• Title/Summary/Keyword: Railway roadbed

Search Result 170, Processing Time 0.022 seconds

Evaluation of Deformation Characteristics for Bridge/Earthwork Transition Reinforcement Methods Considering Moving Load (이동하중을 고려한 교량/토공 접속부 보강방안별 변형특성 평가)

  • Lee, Il-Wha;Lee, Sung-Jin;Lee, Su-Hyung;Kang, Tae-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.3
    • /
    • pp.298-303
    • /
    • 2010
  • The transition zone of the railway is the section which roadbed stiffness is suddenly varied like as tunnel-earthwork, bridge-earthwork and concrete track-ballasted track. There are about 450 tunnel-bridge transition sections on Kyungbu high-speed railway line. It is very important to pay careful attention to construction of these transition zones, in order to secure the train running safety. So, we developed a finite element model of the moving wheel loading to simulate the behavior of bridge-earthwork transitions in this paper. The most distinctive characteristics of the model proposed is to simulate the real wheel behavior on rail. And the main analysis object is to evaluate and compare the deformation characteristics of the transition zone according to the reinforcement methods and length of transition zone which is adopted to high-speed railway. Based on the analysis results, we assessed the effect of the reinforcements on the transition zone of high-speed railway.

Rail Corrugation Effects on the Dynamic Behavior of Clips of Rail Fastening System in Operation Environment of Urban Railway (도시철도 운영환경에서 파상마모에 의한 레일체결장치 클립의 진동 특성)

  • Kim, Man-Cheol;You, Won-Hee;Sim, Hyoung-Bo
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.4
    • /
    • pp.489-497
    • /
    • 2016
  • The rail fastening system, which provides a structural connection between the rail and the sleepers, is a main track component that plays an important role in retaining the rail gauge within acceptable tolerances, as well as in passing the train load to the roadbed through the sleepers. In this paper, a modal test was first performed to evaluate the dynamic characteristics (e.g., natural frequency) of the clips of the railway fastening system under the condition of rail corrugation in urban railway operation. The corrugation-induced passing frequency was then compared with the natural frequency of the clips to investigate any resonance effect during train passage. Furthermore, a field test under train passage was conducted to measure the accelerations on the rail and the rail fastening clips as well as the strains on the rail fastening clips in the rail corrugation condition. The field measurements indicated that the accelerations on the rail and the rail fastening clips have a close relationship with the rail corrugation, but they had a minimal effect on the strains of the rail fastening clips.

A Study on the Building Information Modeling Collaboration Strategy for Railway Infrastructure - Case Study and Survey - (철도 인프라 BIM 협업 전략에 관한 연구 - 싱가포르 사례 및 국내 전문가 설문조사를 기반으로 -)

  • Kim, Seong-Ah;Kim, Jin-Man;Shin, Min-Ho
    • Journal of KIBIM
    • /
    • v.12 no.4
    • /
    • pp.116-127
    • /
    • 2022
  • Building Information Modeling, which was applied mainly in the construction sector, is expanding to the road sector, and the government recently recommends preparing individual application guidelines considering the characteristics of detailed fields such as railways, ports, and complexes through BIM implementation guidelines. Compared to general construction projects, a lot of the works such as signals, electricity, and power, and the railway BIM 2030 roadmap has been presented to apply BIM to railway construction projects that require business consultation and work environment review with various local governments, and pilot projects are in operation. Unlike a general building, in which the construction begins after the detailed design is completed, in the railway project, the detailed design of other works proceeds along with the roadbed construction. Because construction and design work together, railways need to coordinate detailed engineering interfaces such as trajectories, signals, and power, and the application of BIM in design interface coordination has the advantage of maximizing the effectiveness of pre-review. Overseas railway construction projects actively used BIM to adjust design interfaces and had a collaboration process to modify BIM models and create construction details from the revised models through regular meetings with suppliers. Therefore, this study aims to derive the factors necessary for establishing a BIM collaboration environment based on a survey of practitioners as a preliminary step for establishing the BIM collaboration process of the railway construction project.

Evaluation of the Railroad Track Life Cycle Based on the Metro Rail Wear Data Regression Analysis (지하철 마모 데이터 회귀분석을 통한 궤도 수명 평가)

  • Jeong, Min-Chul;Kim, Jung-Hoon;Lee, Jee-Ha;Kang, Yun-Suk;Kong, Jung-Sik
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.4
    • /
    • pp.86-93
    • /
    • 2010
  • The wear of railway track affects loss of rough ride, noise or vibration of train and traveling safety. Moreover as the track is worn away, this promotes destruction of structural mechanism of rail track which can bring about increasing of rail track maintenance cost drastically. For this reason, it is very important and interested research subject to design railway track structure and to analyse train movement mechanism based on systematic analysis of the reasons causing rail wear possible in real field. In this research, for the efficient maintenance, Life Cycle Performance of rail track and maintenance characteristics are computed considering some track components such as track type, contracting type, sleeper type and roadbed type. Time - Wear probabilistic distribution relationship as well as multiple regression analysis based on time, curvature and wear data are computed to predict the service life remainder of railway track and to be adapted to safety assessment.

Case Analysis and Statistical Characteristics of a Railroad Weather-Related Accidents and Incidents each Railroad Line in the Korean Peninsula (노선별 철도기상사고의 통계적 특성 및 사례분석)

  • Park, Jong-Kil;Jung, Woo-Sik;Lee, Jae-Su;Kim, Eun-Byul
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.1
    • /
    • pp.73-79
    • /
    • 2011
  • This paper aims to find out the statistical characteristics of railroad weather-related accidents and incidents of each railroad line and then reduce the railroad accidents and prepare for the climate change. For this, we used data of KROIS and Korea railroad accidents report during 1996-2008. The results are as follows; Gyeongbu line is the most vulnerable line to railroad weather-related accidents, Yeongdong and Taebaek line are also the vulnerable line. The main railroad weather-related accidents and incidents is a railway obstruction and the next is a signal failure, a power supply failure. The second cause of a railway obstruction was some different for each line, but the main cause was a collapsed roadbed. We knew that the cold front accompanied with a heavy rainfall for a short time is the main weather pattern which cause the railroad accidents.

Analysis of Design Parameters for Earthwork/Bridge Transition Structure for Ultra-High Speed Running (초고속 주행시 교량/토공 접속부 보강방안의 설계변수 분석)

  • Lee, Il-Wha;Lee, Sung-Jin;Lee, Su-Hyung;Lee, Kang-Myung
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.2
    • /
    • pp.117-126
    • /
    • 2015
  • The development of railway roadbed for 600km/h train speed level is very difficult because unpredictable static and dynamic interaction occurs between the ultra-high speed train and the infrastructure. Especially, an earthwork-bridge transition zone is a section in which influential factors react, such as bearing capacity, compression, settlement, drainage, and track irregularity; these interactions can include complicated dynamic interaction. Therefore, if static and dynamic stability are secured in transition zones, it is possible to develop roadbeds for ultra-high speed railways. In the present paper, design parameters for transition reinforcement applied to present railway design criteria are analytically examined for ultra-high speed usage on a preferential basis. Design parameters are the presence of reinforcing materials, geometric shape, stiffness of materials, and so on. Analysis is focused on the deformation response of the track and running stability at ultra-high speed.

A study on the adsorption characteristic and safety assessment of railway subsoil material (철도 노반 재료의 중금속 흡착특성과 안전성에 관한 연구)

  • Paek, Seoungbong;Gil, Kyungik
    • Journal of Wetlands Research
    • /
    • v.17 no.2
    • /
    • pp.146-154
    • /
    • 2015
  • Domestic railway industry has grown in numbers, scale of railway ndustrial and operation because was focused on an environmentally sustainable transportation. However, it is not enough to treat and prevent heavy metals which occur as the railway operation increases. The heavy metals occurred when the operating railway and it will be flow into water system with rainfall effluent during rainfall. will flow out along with the rainfall effluent when rainfall comes. In case of a railway bridge, In particular, heavy metals were flow into the water system without any treatment from railway bridges where located nearby rivers and lakes. So, rainfall effluent from railway facilities was occurred pollution of water system. For the prevent of heavy metal runoff during rainfall, the adsorptivity of material in railway roadbed is important.In this study, adsorptivity of gravel which is main gravel and blast-furnace slag were conducted adsorption test and deducted Freundlich's and Langmuir's isothermal adsorption equations. Safety as railway subbase course material was evaluated using modeling. As a result, absorption amount of slag, Cd and Cu, was shown higher than gravel and Pb along with Zn showed higher absorption amount of gravel. However, absorption amount of slag was shown higher than gravel used as railway subbase course material as time passes by. Absorption features had more suitable determination coefficient of heavy metals in warm absorption type such as Langnmuir compared to warm absorption type like Freundlich. To add, they showed less transformation by about 10% compared to gravel in safety evaluation through modeling. This is a railway subbase course material that prevents water outflow of heavy metal thus we can know slag is needed to be used.

Considering combined operation method with the wide area rapid-transit and high speed-transit for wide area traffic service offer at high speed track section (고속선구에 광역교통서비스 제공을 위한 고속철도와 급행전철 혼용운용 고찰)

  • Roh, Byoung-Kuk;Kim, Young-Bea;Cha, Ki-Sik
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1900-1906
    • /
    • 2008
  • According as zone of life of big city is expanded by new city development etc.., need special skill master plan compensation which can be systematic for wide area traffic problem solution and confusion expense minimization in the metropolitan area because wide area of capital region traffic is gone continuously and continues. Accordingly, Kyonggi Province suggested rapid-transit railway achievement that can connect Seoul Gangnam in 20 minutes with Dongtan new city recently. MLTM(Ministry of Land Transport and Maritime Affaris) announced "Capital region railway network improvement plan research services (2007.12)" result that Gangnam High-speed railway route (Suse $\sim$ Dongtan $\sim$ Pyeongtaek) construction for offer High-speed railway service to capital region and Kyonggi southern part area inhabitantses and need to line capacity tribe solution by Seoul-Busan high-speed railway second-stage and Honam high speed railroad completion. Is judged that need examination about wide area rapid-transit railway combined application operation that take advantage of rail track reserve capacity of High-speed railway for utilization efficiency elevation of country and efficient investment of national finance according as High-speed railway and Gangnam rapid-transit railway route that is suggested in Kyonggi Province are overlaped. Therefore, in this research, I wish to quote investment efficiency plan of railroad business by that different kind's train is run in uniformity track by presenting combined application operation plan and working expenses curtailment effect etc. that is optimized through analysis of roadbed and E & M technology condition, intermediate station plan, train operation planning etc. in case of wide area rapid-transit railway and high-speed railway run combined application.

  • PDF

An Experimental Study of Diminution of Ballast Track Bridges Vibration due to the Variation of Ballast Depth (도상두께 변화에 따른 유도상교량 궤도 진동저감의 실험적 연구)

  • Kwon, Soon-Jung;Lee, Sang-Bae;Hong, Cheng-Hi
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1222-1229
    • /
    • 2011
  • Railway bridges are divided into ballastless and ballast track bridges. The ballast abrasion occurs on the ballast track upon bridges more than soil roadbed because the track vibration occurs a lot in the ballast track upon bridges due to girder vibration when a train's weight is loaded onto track even though the identical ballast is used. The phenomena of mud pumping especially, which occurs when drainage is not properly secured for heavy rain, leads to the increase of maintenance work load and the decline of ride comfort. There are countermeasures such as ballast change, installation of cross-drainage for poor drainage, gutter establishment, ballast lifting methods, ballast mats and resilient sleepers laying for the mud pumping. The ballast thickness range in domestic railroad construction rule is uniformly set up according to the design speed of railroad and passing tonnage of train without considering field conditions which is considered in foreign railroad companies. The purpose of this study is to verify the effect of vibration decrease by measuring the acceleration, displacement and ride comfort of ballast track with the change of ballast thickness on the ballast track bridges and to suggest the optimal height of ballast on the Yocheon Bridge built for the test in Honam Line.

  • PDF

Evaluating New Track Construction Costs of Two Different Options: Conventional Trains vs. Tilting Trains

  • Rho, Hag Lae;Han, Seong Ho;Kim, Gang Seog
    • International Journal of Railway
    • /
    • v.5 no.3
    • /
    • pp.103-113
    • /
    • 2012
  • Infrastructure costs could be greatly reduced if the need for bridges and tunnels was reduced, or if the line could be shortened. Tilting trains might be a less costly alternative to building new tracks with large curve radii, because tilting trains can negotiate tighter curves without having to decrease their speeds. Tracks built for tilting trains would be cheaper, as they require fewer bridges and tunnels. This paper compares the construction costs of two different options for the new Dodam-Yeoncheong section on the Central line, which includes 148.65 km of new electrified double-track with a design speed of 250 km/h. The first option is to straighten the high-speed line. The second option is to build a line with small radii curves and run tilting trains on the line. In the first option, tunnels would account for about 51% of the new section. In comparison, the second option would have shorter curves and fewer tunnels and bridges which would reduce construction costs. Furthermore, alignment modifications could be made to several segments on the straight line, making the most of the existing roadbed. The analysis concluded that the line suited to tilting trains would be 95.7 million USD cheaper to build the straight route. That is a savings of 2.8% of the total project cost. However, this option would increase the total travel time of the route by 1.2 minutes, which means it is not necessarily the best choice.