This paper considers the problem of revising train departure time to reduce electric power consumption of mass rapid transit (MRT) railways. The motion of a train running between stations is divided into three phases: traction, coasting, and deceleration phases. The traction phase requires high electric power to operate MRT railways. In the coasting phase, the train moves stably by consuming little or no power. The deceleration phase is a braking mode and produces some electric power called regenerated brake power owing to inertia force for the train generated In the traction and coasting phases. The regenerative energy can be used by other accelerating trains within a specific range from the train and thereby the power consumptions of train can be reduced. We developed a mixed integer programming model to solve the problem. To validate the suggested model, a computational experiment was conducted using real data from Korea Metropolitan Subway.
As sustainable growth has been emphasized in the field of transportation, the railway system has been promoted as an environmentally-friendly transport mode. However, mode shifts from other transport modes to railway have been sluggish. In this context, to enhance the understanding of railway's competitive advantages and disadvantages, this research evaluates travelers'preferences for public transport modes for inter-regional trips: such understanding should make it possible to formulate effective policy for promoting railways. To this end, passenger recognition of competitive transport modes has been measured by applying multidimensional scaling analysis for six major inter-regional public transport services - KTX, ITX-Samaeul, Mugunghwa-ho, premium express bus, general express bus, and airline. As a result, we can conceptualize the recognition similarity in two-dimensional space, and understand how travelers perceive the six major transport modes.
Since 1971 when the nation wide 'New Community' movement was launched to improve rural standards of living, dol and thatched-roof houses have been reshaped or removed, thereby making it hard to find time-honored people's living structures in the countryside. Since 1977, the improvement work of rural houses has started throughout the country, so many new rural residences have been constructing along the highway, main roads, railways and around the sightseeing area, New rural houses do not show, for the most part, the traditional architectural style and the nation's unique conventional ways of living. The writer tried to find solutions to the problems derived from improvement work of rural residence, in a comparative method of traditional rural houses and newly constructed rural ones. The greater part of new rural houses' types, painting colors, and fence types had been recommended by provincial administrative trative officials. Officials recommended them to the farmer with their standards, which did not consider farmer's convenience of traditional way of life, but a fine sight from the highways or railways. Korea's three basic roof types are the HAPKAK roof (gabled and hipped), the UCHINKAK roof(hipped), and the BAKKOONG roof(gabled). However, the gabled roof houses, having their entrance on the gabled side, are found more ofter in new rural village. As mentioned above, architectural style is not harmonious with the topography and climate i Korea, because it is not Korean traditional type, but one of the western styles. And new rural house plans are inconvenient in the conservation rural family system, because of the same category with urban houses plans. Other problems derived from ton-traditional architecture style are roof painting in 4-5 colors in a new village, types of wall and fence, and attached building in the site.
The Journal of the Convergence on Culture Technology
/
v.5
no.4
/
pp.439-444
/
2019
In this paper, the seismic performance evaluation of the subway lines 1~4 conducted from April 2010 to October 2013 for the existing structures that were not seismically designed based on the seismic design criteria of urban railways was studied. The detailed design of seismic reinforcement for the facilities requiring seismic reinforcement was summarized through the detailed design of the seismic reinforcement construction conducted from March to December 2018. As a result of the evaluation, 53.2km (total project cost of 322 billion won) of 141.5km of Lines 1~4 were considered to require seismic reinforcement, and finally, the company aims to secure a 100% earthquake-proof rate to withstand earthquake-scale 6.5 by 2020. This paper can be used as basic research data to evaluate and reinforce seismic performance of urban railways in the future.
Building Information Modeling, which was applied mainly in the construction sector, is expanding to the road sector, and the government recently recommends preparing individual application guidelines considering the characteristics of detailed fields such as railways, ports, and complexes through BIM implementation guidelines. Compared to general construction projects, a lot of the works such as signals, electricity, and power, and the railway BIM 2030 roadmap has been presented to apply BIM to railway construction projects that require business consultation and work environment review with various local governments, and pilot projects are in operation. Unlike a general building, in which the construction begins after the detailed design is completed, in the railway project, the detailed design of other works proceeds along with the roadbed construction. Because construction and design work together, railways need to coordinate detailed engineering interfaces such as trajectories, signals, and power, and the application of BIM in design interface coordination has the advantage of maximizing the effectiveness of pre-review. Overseas railway construction projects actively used BIM to adjust design interfaces and had a collaboration process to modify BIM models and create construction details from the revised models through regular meetings with suppliers. Therefore, this study aims to derive the factors necessary for establishing a BIM collaboration environment based on a survey of practitioners as a preliminary step for establishing the BIM collaboration process of the railway construction project.
Zheng-Wei, Chen;Syeda Anam, Hashmi;Tang-Hong, Liu;Wen-Hui, Li;Zhuang, Sun;Dong-Run, Liu;Hassan, Hemida;Hong-Kang, Liu
Wind and Structures
/
v.35
no.5
/
pp.309-322
/
2022
Due to the complex terrain around high-speed railways, the windbreaks were established along different landforms, resulting in irregular windbreak transition regions between different subgrade infrastructures (flat ground, cutting, embankment, etc). In this paper, the effect of a windbreak transition on the wind flow around railways subjected to crosswinds was studied. Wind tunnel testing was conducted to study the wind speed change around a windbreak transition on flat ground with a uniform wind speed inflow, and the collected data were used to validate a numerical simulation based on a detached eddy simulation method. The validated numerical method was then used to investigate the effect of the windbreak transition from the flat ground to cutting (the "cutting" is a railway subgrade type formed by digging down from the original ground) for three different wind incidence angles of 90°, 75°, and 105°. The deterioration mechanism of the flow fields and the reasons behind the occurrence of the peak wind velocities were explained in detail. The results showed that for the windbreak transition on flat ground, the impact was small. For the transition from the flat ground to the cutting, the influence was relatively large. The significant increase in the wind speeds was due to the right-angle structure of the windbreak transition, which resulted in sudden changes of the wind velocity as well as the direction. In addition, the height mismatch in the transition region worsened the protective effect of a typical windbreak.
KSCE Journal of Civil and Environmental Engineering Research
/
v.28
no.5D
/
pp.735-740
/
2008
The Design manual for adjusting the capacity and LOS of facilities has been shared in urban railways and high-speed railway stations. However, the pattern of urban railways users and those of high-speed railway users are different from each other. For an example, the high-speed railway users tend to carry voluminous luggages and the transportation disadvantaged such as children and the elderlies. Accordingly, we see that the scale of facilities and the station itself should be constructed differently. The transfer facilities in the high-speed railway stations are classified widely into walking assisting facilities and convenient facilities. We invented the concept of PME (Pedestrian Moving Equivalent) and PWE (Pedestrian Waiting Equivalent)for the spatial calculation of those who are with wheeled luggages, back packs, and children to reflect the uniqueness of users in high-speed railway stations. These equivalents have been applied to the design of the facilities to asses the new Capacity and LOS that are users' favored.
Proceedings of the Korean Society for Noise and Vibration Engineering Conference
/
2009.10a
/
pp.816-816
/
2009
In order to attenuate structural waves in railway track, damped mass-spring absorber system and spring supported system are considered that are attached continuously along the beam length. A mathematical model is presented for the propagation of structural waves on a finitely long, periodically supported classical beam. The model in this paper could represent a railway track where the beam represents the rail and an appropriately chosen support type represents the pad/sleeper/ballast system of a railway track. And in this study, it is presented that the measurement method of health monitoring of railway track.
Highlighted is significance of the floating slab track for mitigating vibrations induced by train, together with the recent trends towards speed-up of railways. In the design of the floating slab track, it is more beneficial to increase the slab length since a significant impact can be induced on the train and track at the discontinuous points between slabs with the finite slab length. However, if the slab length is too long, the tensile stress of slab concrete and the additional stress on rail due to the temperature change and shrinkage of concrete slab. Thus it is of great importance to relevantly determine the slab length. In this study, to understand these phenomena and establish the countermeasures, the dynamic behaviors of train and track at the inter-slab discontinuous points have been explored and the effect of dowel joints as one of countermeasures has been analytically investigated.
Kim, Young-Kyu;Park, Se-Young;Kim, Kwan-Soo;Song, Jeong-Hun;Cho, Seong-Kun;Lee, Han-Min
Proceedings of the KSR Conference
/
2011.05a
/
pp.1364-1371
/
2011
Advanced EMU completed a production of test train, composed of 6 cars, after 5 years of development process, and it is currently under the process of integrated test and evaluation to inspect performance of car system, efficiency of transport, safety, punctuality, energy efficiency in accordance with urban railways act at Daebul test line. Advanced EMU was produced under consideration of transportation capacity, maintainability, reliability, energy saving, convenience of passengers, and traffic-vulnerables, so it has an epochal difference from former EMU system. And advanced EMU assures operation management from manager's perspective and efficiency of maintenance for practicalization of car and individual equipment. This paper introduces each major equipment of advanced EMU which is based on many years of experience of management and maintenance.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.