• Title/Summary/Keyword: Reactor Commissioning

Search Result 15, Processing Time 0.019 seconds

Superconducting Magnet Power Supply System for the KSTAR 2nd Plasma Experiment and Operation

  • Choi, Jae-Hoon;Lee, Dong-Keun;Kim, Chang-Hwan;Jin, Jong-Kook;Han, Sang-Hee;Kong, Jong-Dae;Hong, Seong-Lok;Kim, Yang-Su;Kwon, Myeun;Ahn, Hyun-Sik;Jang, Gye-Yong;Yun, Min-Seong;Seong, Dae-Kyung;Shin, Hyun-Seok
    • Journal of Electrical Engineering and Technology
    • /
    • v.8 no.2
    • /
    • pp.326-330
    • /
    • 2013
  • The Korea Superconducting Tokamak Advanced Research (KSTAR) device is an advanced superconducting tokamak to establish scientific and technological bases for attractive fusion reactor. This device requires 3.5 Tesla of toroidal field (TF) for plasma confinement, and requires a strong poloidal flux swing to generate an inductive voltage to produce and sustain the tokamak plasma. KSTAR was originally designed to have 16 serially connected TF magnets for which the nominal current rating is 35.2 kA. KSTAR also has 7 pairs of poloidal field (PF) coils that are driven to 1 MA/sec for generation of the tokamak plasma according to the operation scenarios. The KSTAR Magnet Power Supply (MPS) was dedicated to the superconducting (SC) coil commissioning and $2^{nd}$ plasma experiment as a part of the system commissioning. This paper will describe key features of KSTAR MPS for the $2^{nd}$ plasma experiment, and will also report the engineering and commissioning results of the magnet power supplies.

Document Flow for the Research Reactor Project in ANSIM Document Control System (ANSIM 문서관리시스템에서 연구로사업 문서흐름)

  • Park, Kook-Nam;Kim, Kwon-Ho;Kim, Jun-Yeon;Wu, Sang-Ik;Oh, Soo-Youl
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.36 no.4
    • /
    • pp.18-24
    • /
    • 2013
  • A document control system (DCS), ANSIM (KAERI Advanced Nuclear Safety Information Management) was designed for the purpose of documents preparation, review, and approvement for JRTR (Jordan Research and Training Reactor) project. The ANSIM system consists of a document management, document container, project management, organization management, and EPC (Engineering, Procurement and Construction) document folder. The document container folder run after specific contents, a revision history of the design documents and drawings are issued in KAERI. The EPC document work-scope is a registry for incoming documents in ANSIM, the assignment of a manager or charger, document review, preparing and outgoing PM memorandum as attached the reviewed paper. On the other hand, KAERI is aiming another extra network server for the NRR (New Research Reactor) by the end of this year. In conclusion, it is the first, computation system of DCS that provides document form, document number, and approval line. Second, ANSIM increases the productivity of performance that can be recognized the document work-flow of oneself and all participants. Finally, a plenty of experience and knowledge of nuclear technology can be transmitted to next generation for the design, manufacturing, testing, installation, and commissioning. Though this, ANSIM is expected to allow the export of a knowledge and information system as well as a research reactor.

Several Problems in Reactor Coolant System Flow Rate Measurement

  • Ahn, Seung-Hoon;Auh, Geun-Sun;Suh, nam-Cuk;Park, Jun-Sang;Koo, Bon-Hyun
    • Nuclear Engineering and Technology
    • /
    • v.30 no.6
    • /
    • pp.592-608
    • /
    • 1998
  • Inspection of RCS flow measurements for the domestic pressurized water reactors has been performed by the Korea Institute of Nuclear Safety (KINS) as one of the authorized periodical inspection activities. The inspection results for the Westinghouse-type plants reveal that 1) the RCS flow instrumentation has been calibrated by using the initial design and commissioning test result, without reflecting the cycle specific reference flow measurements, 2) the loop-to-loop now variation in the actual flow measurement which has not been considered in the safety analysis affects the asymmetric How transient results, and 3) the measured RCS flows in Kori 3 and 4, Yonggwang 1 and 2 do not support the definition of the best estimate RCS flow, approaching the RCS flow limit. In this study, the revealed problems were discussed with review of the design and the RCS flow measurement uncertainty evaluation, and the technical approaches and recommendations for resolving these problems were proposed.

  • PDF

The Construction Work Completion of the Fuel Test Loop (핵연료 노내조사시험설비 설치공사 완료)

  • Park, Kook-Nam;Lee, Chung-Young;Chi, Dae-Young;Park, Su-Ki;Shim, Bong-Sik;Ahn, Sung-Ho;Kim, Hark-Rho;Lee, Jong-Min
    • Proceedings of the KSME Conference
    • /
    • 2007.05a
    • /
    • pp.291-295
    • /
    • 2007
  • FTL(Fuel Test Loop) is a facility that confirms performance of nuclear fuel at a similar irradiation condition with that of nuclear power plant. FTL consists of In-Pile Test Section (IPS) and Out-Pile System (OPS). FTL construction work began on August, 2006 and ended on March, 2007. During Construction, ensuring the worker's safety was the top priority and installation of the FTL without hampering the integrity of the HANARO was the next one. Task Force Team was organized to do a construction systematically and the communication between members of the task force team was done through the CoP(community of Practice) notice board provided by the Institute. The installation works were done successfully overcoming the difficulties such as on the limited space, on the radiation hazard inside the reactor pool, and finally on the shortening of the shut down period of the HANARO. Without a sweet of the workers of the participating company of HEC(Hyundae Engineering Co, Ltd), HDEC(HyunDai Engineering & Construction Co. Ltd), equipment manufacturer, and the task force team, it is not possible to install the FTL facility within the planned shutdown period. The Commissioning of the FTL is on due to check the function and the performance of the equipment and the overall system as well. The FTL shall start operation with high burn up test fuels in early 2008 if the commissioning and licensing progress on schedule.

  • PDF

The Construction Status of Fuel Test Loop Facility (핵연료 노내조사시험설비의 시공 현황)

  • Park, Kook-Nam;Lee, Chung-Young;Kim, Hark-Rho;Yoo, Hyun-Jae;Yoo, Seong-Yeon
    • Proceedings of the SAREK Conference
    • /
    • 2007.11a
    • /
    • pp.305-309
    • /
    • 2007
  • FTL(Fuel Test Loop) is a facility that confirms performance of nuclear fuel at a similar irradiation condition with that of nuclear power plant. FTL construction work began on August, 2006 and ended on March, 2007. During Construction, ensuring the worker's safety was the top priority and installation of the FTL without hampering the integrity of the HANARO was the next one. The installation works were done successfully overcoming the difficulties such as on the limited space, on the radiation hazard inside the reactor pool, and finally on the shortening of the shut down period of the HANARO. The Commissioning of the FTL is to check the function and the performance of the equipment and the overall system as well. The FTL shall start operation with high burn up test fuels in early 2008 if the commissioning and licensing progress on schedule.

  • PDF