• 제목/요약/키워드: Railway signaling systems

검색결과 116건 처리시간 0.023초

틸팅차량 완화곡선 증속 주행시 궤도작용력 검토 (A Study on the Rail Pone of Transition Curve Track to Speed Up of Tilting train)

  • 신태형;최정열;엄기영;박용걸
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.529-538
    • /
    • 2009
  • A trial run of locally-developed tilting train has been in process on Chungbuk line since the test vehicle was first produced. For the system stabilization, interface verification among the systems including track, structure, catenary and signaling system, not to mention the rolling stock, is very crucial. Therefore, in this study, the dynamic rail force of the tilting (Hanvit 200), high-speed (KTX) and general (Mugunghwa) vehicle caused by driving in transition curve track was measured. And, it compared the tilting response with the other by using the measured wheel load data in transition curve track, and then evaluated probability the range of wheel load fluctuation for the variable dynamic vertical and lateral wheel load. As a result, a range of wheel load by occured a change of cant from the high-speed and general vehicle which had fixed bogie structure was distributed throughout small deviation (${\Delta}8{\sim}13kN$). Otherwise, in case of the tilting train which was consisted of the pendulum bogie structure was distributed wide range about large deviation (${\Delta}25{\sim}28kN$) by changed of cant.

  • PDF

CBTC 시스템에 대한 시스템 수준의 시험평가 방안 연구 (A Study on the System-level Test and Evaluation for the CBTC System)

  • 이영훈;이재천
    • 조명전기설비학회논문지
    • /
    • 제22권12호
    • /
    • pp.115-121
    • /
    • 2008
  • 현재 추진되고 있는 무선통신을 기반으로 하는 열차제어시스템 개발 프로젝트에서는 상호운영성 및 상호교환성을 고려하는 하부시스템의 개발을 목표로 하고 있다. 이 프로젝트는 상위 시스템 수준의 설계보다는 주로 하부시스템의 설계에 집중되어 있다. 시스템에 대한 시험평가는 시스템 사양에 대한 만족 여부를 확인하는 것이며, 이에 따라 시스템 수준으로 통합된 시스템 사양서가 필요하다. 본 연구에서는 시스템 사양서가 마련되지 않은 하부시스템의 설계단계에서 최상위 시스템 수준의 시험평가에 대한 방안을 제시하였다.

철도신호시스템 중첩운영으로 인한 전자파장해현상 분석 및 대책 (Analysis of EMI Between Overlapped Railway Signalling Systems and Its Countermeasure)

  • 고영환;윤선호;최규형
    • 전기학회논문지
    • /
    • 제58권6호
    • /
    • pp.1116-1122
    • /
    • 2009
  • ATS(Automatic Train Stop) system makes train stop when it runs over the speed limit and ensure the safe operation of train. Seoul Metro line 2 in Korea, which started its passenger service in 1982, has adopted ATS system for its signaling system. The ATS system has only a train stop function at the time of emergency, and Seoul Metro is planning to replaced them with ATC(Automatic Train Control)/ATO(Automatic Train Operation) system which can provide the dedicated speed control for headway reduction and automatic operation of train. Until all the ATS system is replaced with the new ATC system, both systems are to operate simultaneously at the same metro line. In this situation, ATS system sometimes reveals improper operation: train stops suddenly without any obstacles in front of it. These emergency stops cause interruption of passenger service, and abnormal abrasion of wheels and rail. This paper makes it clear that these interruptions are caused by EMI phenomena between ATS on-board device and ATC wayside device : Signal current flowing in AF track circuit of ATC is turn out to be a EMI source that prevent normal operation of the ATS on-board device. Although the two systems have different frequency-ranges (ATS system has frequency range between $78{\sim}130$[kHz] and ATC system has frequency range between $9.5{\sim}16.5$[kHz]), it turned out that EMI phenomena appears between the both systems. This is investigated by measuring the output signal from ATS on-board device passing over ATC wayside device. The FFT(Fast Fourier Transform) analysis of the signal reveals that AF track circuit signal is transmitted to the ATS on-board device and induce noise causing improper operation. The countermeasures to the EMI phenomena are examined in three ways; blocking EMI transmission, enforcement of EMS (Electromagnetic Susceptibility) of ATS on-board device, and blocking the EMI source. It is suggested that the practical solution be blocking EMI source temporarily, that is breaking AF track circuit signal when the trains with ATS on-board device pass over it. To this purpose, TODS(Train Occupation Detection System) is developed, and has made a success in preventing the EMI problem of Seoul Metro line 2.

KTX산천 귀선전류고조파가 일반선 TI-21형 AF궤도회로에 미치는 영향분석 (Effect Analysis of Classical Line TI-21 type Audio Frequency Track Circuit from KTX Sancheon Return Current Harmonics)

  • 최재식;김희식;박주훈;김범곤
    • 한국철도학회논문집
    • /
    • 제19권1호
    • /
    • pp.38-45
    • /
    • 2016
  • KTX산천 고속차량에서 사용하는 전력변환시스템은 전력전자기술, 고속 대용량 반도체소자 및 마이크로프로세서의 기술발달에 힘입어 높은 성능과 효율, 안전성, 에너지 소비측면에서 뛰어난 제어능력을 갖추게 되었다. 하지만 고속스위칭소자인 IGBT를 사용함에 따라 발생하는 고조파로 인해 전기차량은 물론 변전소, 신호시스템, 데이터전송 및 감시시스템 등 선로변 신호설비에 문제를 야기시켰다. 특히 전력변환장치의 정수배 부근 주파수에서 발생하는 귀선전류고조파의 영향으로 TI-21 무절연AF궤도회로가 부정 동작하는 사례가 발생되었다. 본 논문은 고속전기차량과 궤도회로간 귀선전류고조파 이동경로 분석을 위하여 실제 현장에서 측정 및 분석방법을 제시하였다. 이러한 분석결과는 향후 신규로 도입되는 고속전기차량, AF궤도회로, 공동접지망 설계 시 폭넓게 반영될 것으로 기대된다.

국가 R&D 성과품 상용화 추진을 위한 제도개선방안 연구 (경량전철을 중심으로) (System Improvement Research for Commercial Propulsion about Government R&D Product(In Case of LRT))

  • 홍재성;박광복;류상환;이안호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.322-330
    • /
    • 2009
  • Traffic congestions in local cities have been getting worse since 1990s, so many local governments have considered the introduction of an LRT system. So far, there is no city operating the LRT due to social environments, financial reasons, feasibility and so on. But still many cities have examined LRT or started the construction. Until now, more than 30 cities are constructing LRT or planning the introduction of LRT and it becomes 96 routes, approximately 700km. With the support of MLTM, KRRI has developed automatic LRT system with rubber-wheels, K-AGT as a result of "LRT system technology development project" from 1999 to 2005 by investing 50.32 billion wons(the public 37, the private 13.32) and finished running durability test of 100,000km at Kyeong-san test line. Currently, two trains, coupled two cars respectively have running and signaling tested. K-AGT was appointed to supply for an extension line at Busan Subway Line 3(Minam-Anpyeong section) with 17 trains(six-unit car) 102 cars. However, except for Minam-Anpyeong section, other cities such as Uijeongbu, Yongin, Daegu(Line 3) and Kwangmyeong decided to use the foreign systems, not to use the product, a result of national R&D project. This results in a huge waste of foreign currency and it is expected to require much additional cost for maintenance. If local governments use the products of national R&D projects, many national benefits such as reducing imports and protecting home industries could be expected, therefore in this paper, some plans to encourage to use products of national R&D projects were dealt with.

  • PDF

틸팅차량 주행에 따른 기존선 곡선 궤도의 거동 특성 (Characteristics of Curved Track Behaviors according to Traveling Tilting Train)

  • 박용걸;최정열;성덕룡;천대성
    • 한국철도학회논문집
    • /
    • 제10권6호
    • /
    • pp.692-700
    • /
    • 2007
  • 국내에서 개발된 한국형 틸팅열차는 현재 시제차량 제작을 마치고, 충북선을 시작으로 시운전 시험이 단계적으로 진행되고 있다. 시운전 시험에서는 한국형 틸팅열차의 시스템 안정화를 위해 차량 외에 궤도, 구조물, 전차선, 신호 등 각 시스템 상호간의 인터페이스 검증이 필요하며, 선로구축물 분야에서는 개발차량의 증속이 궤도구조에 미치는 영향을 비롯한 궤도부담력 검토를 통해 궤도구조의 안정성과 주행안정성 평가가 수행되어야 한다. 따라서 본 연구에서는 틸팅차량이 기존선 선로중 취약개소인 곡선부를 증속할 때 궤도에 미치는 영향을 검토하고자, 현재 시운전 시험이 진행되고 있는 충북선 및 호남선 구간 중 일부 선호를 대상으로 틸팅차량 주행이 기존선 궤도성능에 미치는 영향을 분석하였다. 틸팅열차, 고속열차 및 일반열차(무궁화, 화물)가 기존선 주행시 궤도각부의 거동특성을 파악하기 위해 윤중, 횡압, 레일 휨응력, 레일 수직 횡변위, 침목 수직변위 등을 측정하여 비교 분석함으로써 향후 기존선 속도향상을 위해 투입될 틸팅차량이 궤도에 미치는 영향을 평가하였다.