• 제목/요약/키워드: Reclosing

검색결과 100건 처리시간 0.023초

Developing a New Risk Assessment Methodology for Distribution System Operators Regulated by Quality Regulation Considering Reclosing Time

  • Saboorideilami, S.;Abdi, Hamdi
    • Journal of Electrical Engineering and Technology
    • /
    • 제9권4호
    • /
    • pp.1154-1162
    • /
    • 2014
  • In the restructured electricity market, Performance-Based Regulation (PBR) regime has been introduced to the distribution network. To ensure the network stability, this regime is used along with quality regulations. Quality regulation impose new financial risks on distribution system operators (DSOs). The poor quality of the network will result in reduced revenues for DSOs. The mentioned financial risks depend on the quality indices of the system. Based on annual variation of these indices, the cost of quality regulation will also vary. In this paper with regard to reclosing fault in distribution network, we develop a risk-based method to assess the financial risks caused by quality regulation for DSOs. Furthermore, in order to take the stochastic behavior of the distribution network and quality indices variations into account, time-sequential Monte Carlo simulation method is used. Using the proposed risk method, the effect of taking reclosing time into account will be examined on system quality indicators and the cost of quality regulation in Swedish rural reliability test system (SRRTS). The results show that taking reclosing fault into consideration, affects the system quality indicators, particularly annual average interruption frequency index of the system (SAIFI). Moreover taking reclosing fault into consideration also affects the quality regulations cost. Therefore, considering reclosing time provides a more realistic viewpoint about the financial risks arising from quality regulation for DSOs.

단상 재폐로시 2차아아크 전류의 감소방법에 관한 연구 (A Study on the Decreasing Method of Secondary Arc Current on Single Phase Reclosing)

  • 김준현
    • 전기의세계
    • /
    • 제26권6호
    • /
    • pp.59-65
    • /
    • 1977
  • A study on the decreasing method of secondary arc current on single phase reclosing. One of the major problem in case of using the single phase reclosing scheme for long distance UHV transmission line is the time required to deionize secondary arc current. This paper descritbes the way of inducing the formular of secondary arc current originated at the times of opening and closing the ground interrupting switch. The result was investigated by the method of numerical analysis and proved that the secondary arc current was decreasing sufficiently. Application of this method proposed by the authod makes it possible to deduce the dead time and to improve success-rate of reclosing.

  • PDF

분산전원을 고려한 적응적 재폐로 기법 (An Adaptive Reclosing Technique Considering the Distributed Generation)

  • 서훈철;김철환;여상민
    • 전기학회논문지
    • /
    • 제56권2호
    • /
    • pp.227-232
    • /
    • 2007
  • The autoreclosing is applied to power system for maintaining system stability and continuity of supply. Developments on distributed generation(DG) grows significantly by environmental issues and economical issues. If the DG is connected to distribution system, the DG influences the technical aspects such as power quality, protection and stability. It causes the challenges to protection, especially to reclosing. In order to achieve reliability and safety of the distribution system, the rules and guidelines suggest that the DG units should be rapidly disconnected from the network before the reclosing. If the DG is disconnected whenever the fault occurs, it cannot be utilized effectively. This paper presents the adaptive reclosing algorithm considering the DG. The algorithm consists of angle oscillation's judgment, EEEAC(Emergency Expanded Equal-Area Criterion), calculation of optimal reclosing time and re-connection algorithm. The simulation is implemented for the DG technology by using EMTP MODELS. The simulation results show that the transient stability is maintained and the DG is protected against disturbance.

최적 재폐로방식 선정에 관한 연구 (A Study on the Determination of Optimal Auto-reclosing)

  • 김일동;한경남;임성정;김재철
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1997년도 하계학술대회 논문집 D
    • /
    • pp.861-863
    • /
    • 1997
  • This paper presents a reliability and power quality taken account of the reclosing scheme on the power distribution system. To determine the optimal reclosing scheme, the simple radial distribution system is modelled, and analyzes quantitatively the effect of customer's load to the number of reclosing. The result of the analysis shows that the determined reclosing scheme can satisfy both the reliability and the power quality in the power distribution system.

  • PDF

전력품질을 고려한 배전시스템에서의 개선된 재폐로방식에 관한 연구 (Advanced Reclosing Schemes in Power Distribution Systems Considering Power Quality)

  • 임성정;김재철
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제51권1호
    • /
    • pp.1-6
    • /
    • 2002
  • This paper proposes an advanced reclosing scheme to improve power quality in power distribution systems. When a fault occurs in distribution system, the proposed schema determines the number of reclosing shots and its intervals according to the magnitude of fault current. Thus, an advanced reclosing scheme takes account of the power quality problem in customer\`s and the damage in electric facilities. To verify the effectiveness of the proposed scheme, a numerical simulation that calculates various indices to consider the reliability and the other effects on electric facility, in carried out with actual field data.

하이브리드 재폐로 방식의 초고압 표본 계통에 대한 안정도 영향 시뮬레이션 (Simulation of Stability Effect with Hybrid Reclosing of A Sample EHV System)

  • 이태형;안병천;박병철;이욱화;신중린;이성우
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1996년도 하계학술대회 논문집 B
    • /
    • pp.784-786
    • /
    • 1996
  • This paper presents some stability simulations using EMTP to see the effect of EHV Lines with hybrid reclosing on power system stability. The Hybrid reclosing on EHV lines can improve the reliability of power systems. These studies is performed as a part of the research work which is aimed to find proper scheme of reclosing for EHV lines in Korea. Completing a number of simulation works with the diverse conditions such as ones reported in this paper, some decisions could be made through some stochastic approches for the simulation results for the proper scheme of reclosing for Korean systems.

  • PDF

BESS가 연계된 배전계통에서 새로운 재폐로 기법 (New Reclosing Technique in Distribution System with Battery Energy Storage System)

  • 서훈철
    • 조명전기설비학회논문지
    • /
    • 제30권1호
    • /
    • pp.21-27
    • /
    • 2016
  • The study concerning about the grid connection of the large-capacity battery energy storage system(BESS) is increasing. However, the protection study which is necessary to maintain the reliability of distribution system has been hardly performed. Therefore, this paper analyzes the effect of reclosing among protection issues in distribution system with BESS and proposes the new relcosing method. To verify the proposed method, the BESS, distribution system, and proposed method are modeled by using EMTP/ATPDraw and the various simulations according to the fault clearing time are performed. The simulation results show that the reclosing in distribution system with BESS is successfully performed by proposed method and the operation of BESS is not affected from reclosing.

345kV 혼합송전선로에서 재폐로가 절연설계에 미치는 영향 (Effects of Reclosing for Insulation Coordination in 345kV Combined Transmission Lines)

  • 이종범;정채균;임광식;강지원
    • 전기학회논문지
    • /
    • 제59권5호
    • /
    • pp.847-853
    • /
    • 2010
  • This paper describes switching surge analysis for reclosing decision in 345kV combined transmission line with XLPE power cable. Reclosing operation should be decided based on the detailed technical analysis in combined transmission line because this line includes power cable section which is week on insulation. Insulation of power cable can be breakdown at the week point in case of reclosing moment. Therefore the detailed analysis has to be carried out by considering several conditions such as length ratio of power cable section, arrestor, inserting resistance, charging rate, grounding resistance, etc.. On the other hand sheath voltage on IJ(Insulated Joint) is analyzed to check dangerous condition on cable cover. Analysis is performed by EMTP/ATP. Analysis results show that reclosing can be operated as the single line-to-ground fault occurs on overhead line in 345kV combined transmission line, if the inserting resistance is considered before the operation of main circuit breaker.

154kV 혼합송전선로 재폐로 결정에 관한 연구 (A Study on Reclosing Decision on 154kV Combined Transmission Lines)

  • 정채균;박흥석;강지원;이종범
    • 전기학회논문지
    • /
    • 제59권10호
    • /
    • pp.1761-1769
    • /
    • 2010
  • This paper describes switching surge analysis on reclosing decision in 154kV combined transmission line with power cables. Reclosing should be operated in combined transmission line based on the technical evaluation because of insulation problem of power cable section. If the surge strikes on power cable, the breakdown can occur at week point of cable insulation. Therefore the detailed analysis is required by considering several conditions such as length ratio of power cable, arrester, fault resistance, charging rate and grounding resistance, etc.. In addition, sheath voltage on IJ(Insulated Joint) is analyzed to confirm the protective level. Simulation is performed by EMTP/ATP. Analysis results show that reclosing can be operated without any special problem by the single line-to-ground fault with fault resistance of $1\Omega$ to $50\Omega$ occurred at the overhead transmission section in 154kV combined transmission lines and trap charge of 100% and 110%.

전압증가 시 재폐로 동작에 따른 변압기형 초전도 한류기의 특성 분석 (Characteristics on the Transformer-Type SFCL According to Reclosing Operation the Voltage Increase)

  • 최수근;최효상
    • 전기학회논문지P
    • /
    • 제59권4호
    • /
    • pp.477-480
    • /
    • 2010
  • Fault current in power system is expected to increase by demand of power capacity. Therefore, when the fault occurred, fault current was increased in the power system. Many studies have been progressed to limit the fault current. Superconducting fault current limiter (SFCL) is one of them which has been studied in worldwide. In this paper, we will analyze characteristics of a transformer-type SFCL by reclosing operation when the voltage increases. Twice opening times in the reclosing of circuit breaker were set as the 0.5 and 15 seconds, respectively. Turn's number of primary and secondary coils set 4:2 and we increased voltages from 120V to 280V for each experiment. By the current waveform, maximum fault current in second and third cycles was lowered when the voltage was increased. In the recovery waveform, recovery time was increased as the voltage was increased. The reason was that power burden of the SFCL increased when consumption power was increased, so the time to get back to SFCL took longer. We compared the characteristics of a resistive-type and transformer-type SFCL. As a result, we found that the fault current of a transformer-type was lower than resistive-type and recovery time of the SFCL was shorter. Consequently, transformer-type SFCL was more profitable for limitation of fault current and recovery time under the same condition for reclosing operation.