• 제목/요약/키워드: Railway signaling system

검색결과 224건 처리시간 0.042초

전기철도 강체전차선로의 정적 상태 검출 기술 연구 (A Study on Technologies for Measuring Static Condition of Rigid Conductor System in Railway Electrification)

  • 나경민;이기원;박영
    • 한국전기전자재료학회논문지
    • /
    • 제32권6호
    • /
    • pp.507-511
    • /
    • 2019
  • The purpose of an electric railway system contact wire is to supply electric energy to trains through a contacted pantograph. This energy is then converted into mechanical energy. Recent developments in overhead contact lines include the increase in the tension force up to 34 kN according to train speeds that reach up to 400 km/h with a verified safety. Rigid conductor catenary (R-Bar) for high speeds of up to 250 km/h have been developed in tunnels to save on construction costs. This is significant because minor defects in R-bars in aspects, such as height and stagger affect installation conditions. In this study, we propose the use of a detector that measures the static characteristics to reduce the R-bar installation errors. This detector has been developed to measure the height and stagger of the contact wire using video images.

철도 분기기 밀착검지기 Life expectancy의 유지보수 주기 결정에 관한 연구 (Study on the Maintenance Interval Decisions for Life expectancy in Railway Turnout clearance Detector)

  • 장병목;이종우
    • 한국철도학회논문집
    • /
    • 제20권4호
    • /
    • pp.491-499
    • /
    • 2017
  • 철도 분기기는 철도에 가장 중요한 시스템 중 하나이며, 분기기가 이상이 발생하였을 경우에는 사고가 발생할 수 있다. 분기기의 상태를 검지하기 위해서 밀착검지기를 사용한다. 밀착검지기의 고장은 분기기의 고장으로 간주되어 열차운행에 커다란 장애가 될 수 있다. 분기기 밀착검지기의 고장 특성분석은 분기기의 운용에서 매우 중요하다. 밀착검지기의 운용특성 및 고장특성을 분석하기 위해서, 밀착검지기를 본선(A) 및 측선(B), 분기기 동작 횟수가 10회 미만(C) 및 80회 이상(D)로 분류하였다. 선정된 밀착검지기 140대를 기준으로 밀착검지기 고장특성을 분석하였다. 분기기의 고장은 제어부, 케이블 및 검지센서에 발생하였으며, 이 데이터를 운용 환경(A, B, C, D)에 따라 분류하였으며 각각의 고장밀도함수를 선정하고 모수를 추론하여 사전분포 값을 선정하였다. Bayesian추론을 이용하여 기기의 평균수명과 한계수명(Life expectancy)을 예측하여 밀착검지기 제어부에 대한 교체시점을 제시하였다.

철도차량시스템과 PSD간 인터페이스 방안 및 적용 현황 (The Interface Scheme and Application Between Rolling Stock System and PSD)

  • 이종성;민영기;김경식;최종묵
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 춘계학술대회 논문집
    • /
    • pp.1510-1512
    • /
    • 2004
  • Platform Screen Door System is a facility on platform to separate platform from track, having automatic sliding door structures interlocked to opening and closing of train door with integrated control unit. When a train comes to a stop at a designed position at a station, onboard ATC/ATO system transmits train berth signal to wayside signaling system. In case of automatic/driverless operation, opening and closing of the Platform Screen Door will be controlled by wayside signaling system. Unfortunately, we often see the case in news that passengers fall into track and their contact with train lead to critical accidents. However, passengers will be free from such accidents on the platform with the Platform Screen Door System. Especially during the rush hours, to ensure passenger's safety and smooth getting on & off, it is necessary to arrange. some station staffs on the platform without the Platform Screen Door System. On the other hand, the Platform Screen Door System will realize such operation by fewer staffs. Due to the above reasons, the Platform Screen Door System is becoming more popular in subway system recently.

  • PDF

전기철도 급전시스템의 매설접지 방식 유용성 평가 (Evaluation of Efficiency for Grounding System on the Electrified Railways)

  • 창상훈;한문섭;이장무;이형수;김정훈
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2000년도 춘계학술대회 논문집
    • /
    • pp.86-92
    • /
    • 2000
  • Recently, the Korea National Railways (KNR) is undertaking a program of electrification of the existing railway routes. In order to implement the ongoing plan, KNR authorized a preliminary engineering study of its electrical systems. This effort included a comprehensive analysis of new grounding networks. The new grounding system runs in parallel with the rails and is connected to all metal structures such as rails, overhead protection wires and substation grounding grids etc., creating an equipotential ground network. This paper presents a study on coupling levels that can disturb signaling and telecommunications in adoption of the new grounding network The simulation for the study is carried out using Matlab software, Several different scenarios are analyzed, including the load condition and a few fault conditions with different fault locations. The induced potentials on the communication cables are computed. The effect of the buried ground wires is also analyzed by comparing the results with and without the presence of the ground wires, The results presented in the paper can be used as a reference for estimating coupling levels in similar rail systems.

  • PDF

2.4GHz 무선 통신을 이용한 PSD 인터페이스 개선에 관한 연구 (A Study on Improvement of PSD Interface Using 2.4GHz Wireless Communication,)

  • 김재필;현용섭;장경송
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.1408-1415
    • /
    • 2007
  • To operate Platform Screen Door (PSD) automatically, the operational data of PSD and the train must be interfaced properly. PSD and train are operated together by the signaling system in Automatic Train Operation (ATO) signaling system zone where interfaces are provided between PSD and train. However, the additional PSD interface system with train is required in train operating zone without the interface between PSD and train. For the PSD interface, the wireless communication system or the train status (train correct stop status / train door status) detection system has been used. Seoul Metro line No.2. has the PSD wireless communication system using 447MHz band RF. For the safety of PSD operation, it is required to prevent RF interference in the subway environment where many frequencies exist. In this paper, the PSD wireless communication system is developed using 2.4GHz band RF to prevent the interference of the wireless communication and increase the traffic of the PSD interface. Furthermore, the improved system can store, manage and display the PSD and train operational data using Human Machine Interface (HMI) in the train's driver cab.

  • PDF

콘크리트 슬래브궤도에서 ATP시스템 지상자의 주파수가 철근에 미치는 영향 (The Influence of Frequency on Wayside Transmitter of ATP System upon Reinforcing Bars in Concrete Slab Track)

  • 김민석;이종우;고준석
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.691-706
    • /
    • 2008
  • ATP(Automatic Train Protection) system in railway signaling system is the important one grasping the position and velocity of a train. The wayside transmitter of ATP system is installed between rails. In concrete slab track, the signal current using wayside transmitter of ATP system is influenced by reinforcing bars. The magnetic coupling between reinforcing bars and wayside transmitter of ATP system as a filter makes an input current distorted. So, it makes an alternating current signal with a desirable size not transmit to on-board system of a train. Way to decrease the distortion of an input current signal frequency is to avoid maximum induction current frequency. And the induction phenomenon between reinforcing bars insulated and wayside transmitter of ATP system does not occur. In this paper, we represent the model about wayside transmitter of ATP system and reinforcing bars on the concrete slab tracks, and calculated the parameters demanded for the model. Also, we demonstrated it through the Maxwell program. Furthermore, we calculated impedance on wayside transmitter used in KVB system and ERTMS/ETCS system which are a kind of ATP system, frequency response of induction current, using the Matlab, and demonstrated the validity of it, using the PSpice program.

  • PDF

열차제어컴퓨터 시리얼통신변환장치(HADAX)의 성능개선에 관한 연구 (Performance improvement of serial communication converter of train control computer)

  • 조봉관
    • 한국도시철도학회논문집
    • /
    • 제6권4호
    • /
    • pp.427-436
    • /
    • 2018
  • HADAX는 열차제어컴퓨터의 시리얼 통신변환장치로서 선로변 신호설비와 역의 신호설비 및 열차제어컴퓨터 등 여러 신호설비와 연결되어 있으며 열차제어를 위한 제어정보 및 신호설비의 상태정보를 전송한다. 그리고 스플리터 인터페이스를 통해 여러 대의 전자연동장치와 정보를 전송하고 있다. HADAX는 여러 신호 장치들과 시리얼 통신으로 인터페이스하고 있어 통신 접속 장애가 빈번히 발생하여 이중계 구성, 외부 스플리터 통합, 통신카드의 다채널화 등 성능개선이 필요하다. 성능이 개선된 HADAX 장치는 기존 장치와 외함의 치수와 커넥터의 호환성을 가져야 하며 이중계 절체, 스플리터 통합에 대한 성능을 검증하여야 한다. 따라서 기존에 구축된 신호설비와 연결하여 스플리터 통합 구성으로 진로제어시험, 이중계 절체시험, 다채널 통신시험을 통해 HADAX의 성능을 검증하였다.

ATP 시스템에서 열차속도에 따른 지상자에서 차상자까지의 자계의 세기 및 비트오류율에 관한 연구 (A Study on the Magnetic Field Intensity and BER from Wayside Device to On-board Device about the Train Speed in ATP System)

  • 김민석;이상혁;이종우
    • 전기학회논문지
    • /
    • 제59권10호
    • /
    • pp.1803-1808
    • /
    • 2010
  • Electric railway system consists of rolling stock, track, signal and catenary system. ATP system in railway signaling system is the important one grasping the position and velocity of a train. The wayside device of ATP system is installed between rails. Recently, the research about increasing train speed has been developed in total departments of the railroad systems. The study on the information transmission between on-board device and wayside device is required for increasing the train speed in the ATP system. When the train speed is increased as to same transmission distance, the problem on information transmission occurs because the transmission time is decreased. In case that the transmission distance is extended, the transmission time is decreased with respect to the train speed. Therefore, we have to define the standard magnetic field intensity as to the train speed in order to transmit correctly telegram. In this paper, the transmission distance for the telegram is suggested on the basis of the train speed. Also, the standard magnetic field intensity from the wayside device to on-board device is proposed by using transmission distance regarding the train speed in the ERTMS/ETCS system by using Matlab program. Also, BER according to the train speed is presented by calculating electric field intensity from the magnetic field intensity.

고전압임펄스궤도회로(HVITC)와 AF 궤도회로간의 간섭에 대한 연구 (A Study on Interference between High Voltage Impulse Track Circuit(HVITC) and AF Track Circuit)

  • 이희진;이종우
    • 한국철도학회논문집
    • /
    • 제18권3호
    • /
    • pp.232-240
    • /
    • 2015
  • 고속철도 차량기지에는 고전압임펄스(HVITC)와 AF 궤도회로를 사용하고 있다. HVITC는 열차의 위치검지 및 궤도 절손검지 기능을 하고, AF궤도회로는 열차제어 정보를 전송하여 고속열차의 이상 유무를 검지하는 출발 전 시험에 사용한다. 두 궤도회로는 별도로 구성되어 있고, 같은 레일을 사용하여 제어신호를 스위칭에 의해서 전송하고 있다. AF 궤도회로는 루프케이블을 궤도 안쪽에 설치하는 방법으로 구성할 수 있다. 그러면 스위치를 제거할 수 있고, 상시 시험용 제어신호를 전송할 수 있다. 이 경우에 두 궤도회로는 상호간섭이 발생할 수 있다. 본 논문에서는 두 궤도회로를 동시에 동작하는 경우에 발생되는 간섭을 두 회로의 모델링을 통하여 규명하였다.

콘크리트 슬래브궤도에서 레일과 철근 사이의 결합계수에 대한 연구 (A Study on Coupling Coefficient Between Rail and Reinforcing Bars in Concrete Slab Track)

  • 김민석;이상혁;권재욱;이종우
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.1169-1177
    • /
    • 2008
  • The system of the railway signaling using the track transmits the approved speed to the location of a train and it. Referring to the way of transmitting train control information, there are the one transmitting it to the on-board system of a train using the direct track, the another transmitting it establishing an instrument, and the other transmitting an instrument by a railway track. The one is the method using the direct track as a conductor for composing the part of the track and attaining the information controlling a train by transmitting a signal to the track. It is used for the high-speed railway and the subway. The method using the track attains information by transmitting it to returned information, and the on-board system of a train attains it by magnetic coupling. Because many reinforcing bars on the concrete slab track are used, interaction between a rail and a reinforcing bar that is not produced on ballast track is made. Due to the interaction, the electric characteristic of rail is changed. In the current paper, we numerically computed the coupling coefficient between the rail and the reinforcing bar based on the concrete slab track throughout the model related to the rail and the reinforcing bar using the concrete slab track that is used in the second interval of the Gyeongbu high-speed railway, and we defined the coupling coefficient not changed in the electric characteristic of rail in the condition that there is no interaction between the rail and the reinforcing bar.

  • PDF