• Title/Summary/Keyword: Ramp Junction

Search Result 41, Processing Time 0.024 seconds

Determination of Minimum Spacing between Off-ramp Terminus and Intersection Considering the Influence of Adjacent Signalized Intersections (신호교차로 영향에 따른 도시고속도로 유출연결로 최소이격거리에 관한 연구)

  • Kim, Sang-Gu;Sim, Dae-Yeong;Heo, Du-Wan
    • Journal of Korean Society of Transportation
    • /
    • v.25 no.4
    • /
    • pp.79-87
    • /
    • 2007
  • The interchanges of urban freeways have many problems with traffic operation due to high off-ramp flows and frequent congestion at adjacent intersections. The flow exiting from off-ramps is affected by the operational status and traffic volume conditions of the nearest signalized intersection. As a result, off-ramp flow cannot exit and the queue backs up the freeway mainline when queues from the signalized intersection form up to the junction of the off-ramp and street. The spacing between an off-ramp and an adjacent intersection is likely to determine the traffic conditions at the adjacent intersection. However, the current design guidelines do not consider such a factor. This study is to develop a model calculating the spacing between off-ramps and adjacent intersections considering the signal, traffic, and road conditions. The variables affecting the model in this study are effective green time (g/C), volume-capacity ratio (v/c), the number of lanes, and off-ramp volume. Various scenarios are designed to represent the effects of the variables and the road networks are constructed using VISSIM, which is a common traffic micro-simulation software package. The queue length is derived from VISSIM and this length is considered as the recommended spacing between the off-ramp and the adjacent intersection. Through the simulation analysis, regression models are developed to calculate the queue length reflecting the various conditions such as signals, traffic, and road configurations. The developed model can be used to create road design guidelines to determine the location of off-ramps in the planning stage.

Electrostatic Discharge Analysis of n-MOSFET (n-MOSFET 정전기 방전 분석)

  • 차영호;권태하;최혁환
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.11 no.8
    • /
    • pp.587-595
    • /
    • 1998
  • Transient thermal analysis simulations are carried out using a modeling program to understand the human body model HBM ESD. The devices were simulated a one-dimensional device subjected to ESD stress by solving Poison's equation, the continuity equation, and heat flow equation. A ramp rise with peak ESD voltage during rise time is applied to the device under test and then discharged exponentially through the device. LDD and NMOS structures were studied to evaluate ESD performance, snap back voltages, device heating. Junction heating results in the necessity for increased electron concentration in the space charge region to carry the current by the ESD HBM circuit. The doping profile adihacent to junction determines the amount of charge density and magnitude of the electric field, potential drop, and device heating. Shallow slopes of LDD tend to collect the negative charge and higher potential drops and device heating.

  • PDF

Construction of Speed Predictive Models on Freeway Ramp Junctions with 70mph Speed Limit (70mph 제한속도를 갖는 고속도로 연결로 접속부상에서의 속도추정모형에 관한 연구)

  • 김승길;김태곤
    • Journal of Korean Port Research
    • /
    • v.14 no.1
    • /
    • pp.66-75
    • /
    • 2000
  • From the traffic analysis, and model constructions and verifications for speed prediction on the freeway ramp junctions with 70mph speed limit, the following results were obtained : ⅰ) The traffic flow distribution showed a big difference depending on the time periods. Especially, more traffic flows were concentrated on the freeway junctions in the morning peak period when compared with the afternoon peak period. ⅱ) The occupancy distribution was also shown to be varied by a big difference depending on the time periods. Especially, the occupancy in the morning peak period showed over 100% increase when compared with the 24hours average occupancy, and the occupancy in the afternoon peak period over 25% increase when compared with the same occupancy. ⅲ) The speed distribution was not shown to have a big difference depending on the time periods. Especially, the speed in the morning peak period showed 10mph decrease when compared with the 24hours'average speed, but the speed did not show a big difference in the afternoon peak period. ⅳ) The analyses of variance showed a high explanatory power between the speed predictive models(SPM) constructed and the variables used, especially the upstream speed. ⅴ) The analysis of correlation for verifying the speed predictive models(SPM) constructed on the ramp junctions were shown to have a high correlation between observed data and predicted data. Especially, the correlation coefficients showed over 0.95 excluding the unstable condition on the diverge section. ⅵ) Speed predictive models constructed were shown to have the better results than the HCM models, even if the speed limits on the freeway were different between the HCM models and speed predictive models constructed.

  • PDF

Construction of Speed Predictive Models on Freeway Ramp Junctions with 70mph Speed Limit. (70mph 제한속도를 갖는 고속도로 연결로 접속부상에서의 속도추정모형에 관한 연구)

  • 김승길;김태곤
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 1999.10a
    • /
    • pp.111-121
    • /
    • 1999
  • From the traffic analyses, and model constructions and verifications for speed prediction on the freeway ramp junctions with 70mph speed limit, the following results obtained: ⅰ) The traffic flow distribution showed a big difference depending on the time periods. Especially, more traffic flows were concentrated on the freeway junctions in the morning peak period when compared with the afternoon peak period. ⅱ) The occupancy distribution was also shown to be varied by a big difference depending on the time periods. Especially, the occupancy in the morning peak period showed over 100% increase when compared with the 24hours average occupancy, and the occupancy in the afternoon peak period over 25% increase when compared with the same occupancy.ⅲ) The speed distribution was not shown to have a big difference depending on the time periods. Especially, the speed in the morning peak period shown 10mph decrease when compared with the 24hours' average speed, but the speed did not show a big difference in the afternoon peak period.ⅳ) The analyses of variance showed a high explanatory power between the speed predictive models(SPM) constructed and the variables used, especially the upstream speed. ⅴ) The analysis of correlation for verifying the speed predictive models(SPM) constructed on the ramp junctions were shown to have a high correlation between observed data and predicted data. Especially, the correlation coefficients showed over 0.95 excluding the unstable condition on the diverge sectionⅵ) Speed predictive models constructed were shown to have the better results than the HCM models, even if the speed limits on the freeway were different between the HCM models and speed predictive models constructed.

Effectiveness of the Peripheral Transverse Line as Speed-Reduction Treatment on Korean Expressway Ramps (고속도로 노면표시 감속유도시설 효과평가)

  • Lee, Seongkwan Mark;Lee, Kiyoung;Kim, Seokchool
    • International Journal of Highway Engineering
    • /
    • v.14 no.6
    • /
    • pp.85-92
    • /
    • 2012
  • PURPOSES : Since expressways in South Korea are toll roads, many trumpet type interchanges exist, resulting in the installation of loop ramps very frequently. While the travel speed of the main lane is designed to be 100-110 km/h, the structure of a loop ramp is different and is designed for a minimum speed of 40 km/h. In fact, most of the actual travel speeds measured on the ramp exceed the designated speed, which has been a major problem in traffic safety. In this research, a type of pavement marking speed-reduction treatment called the "Peripheral Transverse Line" is installed on expressway loop ramps in order to study the change of driving speeds after the installation. METHODS : To verify statistically the change, this speed-reduction treatment has been installed on the Chungju interchange and the Yeoju junction. The driving speeds before the installation were compared with driving speeds both one month and five monthsafter the installation. RESULTS : As a result, the reductions of the average driving speeds after the treatment were statistically significant. More specifically, the average driving speeds of the Chungju interchange were reduced by 7.1-7.7 % for its tangent road section, and the speeds decreased by 8.5-9.5 % for its curve section. Similarly, in the Yeoju junction, an average speed reduction of 2.9-4.8 % for its tangent section was measured, along with 3.9% long-term speed reduction for its curve section. CONCLUSIONS : Since the pavement marking speed-reduction treatment has been partially proven to be effective from this research, we expect to expand this treatment and re-confirm the effect from a long-term perspective in the future.

Fabrication of interface-controlled Josephson Junctions by Ion beam damage

  • 김상협;김준호;성건용
    • Progress in Superconductivity
    • /
    • v.3 no.2
    • /
    • pp.168-171
    • /
    • 2002
  • We have demonstrated ramp-edge Josephson junctions using high temperature superconductors without depositing artificial barriers. We fabricated a surface barrier formed naturally during an ion beam etching process and the annealing under the oxygen atmosphere. The experimental results imply that the barrier natures such as the resistivity are varied by the annealing conditions and the ion milling conditions including the beam voltages. Thus, the ann eating and etching conditions should be optimized to obtain excellent junction properties. In optimizing the fabricating factors, the interface-controlled junctions showed resistively shunted junctions like current-voltage characteristics and an excellent uniformity. These junctions exhibited a spread ($1\sigma$) of $I_{c}$ is 10% fur chips containing 7 junctions at 50K.K.

  • PDF

A Study of Accident Models for Highway Interchange Ramps (고속도로 연결로의 교통사고 추정모형 연구)

  • Roh, Chang-Gyun;Park, Chong-Seo;Son, Bong-Soo
    • Journal of Korean Society of Transportation
    • /
    • v.26 no.4
    • /
    • pp.29-40
    • /
    • 2008
  • Although a good understanding of the relationship between highway traffic accidents and highway geometric features is fundamental in highway design and safety, the relationship is not well understood quantitatively. The overall goal of this paper is to formulate a reliable statistical model fitting to historical highway accident data. The model can be used to estimate the effect of road design elements on safety for the practical purposes of highway design applications. En route to achieving this goal, a number of specific research objectives were accomplished: investigate the major design elements affecting highway safety; review the existing modeling approaches in order to assess the relationship between safety and highway design features; and formulate a statistical model fitting to the accident data in order to estimate the interchange ramp junction accident frequency of rural highways.

A Development of the Design Guidelines for Connecting Roads in Highway Rest Area (고속도로 휴게소 연결로 설계 기준 설정에 관한 연구)

  • Lee, Choulsoo;Won, Jaimu
    • International Journal of Highway Engineering
    • /
    • v.15 no.1
    • /
    • pp.143-154
    • /
    • 2013
  • PURPOSES: Design of approach roads of rest areas in highway has many drawbacks such as geometric design elements. There has been traffic accidents occured in these approach roads of rest areas. Thus, design criteria is required in order to protect accidents from being occurred. In case of Korea, geometric structure design criteria of entry facilities, such as toll-gate, interchange, junction etc was established. However there are no presence in a detailed standards for geometric structure of the rest area which affiliated road facilities. METHODS: In this study, analytic on accidents was carried out in regards to the entry of geometric structure of resting areas by utilizing a sight survey and an investigation research of traffic accidents. The survey was targeting 135 general service areas. Collisions with physical channelization and safety facilities occurred due to speeding, rapid entry, and etc at the entrance nose section. At the entrance connector roads, accidents caused by speeding, negligence, over-operation of handle of drivers were main reason of accidents. Discriminant analysis were conducted about geometric elements to distinguish influencing factors for traffic accidents. the lengths and access angles of the entrance connector roads were regarded as to have the high relation with traffic accidents. RESULTS: After classifying the design section of resting areas' entry as well as derive design elements on each section, a speed measurement by targeting entry of rest areas and car behavior surveys were performed, then each element's minimum standard was derived through the analyses. According to the speeds at the starting/end point of entrance connector road, the range of the junction setting angle of the entrance connector road is defined as $12^{\circ}{\sim}17^{\circ}$ and the connector length model was suggested. CONCLUSIONS: Suggest improvement plans for existing rest areas that can be applied realistically. This should be corresponded to the standards of entry and exit of developed rest areas.

Developing Design Guidelines for Rest Area Based on the Traffic Safety (교통안전을 고려한 고속도로 휴게소 설계기준 개발)

  • Lee, Hyun-Suk;Lee, Eui-Eun;Seo, Im-Ki;Park, Je-Jin
    • International Journal of Highway Engineering
    • /
    • v.14 no.3
    • /
    • pp.173-182
    • /
    • 2012
  • Entry and exits of the rest area are sections where designed speed can be rapidly change and also a weak traffic safety section. In addition, two tasks can be performed simultaneously at entry of the rest area, particularly searching for deceleration and parking spaces/parking sides etc. Thus, design criteria is required in order to procure the stability of accessed vehicle. In case of Korea, geometric structure design criteria of entry facilities, such as toll-gate, interchange, junction etc was established. However there are no presence in a detailed standards for geometric structure of the rest area which affiliated road facilities. In this study, Derive problems in regards to the entry of geometric structure of resting areas by utilizing a sight survey and an investigation research of traffic accidents. The survey was targeting 135 general service areas. After Classifying the design section of resting areas' entry as well as derive design elements on each section, a speed measurement by targeting entry of rest areas and car behavior surveys were performed, then each element's minimum standard was derived through the analyses. According to the speeds at the starting/end point of entrance connector road, the minimum length of the entrance connector road is decided as 40m using Slowing-down length formula and based on the driving pattern, the range of the junction setting angle of the entrance connector road is defined as $12^{\circ}{\sim}17^{\circ}$. Suggest improvement plans for existing rest areas that can be applied realistically. This should be corresponded to the standards of entry and exit of developed rest areas.