Cho Sun-Kyu;Kwon Soon- Sup;Kim Sun-Kon;Lee Jong-Shin;Lee Jong-Min
Proceedings of the KSR Conference
/
2006.11b
/
pp.545-551
/
2006
Along with the steady development of Korean Railway construction technology, Contemporary society needs more modernized structures which can meet not only structural value but also aesthetic and environmental value. To follow this demand of society, Pre-Stressed Concrete U-girder bridge(Somg-Lim Gyo, L=330m) is introduced in 'JINJOO-KWANGYANG RAILWAY CONSTRUCTION PROJECT'. On the environmental point of view, the huge noise due to the operation of train can be reduced remarkably by the side beam of U-girder which is high enough to substitute soundproofing wall. Moreover, by aesthetic variation of the shape of outer beams and coping of piers, the exterior view of the bridge can be improved and in accordance with surroundings. Pre-Stressed Concrete U-Girders which are built up above the outer sides of slab deck make easier to secure the clearance of a bridge and make it possible to lower the distance of centroid between superstructure and railroad tracks.
Lee Hyun-Woo;Lee Young-Joon;Park Young Min;Yoon Mikyung
Proceedings of the KSR Conference
/
2004.06a
/
pp.296-302
/
2004
After the Rio declaration on environment and development in 1992, developed countries are undertaking 'environmentally sustainable transportation (EST)' projects. To meet the needs for EST, current transportation policies in Korea are rapidly reforming and one of its concerns is modernizing and upgrading railway freight system. Planning new railroad construction projects is increasing and subsequent environmental impact assessment (EIA) demands improvements, especially in both the EIA and decision making systems. In this paper, we discuss the present status of EIA for railroad construction projects, especially, by analyzing the EIA documents accumulated for last six years. The EIA for railroad construction projects .accounts for only $4.9\%$ of total project EIAs during 1998-2003. However, the portion is gradually increasing. Major environmental concerns for EIA in railroad construction projects were geomorphological and ecological changes, protection of rare organisms, air pollution, water quality, wast management, noise, etc. We also compared the characteristics of environmental impacts of railroad construction with those of vehicle road construction. The result shows that railroad construction usually requires 3${\~}$4 times longer tunnels and bridges for a given length than vehicle road construction. In addition, the amounts of geomorphological and ecological changes (road-cutting, embankment, devegetation, etc.) in railroad construction were generally less than $40\%$ of those in vehicle road construction. In order to develop environmentally friendly railway systems, monitoring studies for environmental impacts of railroads such as habitat fragmentation and road kills, dispersal of alien plants, tunnelling effects on groundwater and vegetation, and noise impacts are highly required.
In response to the global warming crisis, the Kyoto protocol was established by major developed countries in 1997. The Paris Agreement, which imposes a carbon reduction obligation for both developed countries and developing countries, was signed in 2015. Regulations and efforts to reduce greenhouse gas emissions accordingly have been implemented. In this study, we analyzed the reduction of carbon emissions computerizing of the traditional project management system for efficient railway construction at Korea Rail Network Authority. We suggest a model that measures two major effects of carbon reduction, stemming from transportation and from a decrease of paper use. In this paper, we calculate the amount of carbon reduction and the economic effect of carbon reduction with application of the construction project management system at Korea Rail Network Authority. The model and methodology in this study are expected to be helpful to measure the carbon reduction performance for similar e-transformation.
Recently, the number of passengers using urban railway has been increased by reasons of the reductions of car use due to high fuel prices and the enlightenment about the environment. Above all, the noise and the vibration coming from the friction between the wheel and the rail of trains in operation which is not only a factor that hinders riding comforts but causes civil complaints. Furthermore, the noise has become social issues from tightening the relevant regulations by the government since January 2010. Although ballasted tracks were constructed on urban railways at the time of opening, they have been changed into slab tracks because slab tracks require much less maintenance. However, in view of sound absorptivity of track, slab tracks have 10 times less capability than ballasted tracks(ballasted track : 0.5~0.6/slab tracks : 0.06) results more noise than that of ballasted tracks as much as 3dB(A) since slab tracks emit more reflection noise. Therefore, in order to minimize reflection noise on slab tracks, noise abatement system has been developed as a national R&D program to apply on-site test. It is assumed that the construction technology developed in this study can be used not only as basic data for the on-site test for the noise reduction in urban railway but as an efficient construction method.
In this study, numerical analysis and model experiments were conducted to analyze behavioral characteristics acting on the track roadbed with excavation through steel pipe injection, a non-exclusive method of crossing construction under railroad as primary target. In model experiments that simulate injection excavation behaviors with an increase in the depth of soil cover, the upper displacement was measured by construction of the first and the second pipes in order to predict actual behaviors, and the behavior characteristics were verified through numerical analysis. The investigation results showed that surface displacement was smaller under the condition of higher soil cover. In the case of injecting two pipes, when the first pipe was injected, deformation of the surface increased linearly in both settlement and uplift experiments. However, when the second pipe was injected, the amount of change was found to be very small due to the relaxation and plastic zones around the first pipe. In addition, the results of numerical analysis on the same cross section with the model experiment found that the results of investigation into settlement ratio and volume loss were in very good agreement with those obtained by the model experiment.
A wide metropolitan railway and a metropolitan railway in metropolitan area are transportation systems to cope with possible large demand and are under construction continually. A wide metropolitan railway and a metropolitan railway in metropolitan area are running with low speed because it is difficult to improve train speed according to short distances between stations and topography. There is a few study on improving commercial speed on the existing wide metropolitan railway and metropolitan railway in metropolitan area, but there is no study on a new wide metropolitan railway. This study present speed-up scheme of the Sosa-Wonsi line by enlarging the curve radius, reducing the horizontal steep gradient, reducing the stopping time, speeding up at underground section, and installing the PSD, etc. This scheme is evaluated using the simulation technique.
Many infra suructure such as road, railway, building and utility foundations have been damaged by the repeated freezing and thawing of the soil during winter and spring every year in seasonal frost region. The frost penetration depth is most important factor in the design of structure such as road, railway and building in seasonal frost region. This paper presents the results of calculation of frost penetration depth and frost heaving in concrete track for railway construction. Model concrete track were installed near the railway track in Gangwon, Gyeonggi, Choongbuk province and frost penetration depth were measured using methylene blue frost penetration depth gauge. Model concrete track in Cheolwon, frost heaving of concrete track were also evaluated. The measure of maximum frost penetration depth and frost heaving can be applied to design railway track for cold region in Korea.
Journal of Korean Society of Disaster and Security
/
v.13
no.1
/
pp.13-23
/
2020
In 2005, Urban railway seismic design was introduced in Rep. Of Korea, and many studies on seismic performance evaluation and reinforcement methods were conducted. In accordance with the Enforcement Decree of the Earthquake Disaster Countermeasures Act issued in March 2009, during April 2010 to October 2013, some of local governments established detailed evaluation and reinforcement measures for seismic performance of the urban railway underground structure. Afterwards, the seismic performance reinforcement of the existing urban railway structures was conducted for the sections that a long period of used until the end of 2018, and the reinforcement works are carried out by various methods using the previously studied methods. However, various reinforcing materials and construction methods using have been studied, but the classification research on the construction methods currently applied to reinforcement construction of urban railways is insufficient. The purpose of study is to analysis the cases currently applied to seismic reinforcement construction and to show the characteristics of each construction method, the reasons for its application and problems.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.