• 제목/요약/키워드: Re-liquefaction system

검색결과 35건 처리시간 0.02초

LNG 운반선을 위한 BOG 재액화시스템 최적 설계 (Optimal Process Design of Onboard BOG Re-liquefaction System for LNG Carrier)

  • 황철민;임영섭
    • 한국해양공학회지
    • /
    • 제32권5호
    • /
    • pp.372-379
    • /
    • 2018
  • High-pressure gas injection engines (HPGI) took center stage in LNG carrier propulsion systems after their advent. The HPGI engine system can be easily modified to include a re-liquefaction system by adding several devices, which can significantly increase the economic feasibility of the total system. This paper suggests the optimal operating conditions and capacity for a re-liquefaction system for an LNG carrier, which can minimize increases in the total annualized cost. The installation of a re-liquefaction system can save 0.23 million USD per year when the cost of LNG is 5 USD/Mscf. A sensitivity analysis with different LNG costs showed that the re-liquefaction system is profitable when the LNG cost is higher than 3.5 USD/Mscf.

Design of BOG re-liquefaction system of 20,000 m3 liquid hydrogen carrier

  • Byeongchang Byeon;Hwalong You;Dongmin Kim;Keun Tae Lee;Mo Se Kim;Gi Dock Kim;Jung Hun Kim;Sang Yoon Lee;Deuk Yong Koh
    • 한국초전도ㆍ저온공학회논문지
    • /
    • 제25권3호
    • /
    • pp.49-55
    • /
    • 2023
  • This paper presents the design of a re-liquefaction system as a BOG (boil-off gas) handling process in liquid hydrogen transport vessels. The total capacity of the re-liquefaction system was assumed to be 3 ton/day, with a BOR (boil-off rate) of 0.2 %/day inside the cargo. The re-liquefaction cycle was devised using the He-Brayton Cycle, incorporating considerations of BOG capacity and operational stability. The primary components of the system, such as compressors, expanders, and heat exchangers, were selected to meet domestically available specifications. Case studies were conducted based on the specifications of the components to determine the optimal design parameters for the re-liquefaction system. This encompassed variables such as helium mass flow rate, the number of compressors, compressor inlet pressure and compression ratio, as well as the quantity and composition of expanders. Additionally, an analysis of exergy destruction and exergy efficiency was carried out for the components within the system. Remarkably, while previous design studies of BOG re-liquefaction systems for liquid hydrogen vessels were confined to theoretical and analytical realms, this research distinguishes itself by accounting for practical implementation through equipment and system design.

역 브레이튼 냉동사이클을 이용한 LNG 운반선의 증발기체 재액화 시스템에 관한 연구 (A Study on the BOG Re-liquefaction System based on the Reverse Brayton Refrigeration Cycle for LNG Carriers)

  • 진영욱
    • 대한안전경영과학회지
    • /
    • 제9권4호
    • /
    • pp.149-154
    • /
    • 2007
  • The LNG carriers have been propelled by steam turbines and the LNG boil-off(BOG) has been used as fuel or vented. However, as the alternative propulsion systems such as diesel engines are being equipped on the LNG carriers for better fuel efficiency, a need for the LNG BOG re-liquefaction system that liquefies the BOG and sends the liquid BOG back to the LNG cargo has arisen in recent years. This study investigates the design of the BOG re-liquefaction system based on the reverse Brayton refrigeration cycle. The thermodynamic and heat exchanger analysis are carried out and the limitations to the system performance are discussed.

NGL 분리식 BOG 재액화 공정 고안 및 해석 (Process Design and Analysis of BOG Re-liquefaction System with Pre-liquefaction of NGL)

  • 윤상국
    • 한국가스학회지
    • /
    • 제19권3호
    • /
    • pp.32-37
    • /
    • 2015
  • LNG는 극저온액체로 저장탱크의 열유입으로 인하여 지속적으로 BOG가 발생하고 있으며, 이의 효과적인 방법의 재액화가 요구되고 있다. 이 BOG의 재액화에는 공급되는 저압 펌프 후의 LNG의 냉열을 이용하는 데, 현재의 공정은 BOG 단위 발생량에 대하여 10배 이상의 LNG 흐름이 요구되고 있다. 본 연구에서는 NGL분리액화와 2차 고압펌프 후의 LNG 냉열을 이용하는 공정을 새롭게 고안하였으며, 이를 분석한 결과 LNG 소요유량이 3~4배에 불과한 매우 효과적인 재액화 시스템이 되었다. 본 고안에 의하면 하절기에도 원활한 BOG 재액화가 가능하므로, LNG기지의 안전성 향상과 공급 의 효율을 높일 수 있는 매우 효과적인 공정으로 분석되었다.

상용 공정시뮬레이션 프로그램을 이용한 부유식 LNG 발전설비의 BOG 회수시스템 공정모사 (Process Simulation of the BOG Re-Liquefaction system for a Floating LNG Power Plant using Commercial Process Simulation Program)

  • 서주완;유승열;이재철;김영훈;이순섭
    • 해양환경안전학회지
    • /
    • 제26권6호
    • /
    • pp.732-741
    • /
    • 2020
  • 최근 환경규제가 강화됨에 따라 액화천연가스(Liquefied Natural Gas)를 이용하여 전력을 생산해내는 신규발전설비인 부유식 LNG 발전설비(floating LNG power plant)가 개발되고 있다. 부유식 LNG 발전설비는 운용 시 증발가스가 발생하고 이를 제거하거나 회수할 수 있는 시스템의 설계가 필요하다. 그러나 해양플랜트는 해상요건에 따라 설계가 상이하고, 부유식 LNG 발전설비의 설계 전 시행착오를 줄이기 위해 지속적으로 수정이 가능한 BOG 회수시스템 공정모사 모델이 필요하다. 따라서 본 연구에서는 상용공정시뮬레이션 프로그램을 통해 부유식 LNG 발전설비에 적합한 모델을 모델링하고자 냉매사용 유무에 따라 서로 다른 BOG(Boil-Off Gas) 회수시스템을 모델링하여 BOG의 회수율과 액화점을 비교 및 분석하였으며, 그 결과 질소냉매를 사용한 BOG 회수시스템 모델을 부유식 LNG 발전설비용 BOG 회수시스템 모델로 제안하고자 한다.

Low - Global Warming Potential 냉매를 이용한 에틸렌 수송선의 재액화 시스템 성능개선 (Performance Improvement on the Re-Liquefaction System of Ethylene Carrier using Low-Global Warming Potential Refrigerants)

  • 하성용;최정호
    • 대한조선학회논문집
    • /
    • 제55권5호
    • /
    • pp.415-420
    • /
    • 2018
  • The development of sail gas has increased the production of ethane as well as natural gas. The decline in the market price for ethane has led to a change in the petroleum-based ethylene production process into an ethane-based ethylene production process and an increase in the ethane/ethylene trade volume. Large-scale ethane/ethylene carrier have been needed due to an increase in long-distance trade from the US, and cargo type change have leaded to consider a liquefaction process to re-liquefy Boil-Off gas generated during the voyage. In this paper, the liquefaction system of Liquefied Ethane Gas carrier was evaluated with Low-GWP (Low-Global Warming Potential) refrigerant and process parameters, Boil-Off Gas pressure and expansion valve outlet pressure, were optimized. Low-GWP refrigerants were propane (R290), propylene(R1270), carbon dioxide(R744) was considered at two type of liquefaction process such as Linde and cascade cycle. The results show that the optimal pressure point depends on the individual refrigerant and the highest liquefaction efficiency of carbon dioxide (R744) - propane (R290) refrigerant.

천연가스 운반선의 재액화 장치가 운항비용에 미치는 영향에 관한 연구: 연료비용 및 증발 가스 연소비용 관점에서 (Effect of Re-liquefaction System on Operating Expenditure of LNGC in Terms of Fuel Oil Consumption Cost and BOG Combustion Cost)

  • 유영준;이준채
    • 대한조선학회논문집
    • /
    • 제57권3호
    • /
    • pp.152-159
    • /
    • 2020
  • Ship owners had pursued higher benefits by demanding the new design and construction of ships with higher operational efficiency. There was a necessity for shipyards to suggest a more economical design and advanced operation concept in order to meet the demands. Especially, since BOG combustion and activation of the re-liquefaction unit had to be taken into account in ship design in addition to fuel oil and gas consumption, the evaluation of the operating efficiency considering the technological trends was necessary. In this paper, it was aimed to study the design philosophy and operation strategy by considering the effect of fuel oil and gas consumption, BOG combustion, and activation of the re-liquefaction unit on the operating cost for laden voyage according to ship speed, BOR, and activation of the re-liquefaction unit. For this purpose, the costs were acquired by conducting the sailing simulation of an LNGC based on a mathematical model including the maneuvering equations of motion. The design philosophy and operation strategy was reviewed in terms of the operating cost.

LNG 증발기체의 재액화 사이클에 대한 열역학 해석 (Thermodynamic Analysis of Re-liquefaction Cycle of LNG Boil-off Gas)

  • 진영욱;문정우;이윤표;장호명
    • 설비공학논문집
    • /
    • 제19권7호
    • /
    • pp.485-490
    • /
    • 2007
  • The LNG BOG re-liquefaction system for LNG carriers was designed based on the Claude refrigeration cycle and the thermodynamic analysis was carried out in order to find the design point of the three heat exchangers constituting the system. The thermodynamic analysis revealed that the system state could be defined by the three cold endpoint temperatures of the three-pass heat exchanger. Hence the iso-lines of the specific liquefaction work, taken as the performance indicator, were presented in terms of those three temperatures and discussed. The system was found most economical when those three temperatures approached a single temperature of $-140^{\circ}C$ and thus this system state could be taken as the design point for the heat exchangers.

역대향류 열교환기의 열 핀치(thermal pinch)에 관한 연구 (A Study on the thermal pinch problem in the counterflow heat exchanger)

  • 최성은;진영욱
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2008년도 추계학술대회
    • /
    • pp.659-667
    • /
    • 2008
  • The LNG carriers have been propelled by steam turbines and the LNG boil-off(BOG) has been used as fuel or vented. However, as the alternative propulsion systems such as diesel engines are being equipped on the LNG carriers for better fuel efficiency, a need for the LNG BOG re-liquefaction system that liquefies the BOG and sends the liquid BOG back to the LNG cargo has arisen in recent years. This study investigates the design of the BOG re-liquefaction system based on the reverse Brayton refrigeration cycle. The thermodynamic and heat exchanger analysis are carried out and the limitations to the system performance are discussed.

  • PDF

LNG선 재액화 시스템의 성능 개선에 관한 연구 (A Study on the Improvement of LNGC Re-liquefaction System)

  • 오철;송영욱
    • 한국항해항만학회지
    • /
    • 제33권10호
    • /
    • pp.659-664
    • /
    • 2009
  • LNG선의 건조 동향을 보면 2003년을 기점으로 하여 기하급수적으로 증가하기 시작 하였으며, 2008년을 기점으로 하여 그 건조량은 감소하는 추세이나 건조 선박 중 많은 부분이 재액화 시스템이 장착된 대형 LNG선박으로 대형 LNG선은 216K급의 Q-Flex급, 260K급의 Q-Max급이 주를 이루고 있다. 이러한 LNG선박의 대형화는 LNG선의 화물창 보온 설계 기준인 BOR(Boil Off Rate) 0.15%를 기준해서 상대적으로 많은 양의 BOG가 발생하게 되었으며 선박의 주 추진기관의 연료로 사용 하더라도 잉여 가스가 남게 되어 화물탱크의 압력상승을 막기 위해서는 BOG를 재 액화하여 화물탱크로 반송하거나 소각하는 방법 등으로 처리하지 않으면 안 되게 되었다. 이러한 이유로 인하여 206K(206,000m3)급 이상의 대형 LNG 선박에서는 필수적으로 LNG 재액화 시스템을 탑재하도록 설계를 하게 된다. 본 연구에서는 현재 개발 되어 운항선에 적용되고 있는 여러 가지 LNG 재액화 시스템의 사이클 성능을 동일한 기기 조건하에서 해석함으로써 각각의 장단점을 비교하여 LNG선박의 설계 및 운항 시 재 액화 시스템의 최적화 방안을 제시하고자 한다.