Currently, it has been a fashion to include RAMS of rolling stock in the order for purchasing the rolling stock. However, it's only to suggest a qualitative value or an ideal target without giving or demonstrating actual RAMS target, with only demonstrating passive RAMS by the data provided by the manufacturer. In the case of KTX project of 100 cars of KTX-II contracted in June 2006, their target has been suggested from the previous RAMS application standard and it aimed to achieve the reliability level of equivalent high speed rolling stock. Afterward, as actual KTX-II RAMS Plan and RAMS Demonstration Plan has been prepared and approved, it has been the first problem to secure the reliability and safety in order to introduce the new high speed rolling stock(KTX-II) successfully and we actually tried to apply overseas RAMS standard, KTX samples, electric railcar MTRC and rolling stock samples. This Report was dealt world trends of Railway RAMS standard, KTX-II RAMS Specifications, the present condition of KTX-II RAMS performance and development a way of KTX-II RAMS, We hope the "KTX-II RAMS Application Standard for Safety of Passenger Transportation Service" is served as an opportunity for the basic research for establishing and demonstrating RAMS target of components or parts composing the rolling stock system.
Hur Hyun-Moo;Lee Chan-Woo;Kwon Sung-Tae;Yun Chun-Han
Proceedings of the KSR Conference
/
2003.05a
/
pp.651-655
/
2003
The rolling-stocks used in conventional line have suffered wheel problems due to lack of adaptability with track. These brought out severe wheel flange wear, these have caused unstable ride characteristics of rolling-stock. Especially, Wheel flange wear is severely influenced by wheel profile but lateral suspension characteristics. This study was started to induce wheel profile suitable for domestic railway environment. Thus, we analyzed the wear characteristics of wheel profiles that are being applied to railway rolling-stock in KNR. To analyze wheel wear characteristics, we have conducted experiment studies for passenger rolling-stock and obtained useful datum.
Technology on the rolling stock is very composition and system engineering. We have to consider to many parameters on the rolling stock design. High speed train is interface between rolling stock and infra system of rail, signal, communication etc. For many years testing operation has experienced substantial growth based on various advanced new technology. Recently some problems was clearly stated on effective management, practical use and testing operation of the the rolling stock on the technology change. This paper presents some results of the study on necessary requirements of the operation testing for rolling stock technology change. We propose a general plan to suggest the operation testing and the parameters of the rolling stock on the technology change in the text.
For ensuing rolling stock safety, it is necessary that safety management should be made systematically through its whole life cycle. That is to say, safety management activities for every steps of rolling stock life cycle should be defined, and the roles of managers such as executor, assessor, and certificator should be shared clearly. This paper defines the safety management activities based on IEC 62278, analyzing foreign and domestic safety regulation systems, and suggests the reformed safety management system for rolling stock in Korea
Compatibility concerns between train signalling systems and rolling stock are a significant problems to cross-acceptance of rolling stock in urban railway system. It is not possible to establish general rules for the maximum levels of interference allowed, valid for every country. So, in this paper, we measured conducted emission and inductive emission and analyzed results for DC rolling stock.
Compatibility concerns between train signalling systems and rolling stock are a significant problems to cross-acceptance of rolling stock in urban railway system. In this paper, we measured the conducted emission flowing current through rails and analyzed results for DC rolling Stock.
This study examines the relationship between the operational turnaround time and the rolling stock requirements. In this study, the operational turnaround time of rolling stock is divided into physical turnback time and waiting time. This paper presents a variety of models and estimation results of the existing studies on operational turnaround time. The proposed estimation model of the operational turnaround time in this study is designed to minimize the operational turnaround time in terminus stations, while the rolling stock requirement is reduced. The developed estimation model was applied in a real-world example, and it was found that the operational turnaround time and the required rolling stocks were lessened compared with the current condition. The method presented in this paper is expected to be utilized in train operational planning and rolling stock routing plans, thereby minimizing the rolling stock requirements of existing railway operating authorities.
Generally speaking, the uniqueness of Korea for the high-speed railway rolling-stock is mainly perceived through the travel over the high-speed electric railway by passengers, which consists of the organization of space in the coach and its interior design. For such purpose, it is necessary to build a series of independent cultures with high-speed railway i.e. to have the development of design technologies oriented to harmonizing human beings, their society and culture with the systematic integration of production technologies to support the culture and its substructure foundation which constitute the frame of superstructure in the society, by defining the relationships with travelers on the high-speed railway as well as enhancing the comfort and convenience of high-speed railway through drawing up the development of links with the systematic integration among lines of technologies on the basis of 'User Train Interface. This thesis aims at introducing the study carried out to build the evaluation standards of performance outputs for 'HEMU-400X rolling-stock Design' derived from the performance for the first year in the research 'Development of Technologies for the Next-Generation High-Speed Railway' as part of "Development Project for the Future Railway Technologies" from 2007.
Environmental conservation is becoming the major conversation topic in the 21st century, the era of environment. In the Law for the Preservation of Water Quality, article 53 states "A business unit which is doing business causing pollution caused by non-point pollutant or builds waste water discharge facilities, should report the installation of the non-point pollutant and install the required pollution control facilities". Environmental pollution caused by oil leaks during operation or maintenance has been found in the railway sector. Especially, rolling stock depot is most likely to be affected by environmental pollution. Therefore, in this paper We have investigated non-point pollutant in the rolling stock depot area and have studied adequate disposal method to minimize the effect of the non-point pollutant, hoping to supply the preliminary data for building an environment-friendly rolling stock depot.
A routing is the path that an actual trainset follows as it moves from one train to another train in a timetable. The number of routings is equivalent to the number of trainsets required to cover the timetable. The primary factors of rolling stock requirement plan include evaluating the minimum number of routings. This can be formulated as a set partitioning problem and solved using enumeration method or column generation method. In this paper we presents an enumeration algorithm which is useful to implement the enumeration method for the rolling stock requirement plan.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.