전산지원도구를 이용한 철도안전 성능평가 시험설비 구축 사업 관리방안 연구 (A Study on Managing the Construction Process of Railway Safety Test Facilities Using the Systems Engineering Tool)

  • 김윤미;최경진;조연옥
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.1505-1510
    • /
    • 2008
  • A railway is a complex system integrated with a lot of technical elements such as trains, track facilities, human factors, operation & control and maintenance. As a mass transportation system, a railway could contain potential risks that may result in a high death rate and property losses. Accordingly, Railroad Safety Technology R&D Corps. is adopting the plan of the construction of Railway Safety Test Facilities as a part of the Railway Total Safety Project to enhance the railway safety, and carrying out researches on effective project management methods with Systems Engineering techniques. Recently, various systems engineering tools such as CORE or Cradle are applied to manage the system requirements and the project management process in the part of the aerospace engineering and automobile engineering so on. The railway industry also makes an effort to develop an efficient management skills using systems engineering tools as the railway system is multi-disciplinary. Therefore, we propose the more effectual management method of constructing the Railway Safety Test Facilities applying the systems engineering tool to the research.

  • PDF

철도건설공사에 적합한 스마트 건설안전기술 적용방안에 대한 연구 (A Study on Application of Smart Construction Safety Technology into Railway Construction)

  • 정성원;오태근
    • 문화기술의 융합
    • /
    • 제10권1호
    • /
    • pp.483-488
    • /
    • 2024
  • 철도건설공사는 많은 예산, 인력, 장비가 투입되고 이에 따른 안전사고도 많이 발생하고 있다. 국가적 차원에서 철도건설현장의 안전사고를 줄이고자 노력하고 있으나 산업재해율은 감소 추세를 보이지 않고 있다. 안전사고를 감소시키고 재해자 수를 줄이기 위하여 그동안 다양한 관리적, 기술적 방법이 적용되었으나 효과가 미미하였고 최근 IoT 기반의 스마트 건설안전기술의 적용을 통해 이를 극복하려고 노력하고 있다. 하지만, 기술 효과에 대한 분석 없이 무분별하게 스마트 건설안전기술을 도입하다 보면 중복 투자가 발생할 수 있으며, 이는 국가 예산으로 건설되는 철도건설공사의 예산 낭비로 이어질 수 있을 것이다. 본 연구는 철도건설공사 관계자 설문조사를 통해 재해사례를 분석하여 발생 빈도가 높은 재해 유형을 파악하고, 해당 재해 유형에 효과가 높을 것으로 판단되는 스마트 건설안전기술을 제안하고자 한다.

시스템 수명주기 관점에서의 철도시스템 RAMS 관리 방안 (Management of RAMS for Railway System in view of System Life Cycle)

  • 이창환;박병노;안헌찬
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.221-225
    • /
    • 2011
  • The railway system consists of many items such as sub-systems, equipments and parts to accomplish the required function. Also the railway system is very complex system that these items are connected with interface among items. According with this complexity, the process of system engineering is applied to the construction of new railway project to manage systematically. In addition, the research about system engineering is progressing in recent. The RAMS management is one part of system engineering, and is to assure the required safety and performance. Also, this RAMS should be managed through system life cycle. This paper show the case study of management of RAMS during construction and operation phase in respect of system life cycle. As a result of this research, the best way of RAMS management based on system engineering in operation phase for railway system is suggested.

  • PDF

고속철도 파일슬래브공법 적용구간에서의 파전파해석 (Wave Propagation Analysis for Pile-Slab Section on High Speed Railway)

  • 이강명;이일화
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.3201-3207
    • /
    • 2011
  • This paper reviewed wave propagation of train vibration based on the study of high speed railway soft ground section with pile slab construction. In a filed of railway, concrete track has been adapted in a railway construction. And in order to maintain its track, soil improving method was required to control residual settlement. Within many soft ground settlement prevention techniques, pile slab method has an effect of minimizing residual settlement of soft ground. This is possible using support embankment load method by construct pile slab or cap the upper soft ground. This paper reviewed vibration wave characteristic of soft ground section with pile slab using numerical analysis application through finite element analysis. Pile slab method is established between high stiffened soft ground and embankment this creates a possibility of vibration block or slab amplification. Thus analyzed of wave propagation was done with roadbed and structure property to confirm application performance of pile slab method of high speed railway structure.

  • PDF

철도역사 승강장 연단부 마감 탈락에 대한 원인 분석 및 개선 방안 (Analysis of the Finishing Failure in the Railway Station Platform and Deduction of Improvement Plans)

  • 고세원;유영수;구본상;김지환
    • 한국건설관리학회논문집
    • /
    • 제23권1호
    • /
    • pp.46-53
    • /
    • 2022
  • 철도 승강장은 승객, 열차 운행의 안전 및 철도 시설에 대한 이미지와 밀접한 관련이 있는 중요 시설물로 철저한 시설관리가 필요하다. 그러나 승강장 연단부에서 이질재료의 줄눈 마감을 위한 마감재가 선로방향으로 탈락하는 현상이 전국에서 다발적으로 발생하고 있어 열차 운행 안정성 및 이용객의 안전 확보를 위해 즉각적이고 지속적인 관리가 필요한 상황이다. 본 연구는 승강장 연단부에서 발생하는 마감재의 탈락 현상에 대한 분석을 통해 개선방안을 도출하고자 하였다. 이를 위해 200여 곳의 철도 역사 승강장 연단부에 대한 마감재 탈락 현황과 이와 관련된 국가철도공단의 설계·시공 기준이 조사되었다. 이후 해당 내용을 기반으로 마감재 탈락 원인이 분석되었으며 그 결과 주된 원인은 시공 중 발생하는 노반-건축 공정 간 경계인 것으로 도출되었다. 이후 도출된 원인과 설계 및 시공기준을 연계하여 (1)마감재료 또는 시공방법 개선, (2)높이 조절 용이한 마감재료, (3)별도 마감방법 고안, (4)마감재의 공정방법 및 내구성과 관련된 개선방안을 제시하였다.

HRM을 통한 철도공사의 조직역량 강화 전략 (Korail's formation capacity strengthening strategy through HRM)

  • 정예성;이신호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 춘계학술대회 논문집
    • /
    • pp.979-984
    • /
    • 2005
  • 2005, National railway was converted from government enterprise form to public corporation form. Korail is facing in necessity to equip new manpower operating system to achieve public enterprise's part and two purposes called profit creation according to conversion to construction system. Accordingly, railway construction work began services for formation diagnostic and job analysis to construct management formation of new paradigm, personnel management course manpower operation system of the job value priority. This dissertation is research for direction establishment of human resource management(HRM) of railway construction work. Examined problem of current personnel management system with trend of HRM paradigm for this. And presented various strategy to construct greeting executive system of job putting first in person putting first and strengthens formation capacity.

  • PDF

콘크리트궤도 적용 경부고속철도의 시공 중 토압 경향 분석 연구 (An analysis study on earth pressure trends during construction of Gyungbu High Speed Railway using Concrete Track)

  • 김기환;김대상;나성훈;신기대
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.671-679
    • /
    • 2010
  • The construction of concrete track for the first time in Korea gives lots of meanings to civil engineering in various aspects. Settlement level needs to be kept minimal for the safety of the track. Concrete track has different structural characteristics comparing to conventional ballast track, so load distribution in concrete track is also different. Since it is the first time to build concrete track, there are very few experience and data available on the subject. Therefore it is important to evaluate how much load is transferred to the ground due to the running vehicle in concrete track and to determine the optimal thickness of layers. In this research, 9 individual earth pressure cells were installed at OOOk930 site in 2nd stage of Kyungbu high speed railway during under construction. The in-situ pressure data were measured at each layers during pump-car and locomotive were moving on the high speed railway surface.

  • PDF

철도부분 설계도서 작성기준의 개선방안에 관한 연구 (A Study on the Improvement of Railway Design Standard)

  • 이태식;곽동구
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 1999년도 춘계학술대회 논문집
    • /
    • pp.52-59
    • /
    • 1999
  • As the Korea construction market has recent3y opened, the needs to restructure the design standard for the technical advancement in design is increasing. Therefore, we proposed the design standard of railway according to the direction, which is presented in this study that analyze the present situation of the previous design standard. The new design standard of railway was tried to definite a limit in each service stage. This design standard will improve the design quality and induce the accumulation of technology. In addition, it will solve the organic contradiction of construction service. As a result, this research will bring the improvement in the design standard and contribute to the development of Korea construction industry.

  • PDF

철도시설물 관리를 위한 리스크 분석기법 적용 방법론 연구 (Development of Risk Analysis Method for Railway Facility Management)

  • 강인석;박서영;윤선미;김현수
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2006년도 추계학술대회 논문집
    • /
    • pp.341-344
    • /
    • 2006
  • Most construction companies recognize the necessity of risk management. The practical application, however, is not easy because of the absence of systematic procedure for risk management and the difficulty in objectification of subjective risk factors. This study suggests a systematic procedure and a web-based analysis system. In the first place for those researches, this study analyzes the present condition of risk management in the railway facility construction industry. Finally, this study defines risk management procedures as preparation, identification, analysis, response and risk analysis method to manage potential risks in the railway construction project.

  • PDF

밀리미터파방식의 열차무선시스템에 관한 고찰 (A study on the train radio system of millimeter wave method)

  • 조봉관
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2002년도 추계학술대회 논문집(I)
    • /
    • pp.465-470
    • /
    • 2002
  • Construction of Yamanashi Maglev Test Line in Japan was proceeded based on "superconducting maglev Yamanshi Testline plan" approved by Ministry of Transport Government of Japan in 1990, which was performed by Yamanashi Maglev Test Line construction project team organized by personnel of Japan Railway Construction Public Corporation, RTRI and Central Japan Railway Company, and overall adjustment test was performed. Yamanashi Maglev experimental project team was organized, sponsored by RTRI and Central Japan Railway Company from April in 1997. Running test for the application was performed by this project team. Technical availability was proved by "superconducting maglev committee" of Ministry of Transport Government in March, 2000. In this paper, train radio system by LCX and by millimeter wave will be reviewed.

  • PDF