• Title/Summary/Keyword: Railway capacity

Search Result 480, Processing Time 0.024 seconds

Examples of Trolley Wire Resistance Influential on The Movement of Tensioning Devices (장력조정장치의 동작에 영향을 미치는 가선저항의 사례)

  • Yoon, Yong-Han;Yim, Geum-Kwang;Han, Yang-Gyu
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.886-892
    • /
    • 2007
  • This paper presents examples of trolley wire resistance influential on the movement of tensioning devices. Therefore, this study is on the examples of trolley wire resistance which keep tensioning devices from working properly to the expansion and contraction in accordance with temperature change of overhead trolley wire system such as messenger wire and contact wire. Trolley wire resistance interrupts the working of tensioning device and drops the capacity of trolley wire. Reduced trolley wire capacity lowers the performance of current collection and has a bad effect on electrical train operation. So it is desirable to reduce the factors increasing trolley wire resistance to the minimum from the designing and construction stage of overhead trolley wire system. This study will introduce this problem and suggest the solution.

  • PDF

The Functions and Roles of Bimodal Tram in the Public Transportation System (대중교통체계에서 바이모달 트램의 기능과 역할)

  • Yoon, Hee-Taek;Park, Young-Kon;Chang, Seky-Mok;Mok, Jae-Kyun
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.2463-2466
    • /
    • 2008
  • The public transportation in operation or to be planned domestically includes subway, LRT, bimodal tram and bus, which are independently characterized in their passenger capacity and cost. High quality service is generally accompanied by high cost of construction and operation. Thus, ITS, BIS/BMS and BRT system are recently introduced to provide high quality service to the passengers with the cost as low as possible. The bimodal tram is under development to achieve such goals in public transportation. The passenger capacity is approximately expected to be 10,000$\sim$17,000 persons/hour and the construction cost to be 10$\sim$30 million dollars/km. It is possible to construct the infrastructure gradually depending on the demand of transportation in the planned route, which can effectively reduce the initial cost to launch the service. The bimodal tram is developed to provide the advantages of subway and bus to the passengers with respect to the scheduled operation and flexibility of the lines.

  • PDF

A study on constructing CWR for railroad under operation (기존선 급곡선부의 장대화 방안에 대한 연구)

  • Yang, Sin-Chu;Noh, Hyuk-Chun;Kim, Eun;Lee, Jong-Duk
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.303-310
    • /
    • 2001
  • The railroad under operation has very sharp curves and the state of ballast is somewhat deteriorated due to the traffic loads, which put some constraints in converting the conventional rails into CWR. In making CWR, the determination whether the ballast has sufficient capacity for resisting buckling must be made, quantitatively and qualitatively, and schemes to guarantee the required lateral resistance of ballast should be proposed. In this study, using the in-situ investigated data, the probability of buckling of CWR is given for several installation temperatures for CWR. The effect of tamping, DTS, and sleeper spacing are taken into account. The buckling probability is given as a function of curvature and installation temperature of CWR and works used to increase the ballast resistance capacity after tamping, i.e., DTS and reduction of sleeper sparing.

  • PDF

Prediction and Evaluation of Characteristics of Air Spring for Railroad Vehicle (철도차량용 공기스프링의 특성 예측 및 평가)

  • Kim, Wan-Doo;Hur, Shin;Kim, Suk-Won;Kim, Young-Gu
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.626-633
    • /
    • 2000
  • An air spring which is a part of the railroad vehicle suspension system is used to reduce and absorb the vibration and the noise. Main components of the air spying are a cord reinforced rubber bellows, a upper plate, a lower plate and a stopper rubber spring. The characteristics of the air spring which are the load capacity, the vertical and the horizontal stiffness are depended on the configuration of rubber bellows, the angle of cord and the mechanical properties of cord. The computer simulation using commercial finite element analysis codes are executed to predict and evaluate the load capacity and the stiffness. The appropriate shape and cord angle of the air suing are selected to adjust the required performance of the air spring. Several samples of the air spring are manufectured and experimented. It is shown that the results by computer simulation are in close agreement with the test results.

  • PDF

Theoretical Study for the Resonance Speed and Frequency in Roadbed on the Base Rock (암반상 토노반 구간에서의 공진 속도 및 주파수에 대한 이론적 연구)

  • Lee Il-Wha;Hwang Seon-Keun;Lee Su-Hyung;Choi Chan-Young
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.443-447
    • /
    • 2005
  • When the high-speed train running on the track, there is a speed band which track distortion is unusually increased according to the condition of track and roadbed. This speed is called critical velocity and physical parameter value increased greatly. These phenomenon happened as high-speed train were developed, studied regularly through TGV 100 running test in France. As research result until now, the main reason is soft roadbed's capacity. Wave propagation and track support capacity is varied by the site characteristics. This paper achieved theoretical examination about resonance band(speed and frequency) that occurred in roadbed on the base rock in point of geotechnical engineering. The examination of resonance divides with ground response analysis, critical band analysis by the shear wave velocity of roadbed, train critical speed through the ground stratum.

  • PDF

Development of the Cement Mortar Grouting type Paved Track for Existing Line (기존선용 시멘트 모르터 충진형 포장궤도의 개발)

  • Lee Il-Wha;Lee Hee-Up;Lee Jun-Seok;Lee Jin-Wook
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.389-393
    • /
    • 2005
  • When the high-speed train running on the track, there is a speed limit which track distortion is unusually increased according to condition of track and roadbed. This speed limit is called critical velocity, and physical parameter value increased very greatly. These phenomenon happened as high-speed train were developed, studied regularly through TGV 100 running test in France. As research result until now, the main reason is soft roadbed's capacity. Wave propagation and track support capacity is varied by the site characteristics. This paper achieved theoretical examination about resonance band(speed and frequency) that occurred in roadbed on the base rock in point of geotechnical engineering. The examination of resonance divides with ground response analysis, critical band analysis by the shear wave velocity of roadbed, train critical speed through the ground stratum.

  • PDF

Power Load Density Analysis considering Structure and Characteristics of Subway Stations (지하철 역사의 구조 및 특성을 고려한 동력부하밀도 분석)

  • Jung, Hyun-Ki;Cha, Kwang-Seok
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.912-920
    • /
    • 2006
  • The purpose of this study is to present the design standard for load density in subway station. From the data of electric equipment capacity and electric power consumption for 43 subway stations, current levels of the load density and excess capacity factor were surveyed and analyzed, In addition mean value, standard deviation, maximum value, median value and correlation coefficient were evaluated through excel program. Also it was carried out the regression analysis. The estimation method of load density and design criterion were studied. As a result, load density in this thesis have been proposed : 51.3 $[VA/m^2]$ on the general power load can be a standard value for subway station.

  • PDF

A Study on the Establishment and Application of Evaluation Criteria for Old Railway Station Considering the Level of Railway Service (철도 서비스수준을 고려한 노후철도역사 평가기준 마련 및 적용방안)

  • Kim, Kyung Ho;Kim, Si Gon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.44 no.1
    • /
    • pp.101-108
    • /
    • 2024
  • The total number of railroad stations managed in Korea is 322 (including general and wide-area railways), and a considerable number of stations are aging. In terms of the size of the existing railway station and the number of entrances, it has not been possible to secure adequate service capacity, and the demand for station improvement is increasing due to changes in surrounding conditions such as urban development. In the past, railroad stations were focused on the simple function of a connection passage in terms of maintenance or management, but in recent years, railroad stations are also changing to an atmosphere that they should be reborn as a user-centered comfortable, convenient, and safe service provision space. In this study, a case study related to the improvement of the old railway station was conducted to derive an improvement plan that meets the improvement standard of the old station, and the service level evaluation standard was developed. By introducing the concept of service level (LOS) in the development model, station congestion, station movement convenience, and station safety were selected as evaluation indicators. In addition, this development model applied an analytical stratification technique to divide various evaluation elements of each indicator into major and detailed elements and derive the relative importance of the elements by class. Priority for improvement was derived using the ratio of the number of E and F on the LOS for each facility. Based on this study, it is expected to be helpful in using it as an evaluation criterion for improving objective and equitable railway station.

A Study on Construction of Metro Rapid Transit Network in Daegu Area (철도와 지역발전 - 대구권 광역전철망 구상과 지역발전 효과)

  • Han, Keun-Soo
    • Proceedings of the KSR Conference
    • /
    • 2008.06b
    • /
    • pp.27-41
    • /
    • 2008
  • Construction of metro transportation infra is a large-scale project requiring tremendous financial resources. This study suggests operation method to use for rapid transit line existing infra such as Gyeongbu line and spare line capacity following second phase KTX construction. Reviewing various constraints of metro rapid transit operation, we found that the conditions for metro rapid transit operation are already satisfied in Daegu area, just like the case of Gyeongbu line in Seoul Metro area. Also, the evaluation of the economic feasibility of metro rapid transit operation in Daegu area shows that B/C is about 2.4, which implies that there is sufficient economic feasibility. According to the result of sensitivity analysis, the project is economically feasible unless the passenger demand decreases 15% and construction costs increases more than 70%. B/C is evaluated large because the utilization of already exiting infra lowers the initial cost. As one of mass transportation system of large capacity, metro rapid transit can generate significant spillover effect: It will strengthen competitiveness of metro area by connecting cities within the area and by extending one-day life zone of the area, to say nothing of the benefit of improving traffic condition. The construction of metro rapid transit network is necessary for the mass transportation system of Yeongnam area as well as Daegu area, and it may work as a starting point for uniting Daegu and Gyeongbuk and strengthening regional competitiveness.

  • PDF

Skin Friction Properties of SIP Pile through Direct Shear Test (직접전단 시험에 의한 SIP 말뚝의 주면마찰 특성 고찰)

  • 천병식;임해식;김도형
    • Proceedings of the KSR Conference
    • /
    • 2001.10a
    • /
    • pp.558-561
    • /
    • 2001
  • SIP(Soil cement Injected Precast pile) that inserts a precast pile after injecting a cement paste into a boring has been applied rapidly through the change of construction circumstances. But there isnt any logical equation of a bearing capacity fitted to SIP yet. So Meyerhof equation has mainly been used to predict a bearing capacity in a design stage instead. But it has shortcomings such as lack of confidence because it has derived not from a theory but from an experience obtained from the result of SPT (Standard Penetration Test) and because a penetration depth tends to be deeper by an excessive design that depends on an end bearing capacity of a pile more than a skin frictional resistance. In this study, thereupon, a direct shear test in the laboratory was performed to both SM and SC soils in variable conditions to verify skin friction properties for the purpose of presenting some reasons capable of reducing penetration depths. Through the tests, soil to soil of SM in cohesion, rough panel to soil of SM in friction angle and soil to soil of SM in shear strength tended to be high. And a shear strength increased as its total unit weight increased in all cases.

  • PDF