• Title/Summary/Keyword: Rated load

Search Result 314, Processing Time 0.023 seconds

Rotordynamic Analysis of a Turbo-Chiller with Varying Gear Loadings Part II : A Driven High-Speed Compressor Pinion-Impeller Rotor-Bearing System (터보 냉동기의 변동 기어하중을 고려한 로터다이나믹 해석 Part II : 피동 고속 압축기 피니언-임펠러 로터-베어링 시스템)

  • 이안성;정진희
    • Journal of KSNVE
    • /
    • v.9 no.5
    • /
    • pp.1042-1049
    • /
    • 1999
  • In the Part I has been reported a rotordynamic analysis of the driving motor-bull gear rotor-bearing system of a turbo-chiller. In this study, Part II, a rotordynamic analysis is performed with the turbo-chiller compressor pinion-impeller rotor system supported on two fluid film bearings. The pinion-impeller rotor system is driven to a rated speed of 14,600 rpm through a speed-increasing pinion-bull gear. It is modeled utilizing the finite element method for analysis. As loadings on the bearings due to the gear action are significant in the system considered, each resultant bearing load is calculated statically by considering the generalized forces of the gear action as well as the rotor itself. The two support bearings, the generalized forces of the gear action as well as the rotor itself. The two support bearings, partial and 3-axial groove bearings, are designed to take their varying loads along with their varying load angles, and they are also analyzed to give their rotordynamic coefficients. Then, a complex rotordynamic analysis of the compressor pinion-impeller rotor-bearing system is carried out to evaluate its stability, whirl natural frequencies and mode shapes, and unbalance responses under various loading conditions. Results show that the bearings and entire rotor system are well designed regardless of operating conditions, i.e., loads and operating speeds.

  • PDF

Voltage Control of Power System Connected to a Wind Farm by Using STATCOM and Reactive Power Compensators (STATCOM과 조상설비를 이용한 풍력단지가 연계된 전력계통의 전압제어)

  • Seo, Gyu-Seok;Park, Ji-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.4
    • /
    • pp.2737-2743
    • /
    • 2015
  • The wind power plant must be able to produce reactive power at the POI bus of a wind farm connected to power system to keep or control the voltage of POI bus. But, the reactive power capability of wind turbines may not be sufficient to control the voltage of POI bus due to the reactive power losses in connection lines between wind farm and POI bus. The solution of this problem is to install an external STATCOM. The proposed cooperative control method of STATCOM and conventional reactive power compensators such as Switched-shunt and tap changing transformer can control the voltage of POI bus more efficiently. The simulation results are shown that the voltage drop of POI Bus of Test System with the arbitrary load change rate to initial loads is improved more than 60% and the voltage of load bus is maintained more than 95% of rated voltage.

Secondary Indirect Constant Voltage Control Technique for Hybrid Solid State Transformer using Primary Side Information (하이브리드 반도체 변압기의 1차측 정보를 이용한 2차측 간접 정전압 제어 기법)

  • Lee, Taeyeong;Yun, Chun-Gi;Cho, Younghoon
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.25 no.5
    • /
    • pp.420-423
    • /
    • 2020
  • This study proposes an indirect constant voltage control algorithm for hybrid solid-state transformers (HSSTs) by using primary side information. Considering the structure of HSSTs, measuring voltage and current information on the primary side of a transformer is necessary to control the converter and inverter of the power converter. The secondary side output voltage is measured to apply the conventional secondary side constant voltage control algorithm, and thus, the digital control board requires the same rated insulation voltage as that of the transformer. To solve this problem, the secondary voltage of the transformer obtained from the tap voltage is used. Moreover, output voltage decreases as load increases because the proposed indirect constant voltage control scheme does not consider the cable impedance between the secondary output terminal and the load. This study also proposes a technique for compensating the secondary output voltage by using the primary current of the transformer and the resistance value of the cable. An experiment is conducted using a scale-down HSST prototype consisting of a 660 V/220 V tap transformer. The problem of the proposed indirect constant voltage control strategy and the improvement effect due to the application of the compensation method are compared using the derived experimental results.

A Feasibility Study of Loading Test for Safety Assessment : Concrete Bridges (재하시험 수행에 관한 적정성 연구 : 콘크리트 교량)

  • Hwang, Jin Ha;An, Seoung Su;Kim, Ju Han
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.6
    • /
    • pp.147-155
    • /
    • 2011
  • The bridges where serious damages, defects, material degradations, etc. are not found can be presumed to have enough safety for the specified design loads, nevertheless, in many cases the loading carrying capacity is rated through loading tests. The safety specifications and manuals get no further than qualitative instructions for performing loading test or not. Some studies presented the improved appraisal methods for determining the load carrying capacity; however, the feasibility studies for loading test are scarcely carried out. This study examines an existing question, whether the loading tests are necessarily required in the safety assessment or not, and suggests an alternative for that via a statistical analysis for dozens of condition evaluation reports for concrete bridges.

Power Design of an S-Band Transmitter for KSLV-II with Derating (디레이팅을 고려한 한국형발사체 S-밴드 송신기 전원부 설계)

  • Kim, Seokkwon;Kim, Sung-Wan;Hong, Seung Hyun;Kim, Hyo Jong
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.30 no.5
    • /
    • pp.339-347
    • /
    • 2019
  • The power circuit design of an on-board S-band transmitter for KSLV-II with derating(operation of a component at less than its maximum rated specification to enhance reliability) is investigated. The power circuit of the transmitter consists of linear voltage regulators, DC/DC converters for regulating the DC supply, and diodes for reverse voltage protection. After analyzing the load current of the components, derating requirements are explored. Furthermore, power dissipation and junction temperature rise are considered with respect to the load current. The analysis is compared to the results from an engineering model of the transmitter. The temperature of the components is derated by >$40^{\circ}C$ in an environment where the ambient temperature is $+60^{\circ}C$, which is the acceptance test specification of high temperature.

Soft Start System of Induction Motor using Emergency Generator (비상 발전기를 이용한 유도전동기의 소프트 기동 시스템)

  • Hwangbo, Chan;Ko, Jae-Ha;Lee, Jung-Hwan;Park, Seong-Mi;Park, Sung-Jun
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.3
    • /
    • pp.433-441
    • /
    • 2022
  • In general, in an emergency generator system for an electric facility including an induction motor load, an emergency power generation facility larger than the facility load capacity is built due to the initial starting current of the induction motor. In order to reduce this economic burden, various methods to reduce the inrush current of induction motors are applied to suppress the additional expansion of generators due to the reduction of power generation facilities and the increase in electrical facilities. Among these methods, when a system with a built-in soft start function of an induction motor using an inverter is built, it is the best way to reduce the inrush current of the induction motor to less than the rated current. However, in this case, the installation cost of the inverter to drive the induction motor increases. This paper proposes a soft start method of an induction motor by expanding the frequency and voltage control operation area of an emergency generator. In addition, proposed a speed calculation method based on power factor information, which is essential information for stable soft start of an induction motor, and a method for generating a speed command value of the governor for starting with maximum torque.

A Study on the Response Characteristics of 200MW Gas Turbine Governor System (200MW급 가스터빈 조속기 응답특성에 대한 연구)

  • Han, Young-Bok;Nam, Kang-Hyun;Kim, Sung-Ho
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.17 no.4
    • /
    • pp.625-632
    • /
    • 2022
  • Gas turbine generators in load-following operation in the domestic power system play a major role in maintaining the rated frequency, but often have poor frequency control. Therefore, after examining the control characteristics of the governor, which is a gas turbine speed control device, and analyzing the failure types, countermeasures were suggested for each case. In addition, it was confirmed through the governor response test that the gas turbine helps in frequency recovery depending on the speed of fuel control, but also acts as a factor impeding stable operation, such as rapid fluctuations in combustion chamber temperature and combustion vibration. Therefore, in order to maintain stable power quality, there was a need for thorough facility management as well as research on the governor control method in which the traditional PID control method and the machine learning algorithm, a core field of the 4th industry, were fused.

Analysis of the power requirements of a 55 kW class agricultural tractor during a garlic harvesting operation

  • Seung-Min, Baek;Wan-Soo, Kim;Seung-Yun, Baek;Hyeon-Ho, Jeon;Jun-Ho, Lee;Ye-In, Song;Yong, Choi;Young-Keun, Kim;Sang-Hee, Lee;Yong-Joo, Kim
    • Korean Journal of Agricultural Science
    • /
    • v.48 no.4
    • /
    • pp.1039-1050
    • /
    • 2021
  • The purpose of this study is to measure load data for a 55 kW class agricultural tractor during a harvesting operation and to analyze the required power according to the working conditions. A field test was conducted at three different tractor speeds (1.2, 1.3, and 1.4 km·h-1). A load measurement system was developed for the front axles, rear axles, and for power take-off (PTO). The torque and rotational speeds of the axles and PTO were measured during the field test and were calculated as the required power. The results showed that the total required power was in the range of 4.86 - 5.48 kW during the harvesting operation according to the tractor speed, and it was confirmed that this represents a ratio of 8.8 - 10.0% of the engine rated power. Also, it was confirmed that the required power of the axle and PTO increased as the tractor speed increased. In future studies, we plan to supplement the measurement system for a tractor to include a hydraulic system and perform a field test for harvesting various underground crops.

Cost-Effective APF/UPS System with Seamless Mode Transfer

  • Lee, Woo-Cheol
    • Journal of Electrical Engineering and Technology
    • /
    • v.10 no.1
    • /
    • pp.195-204
    • /
    • 2015
  • In this paper, the development of a cost-effective active power filter/uninterruptible power supply (APF/UPS) system with seamless mode transfer is described. The proposed scheme employs a pulse-width-modulation (PWM) voltage-source inverter and has two operational modes. First, when the source voltage is normal, the system operates as an APF, which compensates for the harmonics and power factor while boosting the DC-link voltage to be ready for the disturbance, without an additional DC charging circuit. A simple algorithm to detect the load current harmonics is also proposed. Second, when the source voltage is out of the normal range (owing to sag, swell, or outage), it operates a UPS, which controls the output voltage constantly by discharging the DC-link capacitor. Furthermore, a seamless transfer method for the single-phase inverter between the APF mode and the UPS mode is also proposed, in which an IGBT switch with diodes is used as a static bypass switch. Dissimilar to a conventional SCR switch, the IGBT switch can implement a seamless mode transfer. During the UPS operation, when the source voltage returns to the normal range, the system operates as an APF. The proposed system has good transient and steady-state response characteristics. The APF, charging circuit, and UPS systems are implemented in one inverter system. Finally, the validity of the proposed scheme is investigated with simulated and experimental results for a prototype APF/UPS system rated at 3 kVA.

A High Efficiency Converter for Battery Hybrid Power System of Electric Vehicles (전기자동차의 배터리 하이브리드 전원시스템용 고효율 컨버터)

  • Tran, Dai-Duong;Lee, Hyun-Hwa;Choi, Woojin
    • Proceedings of the KIPE Conference
    • /
    • 2016.07a
    • /
    • pp.333-334
    • /
    • 2016
  • This paper proposes a new cascoded configuration for hybrid energy storage system (HESS) which consists of batteries and supercapacitor (SC) for Electric Vehicle applications. In this configuration,a resonant LLC converter is interfacedin series with a battery module and it converts a part of the energy from the batteries and transfer it to the dc-link bus. The LLC converter is controlled by a phase-shift angle between the primary and secondary switches to maintain a constant dc-link voltage and obtain soft-switching conditions for all the primary switches. By placing the SC moduleina cascoded concept, the rated voltage of SC can be reduced significantly compared with the conventional topologies. It helps save the cost and reduce the number of SC cells. The proposed configuration can operate with four different modes: feeding load, acceleration, regenerative braking andSC charging. A scaled-down prototype converter (2 kW, 600V output) is designed and tested to verify the advantages of the proposed topology. The maximum efficiency obtained with the proposed topology is 99%.

  • PDF