reasonable design speed which is both efficient and safe is not an easy task and that Practicing engineers often select an unsuitable design speed on purpose, capitalizing on some ambiguous and discretionary expressions in describing the highway design speed. This undesirable Problem is arising mostly due to the fact, that the current geometric design standard fails to include rolling terrain type and can not reflect the whole characteristics of land use patterns adjacent to the design highway route. A recent research was Published considering this problem and it attempted to improve the highway design speed determining process. In this research Project, tn see the effects of this recently developed procedure, a new and reduced design speed was calculated based on the new Procedure and subsequently another highway design route was selected. The travel time. construction cost. and the expected degree of safety associated with the new route were assessed to be compared with the ones with the existing procedure. As a result. it was found that the new procedure was successful in reflecting the localities such as terrain type and area type into better determining highway design speed, eliminating much of highway engineers' discretion when applying engineering judgments. Also the new Procedure is keen to produce a more economical highway project. In other words, despite of producing reduced amount of user benefits accrued, in the new highway route, the construction cost has been cut significantly leading to higher values in B/C. NPV, and IRR. Also EMME-II output, which Provided the link assigned volumes, rendered only a slightly reduced Levels of Service along surrounding links in the study network. This reduction was believed to occur because of lower design speed and it had been expected from the beginning.