A trial run of locally-developed tilting train has been in process on Chungbuk line since the test vehicle was first produced. For the system stabilization, interface verification among the systems including track, structure, catenary and signaling system, not to mention the rolling stock, is very crucial. In the area of wayside structure, the stability of track structure and train run shall be evaluated through the review of impact by increased speed by developed train on track structure. The study thus was intended to evaluate the impact on track while a tilting train is running the conventional line(ballast track), which is vulnerable to accelerated train speed. The evaluation of tilting train test running the part of Honam line was conducted to identify the impact on existing track performance by tilting train. To identify the performance of each part of track components while tilting train and high speed train were running the existing line, wheel load, rail bending stress, vertical displacement of rail and sleeper were compared so as to evaluate the expected impact by tilting train for improving the train speed.
A trial run of locally-developed tilting train has been in process on Chungbuk line since the test vehicle was first produced. For the system stabilization, interface verification among the systems including track, structure, catenary and signaling system, not to mention the rolling stock, is very crucial. Therefore, in this study, the dynamic rail force of the tilting (Hanvit 200), high-speed (KTX) and general (Mugunghwa) vehicle caused by driving in transition curve track was measured. And, it compared the tilting response with the other by using the measured wheel load data in transition curve track, and then evaluated probability the range of wheel load fluctuation for the variable dynamic vertical and lateral wheel load. As a result, a range of wheel load by occured a change of cant from the high-speed and general vehicle which had fixed bogie structure was distributed throughout small deviation (${\Delta}8{\sim}13kN$). Otherwise, in case of the tilting train which was consisted of the pendulum bogie structure was distributed wide range about large deviation (${\Delta}25{\sim}28kN$) by changed of cant.
Kim, Joo-Uk;Oh, Se-Chan;Sim, Sang-Hyun;Kim, Young-Min
Journal of the Korea Academia-Industrial cooperation Society
/
v.17
no.8
/
pp.352-362
/
2016
Today, it appears that the rapid advances in technology have allowed broadening both the system technology and the business opportunities in the rail industry. Owing to the developments in technology and the industry, and also due to the hearth, the latest high-speed trains and a variety of unattended operations in rail systems are being developed and are operational. In particular, this study covers the existing railway rolling stock and signaling systems that operate in an environment more complex than the concept of localized management, so the introduction of a new signaling system is needed. In addition, developments based on the existing signal system concepts for passenger railways need to minimize human injury. In this study, to participate in the development of new systems in a variety of domains and to provide an integrated common vision methodology as an engineer on the basis of efficient signal system design and safety would like to present the methodology for action. Therefore, each different linkage through the next new domain zone system design: design through to secure the integrity of safety than can secure methodology.
The Transactions of The Korean Institute of Electrical Engineers
/
v.58
no.6
/
pp.1116-1122
/
2009
ATS(Automatic Train Stop) system makes train stop when it runs over the speed limit and ensure the safe operation of train. Seoul Metro line 2 in Korea, which started its passenger service in 1982, has adopted ATS system for its signaling system. The ATS system has only a train stop function at the time of emergency, and Seoul Metro is planning to replaced them with ATC(Automatic Train Control)/ATO(Automatic Train Operation) system which can provide the dedicated speed control for headway reduction and automatic operation of train. Until all the ATS system is replaced with the new ATC system, both systems are to operate simultaneously at the same metro line. In this situation, ATS system sometimes reveals improper operation: train stops suddenly without any obstacles in front of it. These emergency stops cause interruption of passenger service, and abnormal abrasion of wheels and rail. This paper makes it clear that these interruptions are caused by EMI phenomena between ATS on-board device and ATC wayside device : Signal current flowing in AF track circuit of ATC is turn out to be a EMI source that prevent normal operation of the ATS on-board device. Although the two systems have different frequency-ranges (ATS system has frequency range between $78{\sim}130$[kHz] and ATC system has frequency range between $9.5{\sim}16.5$[kHz]), it turned out that EMI phenomena appears between the both systems. This is investigated by measuring the output signal from ATS on-board device passing over ATC wayside device. The FFT(Fast Fourier Transform) analysis of the signal reveals that AF track circuit signal is transmitted to the ATS on-board device and induce noise causing improper operation. The countermeasures to the EMI phenomena are examined in three ways; blocking EMI transmission, enforcement of EMS (Electromagnetic Susceptibility) of ATS on-board device, and blocking the EMI source. It is suggested that the practical solution be blocking EMI source temporarily, that is breaking AF track circuit signal when the trains with ATS on-board device pass over it. To this purpose, TODS(Train Occupation Detection System) is developed, and has made a success in preventing the EMI problem of Seoul Metro line 2.
Considering structure of depot, it is impossible to install the track circuit systems due to iron-beam. Because rails and earth are connected by the iron-beam, there is much leakage current. So, it is hard to apply the track circuit systems. Thus, when trains go to the depot, sign which indicates existence of trains is used manually. In case of wrong sign, accidents occur such as train crash, derailment etc. Currently, location of trains has been found by using optical sensor in the depot to prevent the accidents. However, it costs a great deal to install and maintain the optical sensor. Therefore, this method is hardly used in train operation institutes. In this paper, virtual track circuit systems are introduced by using software program in the depot. Also, algorithm of the virtual track circuit systems is proposed. In case that signal is handled to the depot which is occupied by the train, safety is ensured by indicating sign which means existence of trains and stop signal. Also, proper fault tolerance techniques are proposed to the software by analyzing reliability and availability.
When a train is delayed because of a disturbance, the time interval between successive trains increases and high-frequency metro lines can become unstable. Time interval control is therefore necessary in preventing such instabilities. In this paper, we propose an optimal interval control algorithm that is easy-to-implement and that guarantees system stability. In the proposed method, the controlled trains are determined from the time interval deviations between successive trains; the control algorithm for staying time is designed by use of a discrete traffic model to ensure an optimal time interval between successive trains. The results of a computer simulation are also given to demonstrate the validity of the proposed algorithm.
Journal of the Korea Academia-Industrial cooperation Society
/
v.16
no.5
/
pp.3455-3461
/
2015
LTE and Wi-Fi networks provide wireless communication services to passengers in subway where the number of network access fluctuates according to passenger movement. While the number of network access increase, LTE can provide stable communication service but Wi-Fi suffers temporal access delay to network. This paper analyzes the increase in access delay of Wi-Fi network according to increasing user in subway section by making mathematical modeling of Wi-Fi network and simulation study. The access delay characteristics of Wi-Fi network is measured along an subway line and the results are compared to the theoretical study. These results can be applied to the connection method to build an efficient network structure between LTE and Wi-Fi interworking network and the future introduction of LTE-R.
The Transactions of The Korean Institute of Electrical Engineers
/
v.64
no.5
/
pp.830-837
/
2015
A study which is to develop the low-cost urban railway system for low-density line such as Gwang-ju subway Line 2 is in progress, and its TCS(Train Control System) is required as an economic system which is able to train operation suitable in low-density line. We have developed the signaling equipment which is configured with automatic block system between stations, and the control center's equipment in order to meet the requirements of TCS mentioned above. In this paper, we propose the control procedure of ATS to be required for train operation management in the low-density line such as Gwang-ju subway Line 2. The control procedure of ATS considered all features such as the requirements analysis for train operation management, the functions of train control system to be applied and the block type. Also, it considered the station(interlocking, passenger, turn-back) type, station control(stop, route, departure, turn-back departure, turn-back) type, and train operation management for exiting and entering depot. The ATS control procedure proposed in this paper has an advantage in the cost and efficiency through unification and optimization of its function. And in cost of operating and maintenance, the ATS system has a feature that can be significantly reduced.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.28
no.8
/
pp.90-97
/
2014
This paper presents a compensation method of unbalanced phase currents in interleaved bi-directional converters. Phase currents in interleaved bi-directional converter are apt to be unbalanced due to circuit parameter error and switch operation difference. This problem causes the switch element failure and the reduced efficiency of the converter. Therefore, it is necessary that a certain balance control algorithm is provided in interleaved bi-directional converter system. In this paper, a balance control algorithm based on the circular chain control method is proposed. Further, in order to reduce the number of phase current sensors, this paper shows a simple method in which phase currents can be extracted indirectly through a DC-link current sensor in both charging and discharging modes. The validity and the effectiveness of the proposed phase currents balance control algorithm are illustrated through the simulation results.
Traffic congestions in local cities have been getting worse since 1990s, so many local governments have considered the introduction of an LRT system. So far, there is no city operating the LRT due to social environments, financial reasons, feasibility and so on. But still many cities have examined LRT or started the construction. Until now, more than 30 cities are constructing LRT or planning the introduction of LRT and it becomes 96 routes, approximately 700km. With the support of MLTM, KRRI has developed automatic LRT system with rubber-wheels, K-AGT as a result of "LRT system technology development project" from 1999 to 2005 by investing 50.32 billion wons(the public 37, the private 13.32) and finished running durability test of 100,000km at Kyeong-san test line. Currently, two trains, coupled two cars respectively have running and signaling tested. K-AGT was appointed to supply for an extension line at Busan Subway Line 3(Minam-Anpyeong section) with 17 trains(six-unit car) 102 cars. However, except for Minam-Anpyeong section, other cities such as Uijeongbu, Yongin, Daegu(Line 3) and Kwangmyeong decided to use the foreign systems, not to use the product, a result of national R&D project. This results in a huge waste of foreign currency and it is expected to require much additional cost for maintenance. If local governments use the products of national R&D projects, many national benefits such as reducing imports and protecting home industries could be expected, therefore in this paper, some plans to encourage to use products of national R&D projects were dealt with.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.