• Title/Summary/Keyword: Rainfall Rate

Search Result 772, Processing Time 0.025 seconds

A Study on Performance Evaluation for the Bio-retention Non-point Source Pollution Treatment System (생물 저류 방법 적용을 통한 비점오염원 처리시설의 성능평가에 관한 연구)

  • Lee, Jang-Soo;Park, Yeon-Soo;Cho, Wook-Sang
    • Clean Technology
    • /
    • v.19 no.3
    • /
    • pp.295-299
    • /
    • 2013
  • This study was purposed and performed to evaluate removal efficiency of non-point source pollution in the process and system based on bio-retention design criteria regulated by EPA. Basic Column Reactors (BCR) were prepared for optimal determinations of inflow rate of first rainfall runoff and composition and ratio of soil layers. Removal efficiencies of non-point source pollution from synthetic runoff and real first rainfall runoff, directly sampled from motor way and parking lot, were analyzed, respectively. Removal efficiency of SS, BOD, COD, T-N, and T-P were all shown to be more than 80%.

Characteristics of Runoff on Urban Watershed in Jeju island, Korea (제주도 도심하천 유역의 유출특성 해석)

  • Jung, Woo-Yul;Yang, Sung-Kee;Lee, Jun-Ho
    • Journal of Environmental Science International
    • /
    • v.22 no.5
    • /
    • pp.555-562
    • /
    • 2013
  • Jeju Island, the heaviest raining area in Korea, is a volcanic Island located at the southernmost of Korea, but most streams are of the dry due to its hydrological/geological characteristics different from those of inland areas. Therefore, there are limitations in applying the results from the mainland to the studies on stream run-off characteristics analysis and water resource analysis of Jeju Island. In this study, the SWAT(soil & water assessment tool) model is used for the Hwabuk stream watershed located east of the downtown to calculate the long-term stream run-off rate, and WMS(watershed modeling system) and HEC-HMS(hydrologic modeling system) models are used to figure out the stream run-off characteristics due to short-term heavy rainfall. As the result of SWAT modelling for the long-term rainfall-runoff model for Hwabuk stream watershed in 2008, 5.66% of the average precipitation of the entire basin was run off, with 3.47% in 2009, 8.12% in 2010, and root mean square error(RMSE) and determination coefficient($R^2$) was 496.9 and 0.87, respectively, with model efficient(ME) of 0.72. From the results of WMS and HEC-HMS models which are short-term rainfall-runoff models, unless there was a preceding rainfall, the runoff occurred only for rainfall of 40mm or greater, and the run-off duration averaged 10~14 hours.

Structure of Mesoscale Heavy Precipitation Systems Originated from the Changma Front (장마전선 상에서 발생한 중규모 호우계 구조에 대한 연구)

  • Park, Chang-Geun;Lee, Tae-Young
    • Atmosphere
    • /
    • v.18 no.4
    • /
    • pp.317-338
    • /
    • 2008
  • Analyses of observational data and numerical simulations were performed to understand the mechanism of MCSs (Mesoscale Convective Systems) occurred on 13-14 July 2004 over Jindo area of the Korean Peninsula. Observations indicated that synoptic environment was favorable for the occurrence of heavy rainfall. This heavy rainfall appeared to have been enhanced by convergence around the Changma front and synoptic scale lifting. From the analyses of storm environment using Haenam upper-air observation data, it was confirmed that strong convective instability was present around the Jindo area. Instability indices such as K-index, SSI-index showed favorable condition for strong convection. In addition, warm advection in the lower troposphere and cold advection in the middle troposphere were detected from wind profiler data. The size of storm, that produced heavy rainfall over Jindo area, was smaller than $50{\times}50km^2$ according to radar observation. The storm developed more than 10 km in height, but high reflectivity (rain rate 30 mm/hr) was limited under 6 km. It can be judged that convection cells, which form cloud clusters, occurred on the inflow area of the Changma front. In numerical simulation, high CAPE (Convective Available Potential Energy) was found in the southwest of the Korean Peninsula. However, heavy rainfall was restricted to the Jindo area with high CIN (Convective INhibition) and high CAPE. From the observations of vertical drop size distribution from MRR (Micro Rain Radar) and the analyses of numerically simulated hydrometeors such as graupel etc., it can be inferred that melted graupels enhanced collision and coalescence process of heavy precipitation systems.

Control of the Sediment in a Combined Sewer Using a Separation Wall

  • Lim, Bong Su;Kwon, Chung Jin;Kim, Do Young;Lee, Kuang Chun
    • Environmental Engineering Research
    • /
    • v.18 no.2
    • /
    • pp.71-75
    • /
    • 2013
  • This study is to evaluate the effects of the separation wall on the sediment quality and quantity in a combined sewer, by surveying the sewer overflow and sediments during a rainfall. Since the separation wall installed in the combined sewer separates the rainfall and the sewage, the flow rate of the sewage is increased, and the amount of the sediment deposited on the sewer is decreased. One sampling point was the outfall of Daesacheon with a separation wall, and the other was the outfall of Gwaryecheon without a separation wall, in Daejeon metropolitan city. The maximum control of the biochemical oxygen demand (BOD) overflow load was more than 38% in the Daesacheon point with the separation wall, during a rainfall of 0.11 mm/hr. The maximum control of the BOD overflow load was 24% in Gwaryecheon without a separation wall, during a rainfall of 1.0 mm/hr. According to the survey results of the sediment in the sewer, the discharged sediment deposited on the sewer in Gwaryecheon point was about 23% to 28% of the total suspended solid during the rainfall. In addition, the average velocity of sewage in the presence of sediment was about 0.30 m/s, and if the separation wall is installed, it was expected to be about 1.01 m/s, that is 3.4 times more than the same conditions, resulting in the reduction of the sediment deposit.

Considerations on the Specific Yield Estimation Using the Relationship between Rainfall and Groundwater Level Variations (강우 대비 지하수위 변동량을 이용한 비산출율 추정 기법의 적용성 고찰)

  • Kim, Gyoo-Bum;Choi, Doo-Houng;Jeong, Jae-Hoon
    • The Journal of Engineering Geology
    • /
    • v.20 no.1
    • /
    • pp.61-70
    • /
    • 2010
  • In case of groundwater recharge estimation using water table fluctuation method, specific yield affects the accuracy and confidence level of recharge rate. Nevertheless, there have been few studies on the method for the accurate estimation of specific yield in Korea. Specific yield estimated from the relationship between rainfall and groundwater levels is reasonable compared to the other methods. However, lots of factors such as artificial pumping, evapotranspiration by the plants, and a sudden increase in water levels by a heavy rainfall can affect the pattern of groundwater levels' fluctuation and make an over-estimated or under-estimated specific yield. This study obtained a reasonable specific yield by using a daily or 12 hourly average of rainfall and groundwater levels measured in a dry season.

Seasonal characteristics of thermal and chemical stratification in Lake Paldang (팔당호의 계절별 열적 및 화학적 층화 특성)

  • Son, Ju Yeon;Park, Jin Rak;Noh, Hye Ran;Yu, Soon Ju;Im, Jong Kwon
    • Journal of Korean Society on Water Environment
    • /
    • v.36 no.1
    • /
    • pp.1-13
    • /
    • 2020
  • The purpose of this study was to investigate the thermal and chemical stratification in Lake Paldang 2013-2018 weekly using Schmidt's stability index (SSI) and the index of chemical stratification (IC-i). The annual average for SSI was 19.1 g cm/㎠ with the maximum value of 45.3 g cm/㎠ in the summer and the minimum value of 4.8 g cm/㎠ in fall-winter showing seasonal differences as well as increased vertical mixing in the summer. The lake stability increased higher in 2016 as compared with the other period. The most influential factors of thermal stratification were temperature and heavy rainfall. Especially, high water temperature and a prolonged residence duration caused by reduced rainfall and inflows could result in an increase of the stratification period. While decreasing inflow and outflow at the end of the rainfall, the thermal stratification was restrengthened within 7-14 days, and then stabilized rapidly before the rainfall. IC-DO increased with high air temperature in the spring and fall-winter. However increasing sunshine duration and residence time and decreasing rate of outflow caused an increase of IC-DO in the summer. Rainfall (less than 800 mm/year) and discharge (less than 200 CMS) significantly declined in 2015 resulting in IC-DO (0.77) increased more than three times over the other years and bottom water hypoxia occurred. The SSI and IC-i used in this study could be applied to other lakes to understand changes in stratification and mixing dynamics.

Estimation of Areal Reduction Factors for the Youngsan River Basin (영산강유역의 면적우량감소계수 산정)

  • Lee, Jae-Hyung;Koh, Won-Joon;Lee, Yoon-Young;Kim, Dae-Geun
    • Journal of Korea Water Resources Association
    • /
    • v.39 no.10 s.171
    • /
    • pp.813-822
    • /
    • 2006
  • By analyzing the concurrent rainfall data from rainfall gauges positioned in the Youngsan River basin, the areal reduction factors related to the rainfall characteristics of the Youngsan River basin are estimated. The estimated values are compared with the values of the Han River basin, and show that the rate of decrease of the areal reduction factors of the Youngsan River basin are smaller than those of the Han River basin as the basin area is increasing. That is especially true for short-term duration storm events. These findings reveal that the spatial variations in the Youngsan River basin's storms are smaller than the spatial variations of the storms In the Han River basin, due to the size of the two basin areas in addition to the topological characteristics that affect the rainfall distributions.

Effects of Forest Road Construction on Stream Water Qualities(I) - The Variation of Suspended Sediment by Forest Road Construction - (임도개설(林道開設)이 계류수질(溪流水質)에 미치는 영향(影響)(I) - 임도개설(林道開設)에 따른 부유토사량(浮遊土砂量)의 변화(變化) -)

  • Chun, Kun-Woo;Kim, Min-Sik;Ezaki, Tsugio
    • Journal of Korean Society of Forest Science
    • /
    • v.85 no.2
    • /
    • pp.280-287
    • /
    • 1996
  • This study was carried out to investigate the export rate of suspended sediment by different precipitation intensity after forest road construction for torrential streams on three different watersheds with various forest road density(Watershed A : 6.67m/ha, Watershed B : 5.52m/ha, and Watershed C : control) in the Experimental Forest of Kangwon National University. The results were as follows. 1. Closely related to the the amount of rainfall in both 1994 and 1995, the average streanfkiw rate was less than $0.25{\times}10^4m^3/day$ during May and June and $5.0{\times}10^4m^3/day$ during July and August. More than $25{\times}10^4m^3/day$ of streanflow rate was occurred twice in 1994 and seven times in 1995. 2. The amount of suspended sediment in three watersheds was less than standard of drinking water(25mg/l) before road construction with daily rainfall of 74mm, 92mm, and 120mm in 1994, also after road construction with daily rainfall of 21mm and 47mm in 1995. But, under the 192mm of daily rainfall, Watershed C did not show the difference in the amount of suspended sediment, however, Watershed A and B produced 1,525mg/l and 775mg/l, respectively, which is 61 and 31 fold of stabdard of drinking water, and construction to export for 35 hours after rainfall. 3. The maximum amount of suspended sediment was less than the standard of drinking water with light rainfall before and after road construction. Under the 192mm of daily rainfall, the maximum amounts of suspended sediment in Watershed A and B were 13,150mg/l and 2,690mg/l, of 526 and 108 fold of standard of drinking water, respectively, showing obvious water pollution by sedimentation. Results of the study indicated that the forest road construction had great influence on the sedimentation, and getting increased by higher road density and heavier rainfall. Therefore such practices as vegetation covering and soil erosion control facility should be established accompanying with forest road construction to prevent from sedimentation.

  • PDF

A Study on Rainfall-induced Erosion of Land Surface on Reinforced Slope Using Soil Improvement Material (지반 개량재에 의한 보강사면의 강우시 표면침식에 관한 연구)

  • Kim, You-Seong;Kim, Jae-Hong;Bhang, In-Hwang;Seo, Se-Gwan
    • Journal of the Korean Geotechnical Society
    • /
    • v.29 no.1
    • /
    • pp.49-59
    • /
    • 2013
  • Heavy rainfall intensity may cause shallow slope failures and debris flow by rill erosion and scour on land surface. The paper represents the difference between native soil (weathered soil) and reinforced soil, which is mixed by hardening agent with flyash as main material, for investigating experimental findings of rill erosion and erosion. Results obtained from artificial rainfall simulator show that erosion rate of reinforced soil mixed with hardening agent is reduced by 20% because an amount of eroded soil on slope surface is inversely proportional to the increase of soil strength. For example, rainfall of 45mm (at the elapsed time of 25mins in rainfall intensity of 110mm/hr) triggers rill erosion on native soil surface, but the rill erosion on reinforced soil surface does not even occur at 330mm rainfall (at the elapsed time of 3hrs in rainfall intensity of 110mm/hr). As a result of slope stability analysis, it was found that the construction method for reinforced soil surface would be more economical, easy and fast construction technology than conventional reinforcement method.

Evaluation of Sewage Treatment Plant Efficiency in the Variation of Sewage Inflow and Sludge Interface Height by Rainfall (강우로 인한 유입하수량 증가와 슬러지 계면높이 변화에 따른 하수처리장 효율평가)

  • Park, Hye-Sook;Song, Seok Heon
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.36 no.8
    • /
    • pp.549-553
    • /
    • 2014
  • Variation of sewage sludge interface height and flow rate by rainfall were applied to the actual public sewage treatment plant, and the efficiency of sewage treatment was evaluated by measuring $BOD_5$, $COD_{Mn}$, SS, T-N, and T-P. When both flow and interfacial height are increased, the treatment efficiencies in terms of the five water pollutants are decreased. Among them SS is the most critical pollutant in rainfall. When 0.5 Q inflow was applied, the efficiencies were 74.2% at the sludge interface height of 0.5 m, 76.4% at 1.0 m, 70.2% at 1.5 m, and 60.7% at 2.0 m. When 1.0 Q inflow was applied, the efficiencies were 71.7% at the sludge interface height of 0.5 m, 71.9% at 1.0 m, 46.4% at 1.5 m, and -38.0% at 2.0 m. Operation at 2.0 Q~2.0 m and 3.0 Q~1.0 m above the sludge rising phenomenon occurred causing adverse effects on the public bodies. If the flow rate increases, the processing efficiency is reduced from 74.2% to 17.3%, even though the sludge interface height was maintained at 0.5 m, so that the inflow adjustment was most important during rainfall, and the interface height of 1.0 m should be maintained to minimize the adverse effect on public water system.