• Title/Summary/Keyword: Reconstruction of the apartment housing

Search Result 71, Processing Time 0.025 seconds

Development of Estimation System for Housing Remodeling Cost through Influence Analysis by Design Elements (설계요소별 영향분석을 통한 공동주택 리모델링 공사비개산견적 산출 시스템 개발)

  • Kim, Jun;Cha, Heesung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.6
    • /
    • pp.65-78
    • /
    • 2018
  • In As urban apartment are aging, the necessity of reconstruction or remodeling to extend the life of buildings is increasing. In such a case, a co-housing association is formed to implement decisions on reconstruction or remodeling projects. At this time, the most important thing for the co-housing association is the business feasibility based on the input of the construction cost.In the case of reconstruction, it is possible to estimate the construction cost by using the accumulated construction cost data, and then evaluate the feasibility using the construction cost. However, in case of remodeling, it is difficult to calculate the accurate construction cost because the number of accumulated construction cost data is small. In addition, non-specialist clients often require estimates of various design factors, often negatively impacting the accuracy of estimates and the duration of estimates. Therefore, in this study, proposed method to reflect the opinion of the owner who is a non-expert, as a design element, and a method of calculating the expected construction cost according to the design element, and constructed this system so that it can be easily used by the non-specialist owner. In order to clearly reflect the requirements of the non-specialist owner in the estimates, extracts the design elements from the existing remodeling cases, classify them, and suggest a plan for the client to choose. In order to reflect the design factors to the estimates, the existing apartment house remodeling cases were investigated and the design factors were extracted to have a large effect on the construction cost. Finally, developed system based on MS Excel so that the above contents can be easily used by a non-specialist client. In order to verify the accuracy of the proposed estimate in this study, verified the accuracy of 80% of the results by substituting the case of remodeling quotations and obtained a positive result from the questionnaire survey to examine the ease of use of the non-specialist customer. In this study, propose an estimate estimation method using four cases. If the remodeling cases are accumulated continuously, the expected effect of this study will be higher.

Analysis of impact structure on Business satisfaction and Continuous business intention by the conflict Response and processing of Apartment Reconstruction projects (공동주택 재건축 사업의 갈등대응 및 처리가 사업만족도 및 지속적 사업의사에 미치는 영향구조 분석)

  • Kim, Hyung-Jin;Lee, Joo-Hyung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.3
    • /
    • pp.1699-1706
    • /
    • 2015
  • The purpose of this study is to induce a indicator related to the response, handling and management which are appeared on each step of business enforcement in housing reconstruction projects. Then, it aims to appropriately and reasonably resolve the conflicts of reconstruction business with relevant subjects. These projects physician satisfaction and continual business was going to have the impact that any analysis of the structure in an evaluation. In addition, this study analyzes the impact structure on the business satisfaction and a intention for continuous business through this evaluation. This study sets a operational hypothesis in order to verify the relationship between the variables. then, it creates the structural model by using the Smart PLS 3.0. After analyzing the impact structure by using total 252 samples, this study adopts the final hypothesis which shows (+) path coefficient as set in the hypothesis and test statistic above 1.65. In result, six out of the nine hyphothesis are adopted. then, The 'Response to conflict' which affects the 'Management to conflict(H1)' has a path coefficient of 0.618. In addition, the 'Handling to conflict' which affects the 'Management to conflict(H2)' has a path coefficient of 0.150. The 'Handling to conflict' which affects the satisfaction of 'business' has a path coefficient of 0.101. and the 'management to conflict' which affects the satisfaction of 'business(H7)' has a path coefficient of 0.644. In addition, the 'Intention for continuous business(H8)' shows a path coefficient of 0.258. Finally, The satisfaction of 'business' which affects the 'intention for continuous business(H9)' has a path coefficient of 0.391.

A Scheduling Method Of Dismantling Work Considering Specific Condition Of Remodeling Project - Focused on Old Aged Apartment House with Wall-Slab Structure - (리모델링의 특성을 반영한 철거공사의 공정계획 수립방안 - 벽식구조 노후 공동주택을 대상으로 -)

  • Kang, Sa-Yil;Hwang, Young-Kyu;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.104-115
    • /
    • 2008
  • Currently, reconstruction and remodeling are conducted to improve the performance of aged housing. Recently reconstruction has caused many problems such as wastes generation, wasting resources and real estate speculation, remodeling is drawing attention. Accordingly, remodeling business for aged housings gradually increasing, but the use of scheduling method not considering characteristics of remodeling deters construction in some construction types. Especially, in case of dismantling construction, the dismantling is delayed since the scheduling method not considering characteristics of remodeling is used. In case of remodeling, dismantling construction is ahead of other processes, if the dismantling construction is delayed, whole construction will be delayed and if speedy construction is conducted, the costs for remodeling will increase. Furthermore, existing remodeling for aged housing has been for rahmen(crossbeam and pillar) structure apartments, but since most apartments to be remodeled are wall-slab structure where dismantling takes a lot of weight, it is highly possible the dismantling construction is delayed. Thus, this paper is to establish scheduling method for the dismantling construction reflecting characteristic of remodeling to prevent delay of dismantling construction for remodeling of aged housing with wall-slab structure.

Development of Optimal TACT Process for Eco-Friendly Demolition Works in Aged Housing Remodeling - Focus on Case Study - (친환경 리모델링 철거공사의 최적 TACT공정 개발 - 사례연구를 중심으로 -)

  • Woo, Joong-Pyung;Kim, Ki-Hyun;Hwang, Young-Gyu;Kim, Kyung-Rai;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.3-12
    • /
    • 2011
  • Technology based civilization has made a sustained advancement, resulting in economic growth and material prosperity. The outcome was the beginning of environmental destruction. Especially, in regard to construction, it has been recognized as a key culprit for pollution. As such, the construction industry has recently shown interest in the environment, as it has been applying environment friendly method of construction and reducing wastes. As the number of old common housing increases in our country, reconstruction and remodeling are implemented as a means of improvement. However, it can be said that remodeling is the inevitable option because of cost and environmental problems associated with reconstruction. As part of its feature, remodeling work is preceded by removal work. And, removal work inevitably creates construction wastes. Treatment of wastes that takes into consideration environmental aspects is important and for this, removal work that is based on environment friendly remodeling to ensure selective separation must be implemented. Yet, a removal work based on environment friendly remodeling has a lower level of output compared to existing methods. Because remodeling work by its nature has a post construction work which proceeds after it, securing work efficiency is important as the removal work is a critical path activity. Thus, the present study improves the work process of a removal work that is based on environment friendly remodeling so that it becomes a work process that includes work efficiency. For this, as a case study, old common housing has been selected, and a TACT process has been developed which is based on data acquired from environment friendly removal work. And, this study develops an optimal TACT process which is based on environment friendly remodeling by conducting a simulation for a 15 floor apartment.

Estimation and Adjustment Model Considering Time Value of Money for Long-Term Maintenance Cost of Apartment House (시간적 가치를 고려한 공동주택 장기수선충당금 산정 및 조정 모델)

  • Koo, Seonkeun;Kim, Jonghyeob;Jun, Inyeong;Kim, Yeongjin;Yoon, Yousang;Hyun, Changtaek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.12-21
    • /
    • 2017
  • From 1960, the government decided to build apartment houses on a large scale in order to resolve the rising housing problems. However, the maintenance issues that have arisen from the deterioration of housing has not received adequate attention. The policy focuses only on the supply of housing. By passing new laws, the durable period during which buildings allowed reconstruction was increased, and long term maintenance plans were treated as important issues. The government was then obligated to establish certain long term maintenance plans and costs by legislating a Housing Act and requiring it be adjusted every three years. However, when planning long-term repair costs, doing so without considering the time value of money would become a problem. In addition, if differences between the planned repair costs and actual costs occur, it becomes necessary to adjust the long-term repair costs but, as of yet, the criteria to adjust such things does not exist. For these reasons, if there is lack of money to execute large-scale repair work, a building is unlikely to respond to deterioration of housing; on the other hand, an unnecessary reserve or pool of money can lead to conflict among residents. Therefore, this paper will propose estimation and adjustment models considering the time value of money for long term maintenance costs of apartment houses.

A Feasibility Study of Green Frame(GF) for the Implementation of Low-carbon Emissions & Long-life Housing (저탄소 및 장수명 공동주택 구현을 위한 Green Frame(GF)의 타당성 분석)

  • Hong, Won-Kee;Kim, Sun-Kuk;Kim, Hyung-Geun;Yoon, Tae-Ho;Yune, Dai-Young;Kim, Seung-Il
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.57-63
    • /
    • 2010
  • The bearing wall apartments which occupy the majority of multi-residential apartment buildings built in Korea, are known for having limited architectural plan flexibility, posing challenges in terms of maintenance and remodeling. The economic losses and environmental issues resulting from the reconstruction of bearing wall apartments are now accumulating to the extent that they are becoming a national concern. Multi-residential apartment buildings, which are now the dominant form of residence in Korea, must accommodate diverse customer needs and changes in life style. A new concept of Rahmen structure with architectural flexibility is Green Frame. GF multi-residence housing is expected to reduce construction costs and shorten the construction schedule by overcoming the shortcomings of conventional bearing wall apartments. This goal is consistent with the national policies that target the reduction of resource and energy consumption. In addition, GF will be established as a core contributor to achieving a reduction in $CO_2$ emissions, which will enable the sustainable growth of domestic construction industry, and address the low-carbon green growth drive implemented by the government.

A Study on the Improvement of Safety Management for Military Demolition Works (군 해체공사 안전관리 개선에 관한 연구)

  • Sang Jun, Jeong;Jong Yil, Park
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.6
    • /
    • pp.71-80
    • /
    • 2022
  • Since the 2000s, the demand for private demolition works has been gradually increasing as the apartment housing market has been led by redevelopment and reconstruction. In the case of the military, the Ministry of National Defense is consolidating troops from each military unit to reorganize the unit structure in accordance with Defense Reform 2.0; the plan includes reducing the garrison used by each unit to 70% of its current level. Accordingly, the demand for demolition work in the military is also expected to increase. However, the military regulations do not reflect the relevant laws that have been revised recently. This study identifies regulations and system improvements for demolition work suitable for the military based on an analysis of accident cases that have occurred during demolition work, of domestic and foreign laws and regulations related to military demolition work, and of the problems with current military safety management at each stage of planning, design, and construction. The study subsequently proposes improvements for military demolition work, including budget execution adjustment, the establishment of training courses, on-site inspections, the development of guidelines for military demolition work, the provision of risk assessment standards, and the need for the qualification of equipment operators.

A Study on Weight for Capability Evaluation in the Safety Inspection for Vertical Extension Remodeling of the Apartment Housing (증축형 리모델링 안전진단 내하력 평가의 가중치에 대한 연구)

  • Lim, Chi-Sung;Karl, Kyoung-Wan;Oh, Dae-Jin;Lee, Seok-Ho
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.25 no.1
    • /
    • pp.51-58
    • /
    • 2021
  • As vertical extension remodeling policy was implemented in 2014, Safety Inspection Manual was established to ensure structural safety during the vertical extension remodeling. In the manual, the story weight for capability evaluation was based on the Safety Inspection Manual for Reconstruction. Although capability evaluation in the vertical extension remodeling is more important than reconstruction, engineering basis for the story weight is insufficient. Therefore it is necessary to improve the method of calculating the story weight. In this study, story importance and story weight were defined through the case analysis of capability evaluation in order to provide engineering basis for story weight. Also, new story weight equation was presented considering the load-bearing ratio of structural members.

Comparison Analysis of Environmental Performance between Reconstruction and Remodeling Alternatives for Aged - Focused on CO2 Emissions Analysis - (공동주택 재건축과 리모델링의 친환경성 비교분석 - CO2 배출량 분석을 중심으로 -)

  • Kim, Chibaek;Shin, Dongwoo;Han, Juyeon;Hwang, Youngkyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.87-100
    • /
    • 2014
  • Environmental problems and the shortage of natural resources are currently gathering more attention in Korea and international countries. With these problems, it is reported that most current domestic buildings are emitting approximately 138 million tons of greenhouse gas. According to a recent report from the investigation of Korean housing population, the total number of households is approximately 12.9 millions, and the apartments that were built more than 15 years ago amounted to 3.1 millions. This shows that the rates of old apartment housings are increasing. Therefore, it is necessary to consider the deteriorated facilities and environmental improvement. Also, the construction industry is benefited by improving these housings which may need either remodeling or reconstruction. Environmental friendly buildings are a rising consideration for remodeling and reconstruction projects; it helps to determine many business matters in construction. The main purpose of this research is to improve environmental condition in apartments with comparison analysis between remodeling and reconstruction alternatives. This research is focused on characteristics of remodeling and reconstruction and it sets up the same condition with each level in order to evaluate the value of environmental friendliness and analyze its definition. The result of this research provides a unique emitting rate at a novel framework and this will cause the reduction of $CO_2$. It is analyzed that the remodeling construction can reduce the great amount of $CO_2$. Therefore, it will be a good decision guideline in selecting the most eco-friendly alternative to improve environment for building construction. Although reconstruction is a popular alternative nowadays in Korea, this research can provide a reason why decision makers should put more emphasis on remodeling as an environment-friendly alternative.

A Development of Automatic Quantification System of C&D Waste By Using 3D Objects. (3D Object를 활용한 건설폐기물의 자동화산정 시스템 개발)

  • Kim, Chang-Hak;Lee, Kyoung-Hee;Kim, Hyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.388-391
    • /
    • 2008
  • The Domestic housing Industry has to give consequence to the redevelopment and rebuilding of existing housings rather than the supply by developing a new building site, and now those tendencies are rapidly spreading out. Also, because apartment buildings occupies 50% over of the existing housing, its maintenance, repair, remodeling and reconstruction got to be necessary area for the slumming prevention of a residential area and the disaster prevention occurred by durability lowering of the building. It is increasing the interest for reusing and recycling of C&D waste. The government is doing efforts to diminish amount of C&D waste. But there couldn't find any efforts for developing Integrated system to manage and to estimate lightly generated amounts of C&D waste. So, this study presents a integrated computer system that can estimate easily quantity of C&D waste by using CAD draw and 3D Object.

  • PDF