• Title/Summary/Keyword: Railway signaling system

Search Result 224, Processing Time 0.026 seconds

A Study on the Rail Rupture Detection by the Return Current (귀선전류를 이용한 레일절손 검지에 관한 연구)

  • KIM, Yong-Kyu;YOON, Yong-Ki;LEE, Jong-Hyun;KWAK, Woo-Hyun;LEE, Kwang-Hee
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.7
    • /
    • pp.1303-1310
    • /
    • 2016
  • The track circuit carries out a train detection using a electrical closed loop, and incidentally it detects the rail rupture using the track circuit current flowing rail. However, in the case of the axle counter or the Radio based train control system, it requires a new way for detecting the rail rupture because of not using the track circuit. To solve this problem, it periodically checks non-steady state of rail by the track inspection car. but real-time detection of the rail rupture is impossible. Therefore, this paper analyzed feasibility to realize a real-time detection of rail rupture by using the return current.

Design of a Fault-tolerant Embedded Controllerfor Rail-way Signaling Systems

  • Cho, Yong-Gee;Lim, Jae-Sik
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2002.10a
    • /
    • pp.68.4-68
    • /
    • 2002
  • $\textbullet$ This report presents an implementation a set of reusable software components which use of fault-tolerance embedded controller for railway signalling systems. These components can be used in real-time applications without application reprogramming. $\textbullet$ This library runs under VxWorks operating system and is oriented on real-time embedded systems. The library includes fault detection, fault containment, checkpointing and recovery components. $\textbullet$ The library enables to support high-speed response to fault occurrence in application software. Garbage collector together with VxWorks Watchdog provides both dead tasks detection and useless resources removing to avoid an overflow. Control flow...

  • PDF

Construction and Development of Turnout on concrete roadbed applicable to high speed railway (고속철도 적용을 위한 콘크리트 도상 분기기 개발 및 부설)

  • Park, Choon-Bok;Kwon, Ho-Jin;Jeon, Se-Gon;Yoon, Byung-Hyun;Oh, Soo-Jin;Choi, Yong-Seok
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1223-1228
    • /
    • 2007
  • Since KHSL 2nd phase was adapted as a main track design, the interests of concrete slab track system have been gradually increased in the division of rail track engineering and many engineering companies have been trying to adapt a concrete slab track system at this moment. Advantages of this system proved in advanced country, japan and Germany etc. are excellent maintenance, track stability and increasing of buckling resistance This developed turnout is same with the KHSR 1st phase's design and applications rules, components and signaling system since it observes KTX specification. Comparing it with the former turnout, High-elasticity pad, lubrication-free roller slide plate and Rheda2000 PC sleeper are only different. The purpose of this study is the development of high speed turnout on concrete slab track and its application on site. Now these studies are going to show the verification and confidence about the interface between ballast-track and concrete slab track by finding and solving the possible problems when it is installed on site and to make these turnouts applied perfectly and completely on concrete slab track. Its first trial construction in korea had been successfully completed at Sangju-station on July 20th ,2007 thanks to KORAIL and KR. Hereunder Sampyo E&C trys to introduce all of turnout technologies on concrete slab track system with Rheda 2000 sleeper

  • PDF

The Study on Centralization & Electronic for Maintenance Efficiency of Ground Signaling System (지상신호설비의 유지보수 효율화를 위한 집중화 및 전자화 연구)

  • Baek, Jong-Hyen;Kim, Yong-Kyu;Lee, Kang-Mi
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.8
    • /
    • pp.2983-2988
    • /
    • 2010
  • The train control system used in Gyeongbu-line is classified in ATC, IXL and CTC. Domestic railway signaling systems are being developed by electrification. In these systems the electrification of interlocking reaches 57% and the safety equipments of railway crossings in trackside devices have completed their development into an integrated system. Block systems of all the existing sections have not yet electrified and integrated so that they need a number of complement in terms of construction and maintenance. For ABS currently used in existing domestic lines, and LEU being installed in Gyeongbu and Honam lines, although a train is controlled by the signaling information of the same train in the same location, the system is separately installed so that the same information is separately divided and transmitted at the each distinct system. Therefore, in the conventional ABS and LEU, there are a lot of duplicate installed compartments such as lamp detection and a power supply unit. Hence, we have a lot of problems: for maintenance, a lot of manpower and costs need to be invested and the overall manufacturing costs get higher, as well as the construction costs by duplicate. Therefore, this paper suggest design to develop an integrated electronic Block Control Unit by the integration of the currently used ABS, and communication and electronic technology. We are to monitor and manage the block systems in the corresponding station by integrating. And we are to transmit information together with LEU, which is an ATS wayside transmitter.

The Traceabailty Method of Standard for Urban Transit Facilities (도시철도시설 표준화기준 추적성 관리방안 연구)

  • Lee, Woo-Dong
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1549-1552
    • /
    • 2008
  • Urban transit consists of signaling system, railway systems, power facilities systems and the other complicated facilities and the standards notify the standardizations, safety standards, performance standards and quality certification standards according to the Urban Transit Act. The government notifies and recommends these standards to improve the performance, safety and maintenance efficiency of urban transit. Now, we need to manage the records and traceability of the standards because they have reciprocal relations with the others so that, if some standards have been changed it could make some problems to the others. As a result, in this research, we suggest the way to manage the traceability of the standards by using the computation support tools.

  • PDF

The Management Schema for Urban Transit Standardization Project (도시철도 표준화사업의 효율적인 스키마 구축방안 연구)

  • Lee, Woo-Dong
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.2065-2069
    • /
    • 2008
  • Urban transit consists of signaling system, railway systems, power facilities systems and the other complicated facilities and the standards notify the standardizations, safety standards, performance standards and quality certification standards according to the Urban Transit Act. The government notifies and recommends these standards to improve the performance, safety and maintenance efficiency of urban transit. Now, we need to manage the records and traceability of the standards because they have reciprocal relations with the others so that, if some standards have been changed it could make some problems to the others. As a result, in this research, we suggest the way to manage the traceability of the standards by using the computation support tools.

  • PDF

A Study on hazard analysis of railway signaling system applied for a tool (Tool을 적용한 철도신호시스템 위험원 분석에 대한 연구)

  • Park, Sung-Gue;Han, Chan-Hee;Cho, Woo-Sik;An, Jin
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1195-1203
    • /
    • 2008
  • In this study it is researched to the hazard analysis phase which is the core phase of the safety life cycle carried out by various systems in Korea. At present diverse methods are utilized when the hazard analysis is performed. With the basis of these V&V activities are carried out. In this study using FMEA which is one of the representative methods of the hazard analysis, the effective and viable result is derived. Also, it establishes the systematic base of the further phases of the safety life cycle such as the Hazard log, V&V, and the safety case.

  • PDF

The Influence of Coupling Coefficient between Wayside Transmitter and On-board Receiver upon Operation Characteristics of the ATS System

  • Kim, Min-Seok;Kim, Min-Kyu;Lee, Sang-Hyeok;Lee, Jong-Woo
    • International Journal of Railway
    • /
    • v.4 no.1
    • /
    • pp.12-18
    • /
    • 2011
  • The ATS system is used to provide wayside signaling. Currently, the oscillation frequency is set at 78[kHz] in the normal state. As the on-board receiver crosses over the wayside transmitter, the oscillation frequency is changed by capacitors of the wayside transmitter in a manner dependent on the train speed. As the oscillation frequency is changed, the waveform is modified in the wayside transmitter as well as in the on-board receiver. When there are other signal systems such as a ATO system present near the wayside transmitter, frequency interference occurs. This phenomenon arises since other signals or communication frequencies present will be included in the waveform. Trains often stop due to these other frequencies included in the waveform. In this paper, a model of the interaction between the wayside transmitter and on-board receiver is suggested and frequency response in the wayside transmitter and on-board receiver in the presence of the other signals are estimated by the coupling coefficient. Also, the coupling coefficients are estimated, and the optimal value is proposed.

Diagnosis of Induction Motor Faults Using Inverter Input Current Analysis (인버터 입력전류 분석을 이용한 유도전동기 고장진단)

  • Han, Jungho;Song, Joong-Ho;Choi, Kyu-Hyoung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.7
    • /
    • pp.492-498
    • /
    • 2016
  • It is well known that since abrupt faults in induction motors tend to lead to subsequent faults and deterioration of the drive apparatus, motor faults may lead to several operating restrictions, such as security problems and economic loss. A lot of research has been done in the area of diagnosis to detect machine faults and to prevent catastrophic hazards in the motor drive system. This paper presents a new method of motor current signature analysis in which the DC-link current of the inverter-driven induction motor system, where a single current sensor is employed instead of three AC current sensors, is measured, and fast Fourier transform analysis is performed. This proposed method makes it possible to easily discern and clearly separate the motor fault current signature from the normal operation current flowing through the stator and rotor windings.

A Phase-shifter for Regulating Circulating Power Flow in a Parallel-feeding AC Traction Power System

  • Choi, Kyu-Hyoung
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.4
    • /
    • pp.1137-1144
    • /
    • 2014
  • A parallel-feeding AC traction power system increases the power supply capacity and decreases voltage fluctuations, but the circulating power flow caused by the phase difference between the traction substations prevents the system from being widely used. A circuit analysis shows that the circulating power flow increases almost linearly as the phase difference increases, which adds extra load to the system and results in increased power dissipation and load unbalance. In this paper, we suggest a phase shifter for the parallel-feeding AC traction power system. The phase shifter regulates the phase difference and the circulating power flow by injecting quadrature voltage which can be obtained directly from the Scott-connection transformer in the traction substation. A case study involving the phase shifter applied to the traction power system of a Korean high-speed rail system shows that a three-level phase shifter can prevent circulating power flow while the phase difference between substations increases up to 12 degrees, mitigate the load unbalance, and reduce power dissipation.