• 제목/요약/키워드: Railway capacity

Search Result 480, Processing Time 0.025 seconds

The Improvement of Usability for Train Toilet Design

  • Han Seok-Woo;Jin Mi-Ja
    • Archives of design research
    • /
    • v.19 no.3 s.65
    • /
    • pp.195-206
    • /
    • 2006
  • Design for improved usability is to understand products from the user's point of view so eventually to enhance the pleasantness users by reflecting it into the design. The philosophy of user-oriented design is an essence of human-centered product planning, and its application is more important for railway vehicle design, which is closely connected with everyday life. This study focused to define basic elements of train interior design concept, which considers convenience and comfort for passengers, by extracting and interpreting ergonomic requirements, as usability factors, of train toilet design. The study on user-oriented design of trains consists of the practice of sensibility engineering for the management of customers' emotions and its harmonious use on design, and aims on the embodiment of new ergonomic design. In the center, it has analyzed the criteria and characteristics of the user-oriented design and has concluded the design direction and components to a concrete idea and proposed prototypes, which may become a good example for train interior design later on. In addition, it proposes a direction, which may become a guideline of ergonomic design, to secure competition capacity. Moreover this study is concentrated on the physical environment and human behavior of train toilet users, on the analysis of factors necessary for adequate toilet design, and on the understanding of interface between its users. What is more, it proposes a module of development process and methods of approaching the interface. The study presents a design standard, under which the concrete data of the characteristics and practicable range and the convergent demands accelerate to the module could be confirmed and criticized. The study on the usability is going to contribute to more pleasant and comfortable train environments and consequently, it's going to create new values of increased railway competitiveness by design.

  • PDF

Application of a Simple Non Destructive Test Method to Obtain the Dynamic Modulus of Asphalt Mixtures used for an Asphalt Trackbed Foundation (아스팔트 노반 설계를 위한 간이 비파괴시험에 의한 동탄성계수 취득방법 적합성 분석)

  • Lim, Yujin;Lee, SeongHyeok;Lee, JinWook;Lee, ByeongSik
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.2
    • /
    • pp.114-122
    • /
    • 2014
  • An asphalt trackbed is to be adapted in Korea to provide better bearing capacity and stability to the track and a comfortable ride to passengers. The dynamic modulus of Hot Mixed Asphalt(HMA) mixes is a critical design input parameter to determine the thickness of the asphalt trackbed. In this study, impact resonant tests and ultrasonic test methods are designed to obtain the dynamic modulus. These test methods are also verified to check the etffectiveness of constructing a master curve of the dynamic modulus over a wide range of frequencies and temperatures. The test results are compared to the computed dynamic modulus using AASHTO 2002 and the KPRP's proposed model. It can be concluded that the proposed simple test methods are effective to obtain the dynamic moduli of the asphalt mixes for the design of an asphalt trackbed foundation.

Bending Fatigue Life Assessment of Aged CWR using the Field Test (현장측정을 통한 노후레일의 휨 피로수명 평가)

  • Park, Yong-Gul;Sung, Deok-Yong;Park, Hong-Kee;Kong, Sun-Yong
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.3
    • /
    • pp.317-325
    • /
    • 2008
  • As a result of recent research, it is reported that the periodic replacements criterion of rails is able to extend as grinding rail surface and using the continuous welded rail (CWR). This study evaluated correlation between conditions of track and load capacity of rail by analysing the dynamic response of track while the metro train is running. Also, it was converted the measured stress waveform into stress frequency histogram by the rain-flow counting methods, and then accumulated fatigue damage ratio and remaining service life of laid rail were calculated so as the apply the equivalence of stress to S-N curve of a new welded rail. Finally, this study suggests a revision of the periodic replacements criterion of CWR, which was based on accumulated passing tonnage, classified by the types and conditions of track system.

Logicality Estimate for Domestic the Periodic Replacement Criteria of CWR based on Accumulated Passing Tonnage (누적통과톤수에 의한 국내 레일교체기준의 타당성 평가)

  • Park, Yong-Gul;Suh, Sang-Kyo;Choi, Jung-Youl
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.3
    • /
    • pp.326-333
    • /
    • 2008
  • This study is objected by presenting preliminary data to revise the periodic replacement criteria of continuous welded rail (CWR) in using. In this study, it is investigated information resources for foreign standards, the cause and types of damage in welded rails and the track maintenance history of Seoul metro to analysis the correlation between rail failure and accumulated passing tonnage. Also, it is performed bending test for the laid welded rail reaching the periodic replacement criteria. In result, the correlation between rail failure and accumulated passing tonnage is not obvious and it is a lot of cases for the construction error of welded rail. Also, as a result of bending test of laid welded rail, according to reducing about $17{\sim}18%$ the bending fracture strength of rail, the laid welded rail reaching the periodic replacement criteria is well enough ensured for the load carrying capacity of rail.

A Study on the Protection System on the Electric Railways (전철급전회로 보호시스템에 관한 연구)

  • Chang, Sang-Hoon;Lee, Chang-Moo;Han, Moon-Seob;Oh, Kwang-Hae;Shin, Han-Soon;Kim, Jung-Hoon
    • Proceedings of the KIEE Conference
    • /
    • 1998.07c
    • /
    • pp.1166-1169
    • /
    • 1998
  • The Load characteristic of electric railway requires the power demand of the high capacity which amplitude is spacial-temporally fluctuated due to frequent starting and stopping with large tractive force. The conventional electric railway mainly consists of the resistance controlled and the thyristor controlled locomotives, are compensated for their bad characteristics of the power factor$(70\sim80%)$ with installation of another capacitor improving power factor at the substation. Since 1994, VVVF train car with good characteristics of power factor(100%) have been introduced and operated in Kwa-Chon Line. From the present technical tendency, it is judged that introduction of the locomotive with various controlled methods is necessary. The protective equipments installed at the substation are complicated and various aspects to detect faults and reduce their extension, so the universal countermeasures are required. Specially in the case of the fault occurrence it is difficult to calculate the fault location because of the change in the contactline constant according to modifying the characteristics of the contactline (the dualized catenary wire and extension, etc), so much time is required for the detection of fault location. In BT-fed method distance-relays and fault-locators are not installed, we have so many difficulties in the quick accident recovery.

  • PDF

Effect of thermal regime on the seismic response of a dry bridge in a permafrost region along the Qinghai-Tibet Railway

  • Zhang, Xiyin;Zhang, Mingyi;Chen, Xingchong;Li, Shuangyang;Niu, Fujun
    • Earthquakes and Structures
    • /
    • v.13 no.5
    • /
    • pp.429-442
    • /
    • 2017
  • Dry bridges have been widely applied in the Qinghai-Tibet Railway (QTR) to minimize the thermal disturbance of engineering to the permafrost. However, because the Qinghai-Tibet Plateau is an area with a high potential occurrence of earthquakes, seismic action can easily destroy the dry bridges. Therefore, a three-dimensional numerical model, with consideration of the soil-pile interactions, is established to investigate the thermal characteristics and their impact on the seismic response of the dry bridge in permafrost region along the QTR. The numerical results indicate that there exist significant differences in the lateral displacement, shear force, and bending moment of the piles in different thermal conditions under seismic action. When the active layer become from unfrozen to frozen state, the maximum displacement of the bridge pile reduces, and the locations of the zero and peak values of the shear force and bending moment also change. It is found that although the higher stiffness of frozen soil confines the lateral displacement of the pile, compared with unfrozen soil, it has an adverse effect on the earthquake energy dissipation capacity.

A Study on the Additional Train Scheduling Method (열차 증편방법에 관한 연구)

  • Kim, Young-Hoon;Rim, Suk-Chul
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.4
    • /
    • pp.313-319
    • /
    • 2014
  • Additional train scheduling is often required to increase the capacity of transporting passengers or freight. In most previous studies on scheduling additional trains, operation time of the added train is designated first; and then the train operation feasibility is examined. However, it is often difficult to apply this approach to domestic trains because the density of the railroad network in Korea is high and various types of trains are in use. Moreover, for freight trains, it is even more challenging because the delay is accumulated due to lower priority whenever a freight train and a passenger train contend for a common segment of rail. In this paper, we address the additional train scheduling problem which entails finding a feasible schedule for an additional train having a fixed departure time or departure time windows. The problem is modeled as a mixed integer programming and a column generation technique is used to solve it.

The Research on Transportation Systems Development in Sejong City (세종특별자치시의 발전을 위한 교통체계 연구)

  • Ju, Yong-Jun;Ryu, Chang-Su;Park, Hyo-Sun
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.18 no.11
    • /
    • pp.2738-2744
    • /
    • 2014
  • For balanced development of the Sejong City, early settlement in transport infrastructure should precede the most. Of various means of transport, this study focus on BRT(Bus Rapid Transit) and the railway. Than the subway construction costs only a tenth. Equipped with a system of underground transport capacity to significantly increase the new concept of public transport in the BRT, utilizing the existing line railway to be constructed broad Chungcheong. The extension revolves 1 line of Daejeon subway to Jeongbuse kind government complex and the communication facilities is cooked for the rapid increase in the transportation demand according to the before central administration organization and Sejong city inflow of population.

On the Availability of Han river as Water Transport Route (수상운송로로서 한강의 이용가능성에 관한 연구)

  • Choi, K.I.;Roh, H.S.;Lee, C.Y.
    • Journal of Korean Port Research
    • /
    • v.7 no.2
    • /
    • pp.37-60
    • /
    • 1993
  • Because of the rapid growing traffic volumes of cargo, especially between Seoul and Inchon, and lack of investment into transport infrastructure in the past, in Kyong-in area have suffered from the serious traffic congestion in the public-road and the express-way network, But the further expansion of the traffic volume in near future is difficult due to burden of the higher expansion of the traffic volume in near future is difficult due to burden of the higher construction cost. Although the traffic congestion on the Kyung-in railway, is not very serious comparing with the road sector, the shortage of capacity on some main lines becomes emerged as a problem as railway traffic has increased. Unlike these two modes, the water transport, which has been paid relatively less attention for commodity transport in Kyong-in area, has not any constaint in this respect. Han river has been used as a water transport route in Chosun Dynasty which is called Cho-wun. This paper therefore aims to propose the availability of Han river as the alternative water transportation mode, in order to decrease the congestion between Seoul-Inchon by considering the construction of Kyong-in artificial water channel in near future. In this paper, we investigate the availability of Nanji-do as the physical distribution depot connecting with the circulation express way in the national capital distribution depot connecting with the circulation express way in the national capital. We also estimate the traffic volume by using the push-barge carrier (300DWT) in the same channel through the simulation under some assumptions such as ship's turnaround time, speed, etc.

  • PDF

Evaluation of Installation Length of CWR Considering Rail Tenser's Capacity And Track Maintenance (레일긴장기의 성능을 고려한 효율적인 장대레일 설정방법)

  • Park, Ok-Jeong;Kim, Eung-Rok
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.72-79
    • /
    • 2010
  • The significant of continuous welded rail (CWR) management is growing because KORAIL has the plan to convert the whole of conventional railway lines into CWRs through continuous activities since constructed the CWR track with 1.8km in Gyeongbu line in 1966. The CWR recently is needed a efficient management method because it is difficult to manage the CWR by the poor of technic and equipment, limited maintain labor force and shorted the maintain work time of CWR caused by industrialization, greenhouse effect and global warming In this point, The 70ton Tenser's which is using in the rail site has been analysised with no extra tenser's capacity in case of the under low temperature and exceed the length of 1km as a result of reviewing the CWR-related rules and standards, a series of records of safety accidents, operation obstacles, and the situation of broken rails published by KORAIL, existing rail temperature measurements, and CWR researches. Therefore avoid the excessive plan of the first set-up section, choice the proper time in the normal temperature that is possible to weld the rail, turning the difference of rail temperature and Installation temperature down is desirable.

  • PDF