• 제목/요약/키워드: Railway service

검색결과 823건 처리시간 0.026초

일본의 철도기술개발 동향과 시사점 (Tend and implications of the railway technology R & D in Japan)

  • 한석윤;안태기;신정렬;정종덕
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.2332-2342
    • /
    • 2008
  • Railway in Japan has been changed every apr. 20 years as follows, since the war ended in 1945. Shinkansen which was the first high speed train in the world began to revenue service in 1964, and a national railway authority was privatized segmentally in 1987, and after 20 years later from then, the ticketing service using IC card was accomplished. In this research, we review these changes in Japan in the administrative aspects on railway technology, and R & D aspects of the Railway Technical Research Institute, JR East and JR West which are railway corporations. Also we introduce the present status and future of railway technologies in Japan which railway experts diagnosed. In the twenty-first century, the needs of the times for railway have been enormously changed due to a low birth-rate, an aging society, environmental pollution and energy problems and etc. Because we have very similar problems to them like Japan, we could get lessons from Japanese cases in setting the direction for the development of railway technologies.

  • PDF

실동하중에 의한 강판형철도교의 응력빈도해석 (Stress Histogram Analysis of Steel Plate Girder Railway Bridge due to Service Load Histories)

  • 황인구;김연태
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.928-933
    • /
    • 2004
  • Despite the number of steel bridges being under in service more than 50 years reaches about 50$\%$ in present, the quantitative estimation in maintenance on steel railway bridges is not possible because a ton of the field data in the bridges have not been plentifully accumulated. Therefore, a series of field tests on the steel plate girder bridge, the typical types of steel railway bridges, are executed, and the stress characteristics of main members in steel plate girder railway bridges are quantitatively estimated in this study.

  • PDF

도시철도의 연결방안에 관한 고찰 -해외사례를 중심으로- (A study on the connected service of urban railway)

  • 후지타다카요씨
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2002년도 춘계학술대회 논문집
    • /
    • pp.100-105
    • /
    • 2002
  • Now operating of many urban railway lines are currently in progress in tile Seoul, but the inadequate consideration of links between different lines could create inconvenience as the public transport. This paper is studied about the connection design of urban-railway service convinced for other metropolis railways forms and propose the base pilot plan of the railway network linking system in Seoul Metropolis.

  • PDF

고속철도 역사시설 및 열차서비스 경험이 고객만족에 미치는 영향 (The Effect of High-speed Railway Station Facilities and Train Related Services on Customer Satisfaction: Based on KTX User Experience)

  • 이강덕;황은주;염선호;김민호;조혜정
    • 한국철도학회논문집
    • /
    • 제19권3호
    • /
    • pp.351-362
    • /
    • 2016
  • 본 연구의 목적은 고속철도 역사시설 및 열차서비스 전반에 관한 서비스 만족도를 측정하여 고객만족에 영향을 미치는 주요 서비스요인을 도출하고 그 관계를 밝히는 데 있다. 이를 위해 고속철도 이용객 202명을 대상으로 설문을 수행하여 분석한 결과, 역사 및 열차 관련 서비스에 관한 설문문항 63개 중, 주차관련서비스, 역사편의시설관련서비스, 발권서비스, 열차 내 서비스, 열차 내 환경 등의 다섯 가지 주요 서비스요인이 도출되었다. 구조방정식모형을 통한 가설검증 결과, 주차관련서비스는 열차 내 서비스에 직접적인 영향을 미치지 않으며, 그 외 역사편의시설 및 발권서비스는 열차 내 서비스 및 환경에 각각 긍정적인 영향을 미치는 선행요소로 나타났다. 또한 열차 내 서비스와 환경요인은 고객의 만족을 강화시키는 주요한 변수로 검증되었다. 따라서 역사시설 및 열차서비스의 경험은 철도서비스만족에 긍정적인 영향을 미치는 것을 알 수 있었다.

고속철도역의 연계환승시설 서비스 수준 평가 (The Service Evaluation of Connection and Transfer Facilities in the High-speed Railway Stations)

  • 한성엽;김강섭;박민규;김시곤
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.761-772
    • /
    • 2009
  • The introduction of KTX (Korea Train eXpress) provided passengers with a much faster mode of transport, and KTX has become a model railway system. Express railway stations are emphasized as public transit transfer centers, but their service evaluations were not performed appropriately so far. It is possible to know the level of service by developing valuation criteria for their evaluations. The evaluation of transfer centers mainly consists of two parts; connective service with other travel m odes, and transfer service inside transfer stations. Connection is defined as the inter-connection of multi-transportation vehicles, and transfer means that a passenger changes his travel mode to another. Such connective service and transfer service are evaluated by the level of service in terms of transfer facilities, the appropriateness of station layout and the quality of information throughout the facilities. We developed the service evaluation indicators of connective facilities and referred to the indicators of transfer facilities. We examined the 7 stations in Korea that are currently in operation and standardized the methodology of the evaluation process by applying the indicators suggested in this study.

  • PDF

Defect Monitoring In Railway Wheel and Axle

  • Kwon, Seok-Jin;Lee, Dong-Hyoung;You, Won-Hee
    • International Journal of Railway
    • /
    • 제1권1호
    • /
    • pp.1-5
    • /
    • 2008
  • The railway system requires safety and reliability of service of all railway vehicles. Suitable technical systems and working methods adapted to it, which meet the requirements on safety and good order of traffic, should be maintained. For detection of defects, non-destructive testing methods-which should be quick, reliable and cost-effective - are most often used. Since failure in railway wheelset can cause a disaster, regular inspection of defects in wheels and axles are mandatory. Ultrasonic testing, acoustic emission and eddy current testing method and so on regularly check railway wheelset in service. However, it is difficult to detect a crack initiation clearly with ultrasonic testing due to noise echoes. It is necessary to develop a non-destructive technique that is superior to conventional NDT techniques in order to ensure the safety of railway wheelset. In the present paper, the new NDT technique is applied to the detection of surface defects for railway wheelset. To detect the defects for railway wheelset, the sensor for defect detection is optimized and the tests are carried out with respect to surface and internal defects each other. The results show that the surface crack depth of 1.5 mm in press fitted axle and internal crack in wheel could be detected by using the new method. The ICFPD method is useful to detect the defect that initiated in railway wheelset.

  • PDF

Activation Plan for the Eurasia Railway Logistics

  • Chung, Sungbong;Namkung, Baekkyu;Kim, Moon-Joung
    • 유통과학연구
    • /
    • 제14권1호
    • /
    • pp.17-28
    • /
    • 2016
  • Purpose - Given the increasing interest in the Eurasian Initiative, government-wide studies for the construction of the Silk Road Express are currently being conducted. However, the Korean Government has no experience in operating international freight railroads and has not encountered problems in train service plans, international conventions, and customs clearance, which will arise when TKR is connected to TSR, TCR, and TMGR. Research design, data and methodology - Given these conditions, the cases of direct services in international freight railroads between China and Europe are investigated to identify the possible problems in the connection between TKR and continental railroads. This study also identifies the plans for activating Eurasian railroad logistics. Results - For the service of international freight trains, Korea needs to join international conventions, such as OJSD, as a regular member. Furthermore, any relevant international conference after the conclusion of such an agreement is needed for the agreement on train service schedules, fees, and procedures for passing border stations. Conclusions - Customs clearance and relevant documents must be standardized to address the differences in clearance systems between nations.

철도물류정보서비스 품질이 화주의 만족에 미치는 영향에 관한 연구 (A Study on the Effects of Railway Logistics Information System Quality on the shipper's Satisfaction)

  • 양재훈
    • 한국철도학회논문집
    • /
    • 제14권4호
    • /
    • pp.376-382
    • /
    • 2011
  • 오늘날 웹사이트의 서비스 품질은 기업의 효율적인 업무수행과 고객의 소비행동에 중요한 영향을 미치는 핵심요인으로 인식되고 있다. 본 연구는 현재 한국철도공사에 의해 제공되고 있는 철도물류정보서비스에 대한 서비스품질(신뢰성, 유용성, 외형성, 편리성)과 해당 정보서비스를 이용하는 화주의 만족도와의 관계를 검증하기 위한 연구이다. 회귀분석 결과, 신뢰성과 유용성은 화주의 만족도에는 유의한 정(+)의 효과를 미치는 것으로 검증되었으나, 편리성과 외형성은 영향을 미치지 않는 것으로 나타났다. 본 연구의 목적은 화주의 만족도를 향상시키기 위한 철도물류정보서비스의 제공 전략을 제시하는데 있다.

철도안전성능시험설비 구축 체계 개선에 관한 연구 (A Study on Improving the Constructing System of Railway Safety Test Facilities)

  • 김윤미;최경진;조연옥
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.2034-2039
    • /
    • 2010
  • As a mass transportation system, a railway contains potential risks that may result in a high death rate and property losses. Accordingly, Railroad Safety Technology R&D Corps. is adopting the plan of the construction of Railway Safety Test Facilities as a part of the Railway Total Safety Project to enhance the railway safety, and carrying out researches on effective project management methods with Systems Engineering techniques. When a system or a service is realized, such as the Railway Total Safety Project, it needs to be verified by requirements and the process of verification is to check whether customers/stakeholders requirements have been properly transformed into a system or a service. Recently, building the standardized verification system up could be the solution to reduce possible system-failed risks. To support that, we propose the more effectual verification method of constructing the Railway Safety Test Facilities applying the systems engineering tool to the research.

  • PDF

철도시스템의 종합시험운행을 통한 철도안전 확보방안 (A Railway Safety Proposal with Full System Commissioning)

  • 김영우;이희성
    • 한국철도학회논문집
    • /
    • 제10권1호
    • /
    • pp.34-38
    • /
    • 2007
  • Rail network authority have to do the safety ensuring activities including the maintenance of railway facilities, integrated performance verification between the facilities and related lolling stock and safety inspections, etc. When constructing the new lines or upgrading the conventional lines, full system commissioning should be done before the revenue service with railway operator. To develop the optimal full system commissioning model, the status of domestic and foreign railway facilities and railway accidents are analysed and the problems of the safety management are derived. As one of countermeasures for the problems, the procedures and criteria for the full system commissioning are developed.